ClickCease Repair & Maintain Airfield Stormwater System Phase II | Closed - MatchAwards

Repair & Maintain Airfield Stormwater System Phase II

Status
Closed, the response deadline passed on Aug 10, 2026
Agency
United States Department of the Air Force
Office
DOBBINS AFB, USA
Notice type
Presolicitation
Solicitation number
FGWB21000AB_3
NAICS
237110 - Water and Sewer Line and Related Structures Construction
PSC
Z2NZ - REPAIR OR ALTERATION OF OTHER UTILITIES
Category
Facility Related Services (4.4)
Posted
2026-06-24
Deadline
2026-08-10
Place of performance
Marietta, Georgia 30069, UNITED STATES

Description

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in June 2026

More lists