ClickCease B-52J Commercial Engine Replacement Program Airfield… | Closed - MatchAwards

B-52J Commercial Engine Replacement Program Airfield Runway/Taxiway Light Removal and Replacement

Status
Closed, the response deadline passed on Jun 5, 2026
Agency
United States Department of the Air Force
Office
JBSA LACKLAND, USA
Notice type
Solicitation
Solicitation number
FA301626Q0118
NAICS
238210 - Electrical Contractors and Other Wiring Installation Contractors
PSC
J062 - MAINT/REPAIR/REBUILD OF EQUIPMENT- LIGHTING FIXTURES AND LAMPS
Category
Industrial Products Install / Maintenance / Repair (5.5)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2026-05-29
Deadline
2026-06-05
Place of performance
JBSA Lackland, 78236

Description

The contractor shall provide all personnel, equipment, tools, materials, supervision and all other items or services necessary to perform the requirements as described in this Statement of Work (SOW) at JBSA Lackland, Kelly Airfield, TX. Replace the raised lights/signs after the B-52 taxis or is towed to the runway as defined in this SOW. Contractor shall be responsible for ensuring the B-52 has access to Boeing from the runway and ensure the lights/signs are restored back to original condition. The runway and taxiway lights and signs, as described in this SOW, are included in this contract. Attachment 1 - BPA B52 Runway Lighting SOW 11 May 26 Attachment 2 - SCA WD 2015-5253 Rev 29 - 30 Apr 26 Attachment 3 - PoSA Runway - Taxiway Lights and Signage Attachment 4 - Schedule B B-52 CERP Airfield Lighting BPA Price List Attachment 5 - Combined Q and A - FA301626Q0118 29 May 26 Proposal Due: Friday, 05 June 2026 at 11:00 AM, CDT

Attachments

Source notice

More from United States Department of the Air Force posted in May 2026

More lists