Repair Intersection Runway 03-21 & 15-33
- Status
- Closed, the response deadline passed on Jun 18, 2026
- Agency
- United States Department of the Air Force
- Office
- JOINT BASE CHARLESTON, USA
- Notice type
- Solicitation
- Solicitation number
- FA441826R0012
- NAICS
- 237310 - Highway, Street, and Bridge Construction
- PSC
- Y1BD - CONSTRUCTION OF AIRPORT RUNWAYS AND TAXIWAYS
- Category
- Construction Related Services (4.2)
- Posted
- 2026-06-16
- Deadline
- 2026-06-18
- Place of performance
- Charleston AFB, South Carolina 29404, UNITED STATES
Description
Includes performance of construction contract administration (Critical Path Method Scheduling, submittal management and closeout), multi-discipline efforts involving work on a secure Runway. Additionally, relevant performance includes performance of multi-discipline efforts involving removal and replacement of 136 individual pavement panels that measure 25 ft wide x 25 ft long x 24 inches deep, located at the intersection of the primary and secondary runway. Ability to perform work between hours of 2300-0700 hours Thursday through Monday. The work involves 3 primary activities each night including saw cutting, removal and installation of temporary panels, and placement of permanent panels. Show ability to construct permanent panels from fast setting concrete, capable of achieving the strength to handle aircraft traffic during a 3 -4-hour cure period. The runway intersection shall be open for daily aircraft traffic each morning. The project necessitates specialized capabilities and equipment, such as sawing and removal equipment for 24-inch pavement and volumetric mixers, sufficient in quantity to place a minimum of 50 cubic yards of fast setting concrete. Ancillary work includes milling and overlay of existing asphalt shoulders, installation of new runway centerline and edge lightings within the limits of work, installation of runway markings, pavement grinding for smoothness and pavement grooving, and incidental work that is similar or greater in scope, magnitude, and complexity than the effort described in this solicitation (Runway Asphalt and Concrete Repair and The evaluation of past performance information will take into Paving). Last, show ability to provide a work force capable of gaining clearance onto a secure flightline
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
Contacts
- Brian T. Hawk
- Robert R. Melton
Email and phone are in the source notice.
More from United States Department of the Air Force posted in May 2026