<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/116379410413529262" -->

---
title: A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ | Closed - MatchAwards
description: A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ. United States Department of the Air Force. Solicitation FA8212-22-R-0025. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2022-08-04. 1. This is a formal solicitation or a Request For Proposal (RFP). The RFP is in...
canonical: https://matchawards.com/dept_of_the_air_force/posts/116379410413529262
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/116379410413529262
og:description: A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ. United States Department of the Air Force. Solicitation FA8212-22-R-0025. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Deadline 2022-08-04. 1. This is a formal solicitation or a Request For Proposal (RFP). The RFP is in...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# A-10 POD ASSY MLG Fairing LH & RH 5 YR IDIQ

Status

Closed, the response deadline passed on Aug 4, 2022

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

HILL AFB, USA

Notice type

Solicitation

Solicitation number

FA8212-22-R-0025

NAICS

[336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing](/groups/560)

PSC

1560 - AIRFRAME STRUCTURAL COMPONENTS

Posted

2026-04-08

Deadline

2022-08-04

Place of performance

UNITED STATES

## Description

1\. This is a formal solicitation or a Request For Proposal (RFP). The RFP is in accordance with Federal contract law. 

<!-- mobian-agent-ad sponsored="true" id="322fd69b-f238-48d7-81b5-15618813660f" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


2\. IAW 5.207(c )(16), Synopsis Description, All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency and must be technically qualified for award (FAR 9.202). 

3\. Acquisition Type: Full & Open Competition to Qualified Manufacturers – No Set-Aside. If a large firm, subcontracting plan is required with the bid. 

4\. Contract Type: FFP Production Contract – Replenishment Parts – 5 YR IDIQ

**5\. REQUIREMENT A-10 SPARES:** 

1. **PN: 162J611521-1003A NSN: 1560-01-592-6923FJ, A-10 POD ASSY MLG Fairing LH (1EA First Article + 3EA Production Articles)**

**PLUS: Option Qty 8EA:** Contractor shall state minimum qty per order (if applicable, if not applicable "N/A") Min Qty\_8\_\_\_. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $\_\_2\_\_; Yr 2 (FY2024) $\_2\_\_\_; Yr 3 (FY2025) $\_\_2\_\_\_; Yr 4 (FY2026) $\_\_2\_\_\_

1. **PN: 162J611521-1015A NSN: 1560-01-592-2577FJ, A-10 POD ASSY MLG Fairing RH ((1EA First Article + 3EA Production Articles)**

**PLUS: Option Qty 8EA:** Contractor shall state minimum qty per order (if applicable, if not applicable "N/A") Min Qty\_8\_\_\_. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $\_\_2\_\_; Yr 2 (FY2024) $\_2\_\_\_; Yr 3 (FY2025) $\_\_2\_\_\_; Yr 4 (FY2026) $\_\_2\_\_\_

6\. Higher level contract quality certification required. Potential offerors must submit AS9100 certification or higher with the bid and with the Source Approval Request (SAR), if not a qualified manufacturer. 

7\. Acquistion Threshold and Scope: Per the Independent Government Estimate (IGE) the total estimated acquisition value is greater than the $5M threshold but less than the $25 threshold. The Government does not have the authority and clearance to exceed this acquisition scope. 

8\. Projected Acquistion Schedule: Award within 60 days after RFP close-out date.

9\. Export controlled data available only to DoD contractors that are potential offerors. Foreign participation is not permitted. 

10\. **TDP.**  Offers shall be IAW the current TDP. The qualified manufacturer shall build and deliver on-time serviceable quality A-10 parts to the USAF. To meet the requirement the qualified manufacturer is responsible for reviewing the entire TDP before bidding on the requirement and identifying any discrepancies in the TDP preventing the manufacturer from meeting the inspection clause(s) of delivering serviceable assets in reasonable time to resolve the discrepancies and bid on-time. 

11\. **TDP Access:** The PCO is the point of contact for TDP access. The current TDP is attached to SECTION J of the RFP/Contract. The zip files must be downloaded from SAM.gov. To download the zip files from SAM.gov search for the RFP# FA8212-22-R-0025 and e-mail the PCO to approve access request to the controlled files. The request must be for official business only. DoD contractors must provide their CAGE code and if they are interested in bidding on the requirement before the PCO can approve the access request. The pre-award PCO is leslie.evans.1@us.af.mil and for post-award, the assigned PCO. 

Data Package (Bid Sets)

**NSN**

**PR**

**IMAGE COUNT**

**LOCATION**

1560-01-591-6923FJ

1560-01-592-2577FJ

FD2020-22-00584

**756**

SAM.GOV

11\. Acquisition Subject to Qualification Requirement. Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the military aircraft, the A-10s, and thus the spares are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency; however, only a qualified responsible manufacturer may receive the award per FAR 9.2\. Qualification Requirements, and FAR 9.1, Responsible Prospective Contractor. New sources may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS). If the offeror is not a qualified manufacturer at the time of bidding and has not submitted a SAR yet, the bid must include a complete SAR package in order to be accepted as a complete bid and be considered for award. Please note, the Govt intends to award as soon as possible, within 30 days after the RFP closed and the Govt has up to contract award to qualify new sources; however, contract award shall not be delayed to qualify new sources per FAR 9.202 (e). The Contracting Officer need not refer challenges to the qualification requirements to the Small Business Administration (SBA) per FAR 9.202(d). 

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0c4591b0066a4323bf44c74f84fe10c1/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/119e17c5faed48d9be10bbd32a3db597/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1fd31cd314b74024a793b103589292a6/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2786b7f7ba204c6e802bd2e36936f920/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/308a7aae909547d2b77c0409e4a65e17/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/319eaffcba80435fbd86e6535db6835d/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/44f2791696c44fdcad94ec32fc3e363e/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4baea070d90d4aa9bc1fd3549eac05c9/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/67a0cca78ca1485da17446aab9bc2e3c/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/751b7d81756241efbccc74990bc3198f/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7ba9abf7a9a54143bc81a1b0ec903026/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9489fc73a00e466c8560bbf014ed96c0/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ac874d304094053bb8ca8ac832e8097/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a3f6abf4912a48869b27fed2c0fe48e0/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b0bb4a19ea7b4751a776cdab223c5cd7/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b890047ad55040128214db0a4fb6d3b2/download)
* [Attachment 17](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bce7e0a4289e433897ee3a00070b60df/download)
* [Attachment 18](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c2f830d636dc4984be5125d0b9cb9206/download)
* [Attachment 19](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c30979114b5543e58b8994c98ab19cd0/download)
* [Attachment 20](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c7e4650d30bf49c3a81a75360bf4012b/download)
* [Attachment 21](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cdd58fc3721843a797f14f87fdf420c4/download)
* [Attachment 22](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d17543253d2f4e1586e7fea8c1cb51e5/download)
* [Attachment 23](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d6632bf31d064e01aa7389af1535502a/download)
* [Attachment 24](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e10d43e445c245a4843b61b6d570c5cb/download)
* [Attachment 25](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ee2228ffdba9436c85cbef1198340158/download)

[Source notice](https://sam.gov/workspace/contract/opp/fd09a169e37d4b7d930dfac0cfd9f682/view)

[More from United States Department of the Air Force posted in April 2026](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2026-04)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"A-10 POD ASSY MLG Fairing LH \u0026 RH 5 YR IDIQ","description":"1. This is a formal solicitation or a Request For Proposal (RFP). The RFP is in accordance with Federal contract law. 2. IAW 5.207(c )(16), Synopsis Description, All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency and must be technically qualified for award (FAR 9.202). 3. Acquisition Type: Full \u0026 Open Competition to Qualified Manufacturers – No Set-Aside. If a large firm, subcontracting plan is required with the bid. 4. Contract Type: FFP Production Contract – Replenishment Parts – 5 YR IDIQ 5. REQUIREMENT A-10 SPARES: PN: 162J611521-1003A NSN: 1560-01-592-6923FJ, A-10 POD ASSY MLG Fairing LH (1EA First Article + 3EA Production Articles) PLUS: Option Qty 8EA: Contractor shall state minimum qty per order (if applicable, if not applicable \"N/A\") Min Qty_8___. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $__2__; Yr 2 (FY2024) $_2___; Yr 3 (FY2025) $__2___; Yr 4 (FY2026) $__2___ PN: 162J611521-1015A NSN: 1560-01-592-2577FJ, A-10 POD ASSY MLG Fairing RH ((1EA First Article + 3EA Production Articles) PLUS: Option Qty 8EA: Contractor shall state minimum qty per order (if applicable, if not applicable \"N/A\") Min Qty_8___. Unit price sheet for each out years (after FA acceptance, if required): Yr 1 (FY2023) $__2__; Yr 2 (FY2024) $_2___; Yr 3 (FY2025) $__2___; Yr 4 (FY2026) $__2___ 6. Higher level contract quality certification required. Potential offerors must submit AS9100 certification or higher with the bid and with the Source Approval Request (SAR), if not a qualified manufacturer. 7. Acquistion Threshold and Scope: Per the Independent Government Estimate (IGE) the total estimated acquisition value is greater than the $5M threshold but less than the $25 threshold. The Government does not have the authority and clearance to exceed this acquisition scope. 8. Projected Acquistion Schedule: Award within 60 days after RFP close-out date. 9. Export controlled data available only to DoD contractors that are potential offerors. Foreign participation is not permitted. 10. TDP. Offers shall be IAW the current TDP. The qualified manufacturer shall build and deliver on-time serviceable quality A-10 parts to the USAF. To meet the requirement the qualified manufacturer is responsible for reviewing the entire TDP before bidding on the requirement and identifying any discrepancies in the TDP preventing the manufacturer from meeting the inspection clause(s) of delivering serviceable assets in reasonable time to resolve the discrepancies and bid on-time. 11. TDP Access: The PCO is the point of contact for TDP access. The current TDP is attached to SECTION J of the RFP/Contract. The zip files must be downloaded from SAM.gov. To download the zip files from SAM.gov search for the RFP# FA8212-22-R-0025 and e-mail the PCO to approve access request to the controlled files. The request must be for official business only. DoD contractors must provide their CAGE code and if they are interested in bidding on the requirement before the PCO can approve the access request. The pre-award PCO is leslie.evans.1@us.af.mil and for post-award, the assigned PCO. Data Package (Bid Sets) NSN PR IMAGE COUNT LOCATION 1560-01-591-6923FJ 1560-01-592-2577FJ FD2020-22-00584 756 SAM.GOV 11. Acquisition Subject to Qualification Requirement. Replenishment parts must be acquired so as to ensure the safe, dependable, and effective operation of the military aircraft, the A-10s, and thus the spares are subject to qualification requirements per FAR 17.7, Acquisition of Replenishment Parts and FAR 9.2, Qualification Requirements. All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency; however, only a qualified responsible manufacturer may receive the award per FAR 9.2. Qualification Requirements, and FAR 9.1, Responsible Prospective Contractor. New sources may submit a Source Approval Request (SAR) per the attached Source Qualification Statement Spares (SQSS). If the offeror is not a qualified manufacturer at the time of bidding and has not submitted a SAR yet, the bid must include a complete SAR package in order to be accepted as a complete bid and be considered for award. Please note, the Govt intends to award as soon as possible, within 30 days after the RFP closed and the Govt has up to contract award to qualify new sources; however, contract award shall not be delayed to qualify new sources per FAR 9.202 (e). The Contracting Officer need not refer challenges to the qualification requirements to the Small Business Administration (SBA) per FAR 9.202(d).","url":"https://matchawards.com/dept_of_the_air_force/posts/116379410413529262","identifier":"FA8212-22-R-0025","category":"336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1560 - AIRFRAME STRUCTURAL COMPONENTS"}],"availabilityStarts":"2026-04-08","availabilityEnds":"2022-08-04","validThrough":"2022-08-04T23:59:59-04:00","areaServed":"UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/fd09a169e37d4b7d930dfac0cfd9f682/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

