<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/115703614356453184" -->

---
title: Remanufacture of Flap Drive Angle Gearbox Assembly | Closed - MatchAwards
description: Remanufacture of Flap Drive Angle Gearbox Assembly. United States Department of the Air Force. Solicitation FA8118-26-R-0003. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Total small business set-aside. Deadline 2025-12-15. A 5-YEAR INDEFINITE DELIVERY INDEFINITE...
canonical: https://matchawards.com/dept_of_the_air_force/posts/115703614356453184
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Remanufacture of Flap Drive Angle Gearbox Assembly | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/115703614356453184
og:description: Remanufacture of Flap Drive Angle Gearbox Assembly. United States Department of the Air Force. Solicitation FA8118-26-R-0003. NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing. Total small business set-aside. Deadline 2025-12-15. A 5-YEAR INDEFINITE DELIVERY INDEFINITE...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Remanufacture of Flap Drive Angle Gearbox Assembly

Status

Closed, the response deadline passed on Dec 15, 2025

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

TINKER AFB, USA

Notice type

Solicitation

Solicitation number

FA8118-26-R-0003

NAICS

[336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing](/groups/560)

PSC

1680 - MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-12-11

Deadline

2025-12-15

## Description

A 5-YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MIN-MAX TYPE CONTRACT IS CONTEMPLATED.  
NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not  
required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined  
that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in  
accordance with FAR 15.403-1(b)(1).  
52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984)  
Funds are not presently available for this contract. The Government’s obligation under this contract is contingent  
upon the availability of appropriated funds from which payment for contract purposes can be made. No legal  
liability on the part of the Government for any payment may arise until funds are made available to the  
Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in  
writing by the Contracting Officer. (End of clause)  
(a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively.  
(b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e.material handling, profit, direct or indirect costs).  
(c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must  
submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker  
SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff  
Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009\. Email: afsc.sb.workflow@us.af.mil Website:  
https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. 429SCMS.SASPO.Workflow@us.af.mil  
For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/  
As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror  
with an opportunity to demonstrate its ability to meet the standards specified for qualification.  
(d) In order to receive any technical data related to this acquisition, offerors must send an email request to Cliff Morgan at  
clifford.morgan.8@us.af.mil or Amy Gil at amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall be on company letterhead and include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345\. The form, including instructions for completing the form, is Page 4 of 56 FA8118-26-R-0003 available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not  
responsible for incomplete, misdirected, or untimely requests.\*\* In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link.  
(e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c))  
Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or  
“maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.  
(f) END ITEMS BEYOND REMANUFACTURE  
"Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable  
requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond  
the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor  
prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s).  
(g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the  
administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of  
the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable,  
the contractor shall dispose of the unit in the manner directed by the ACO. Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award.  
(h) Condemned units shall not be counted as production.  
(i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to  
meet the Government’s required delivery schedule.  
(j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time.  
The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.  
(k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003\. Contractor determined  
location and method of marking is acceptable.  
(l) All quantities specified herein represent the total contract quantities for all five years combined. The ordering period for  
each line item shall extend from the contractual effective data to five years thereafter or until the maximum quantity for each  
line item is reached, whichever comes first. The minimum and maximum quantities for each line item are as follows:  
Line Item 0001 NSN: 1680-00-335-6816 Minimum Quantity: 40each Maximum Quantity: 350 each  
Line Item 0002 Over & Above  
Line Item 0003 Data  
(m) This Solicitation contemplates award of a five-year Indefinite Delivery Indefinite Quantity (IDIQ) Type Contract. Reference  
Clauses 52.216-19 – Delivery-Order Limitations, 52.216-22 – Indefinite Quantity and 252.216-7006 – Ordering.  
(n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the  
listed item(s).  
(o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must  
include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the  
Page 5 of 56 FA8118-26-R-0003 DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250.  
(p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk  
assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the  
summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is  
specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or  
delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement  
National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision  
DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan  
with their proposal to become compliant.

<!-- mobian-agent-ad sponsored="true" id="208007cb-fa81-458f-8efa-70fc8e85dc55" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0ee1a0ed1de04eaeb80caa6c34b0f279/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/23e4b63ae9484154b4ebc725fc874e4e/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2459e1b435d44e7bb099c34eca5372de/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2a3cd221540d4654bebc428ee67132fe/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5b8a5978821a4f8389264b3d31105932/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/76d5906475564e8bbb7d1e64a8eac673/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/88a18a2277a4465fabcd49e4a265f4d3/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/89dde97a1bd1485db7a9584a03a5b063/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8d17f4699fe845b3a0d92b36d14bcb15/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9a043829c4e74a9282648aeed7f15db3/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b17d26aec5ab47a5a3cec21f0b9a1bdb/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cf55d09cd51442cbb87f62c700cee7ef/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ee7a038e0e114cda81dd8b4523b1953d/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f9f158c9c87c4bd9bcccb19dd7156569/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fc66e162d7c140358068f10aa8bcaece/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ff6558fe0d9a427f9467f68225202031/download)

## Contacts

* Nonika Allen
* Amy Gil

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/5093999d2bbc49b89743961dbdd16f63/view)

[More from United States Department of the Air Force posted in December 2025](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2025-12)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Remanufacture of Flap Drive Angle Gearbox Assembly","description":"A 5-YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MIN-MAX TYPE CONTRACT IS CONTEMPLATED. NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1). 52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause) (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O\u0026A request. No additional cost will be allowed (i.e.material handling, profit, direct or indirect costs). (c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: afsc.sb.workflow@us.af.mil Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they “Request a Drop-Off” to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. 429SCMS.SASPO.Workflow@us.af.mil For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/ As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. (d) In order to receive any technical data related to this acquisition, offerors must send an email request to Cliff Morgan at clifford.morgan.8@us.af.mil or Amy Gil at amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall be on company letterhead and include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is Page 4 of 56 FA8118-26-R-0003 available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.** In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link. (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE \"Reparable End Items\" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items...","url":"https://matchawards.com/dept_of_the_air_force/posts/115703614356453184","identifier":"FA8118-26-R-0003","category":"336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"1680 - MISCELLANEOUS AIRCRAFT ACCESSORIES AND COMPONENTS"}],"availabilityStarts":"2025-12-11","availabilityEnds":"2025-12-15","validThrough":"2025-12-15T23:59:59-05:00","sameAs":"https://sam.gov/workspace/contract/opp/5093999d2bbc49b89743961dbdd16f63/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

