NAF Soundside Club AV Install
- Status
- Closed, the response deadline passed on Oct 15, 2025
- Agency
- United States Department of the Air Force
- Office
- HURLBURT FIELD, USA
- Notice type
- Solicitation
- Solicitation number
- FA441725QHURL
- NAICS
- 334310 - Audio and Video Equipment Manufacturing
- PSC
- T016 - PHOTO/MAP/PRINT/PUBLICATION- AUDIO/VISUAL
- Category
- Business Administration Services (2.1)
- Posted
- 2025-10-06
- Deadline
- 2025-10-15
- Place of performance
- Hurlburt Field, Florida 32544, UNITED STATES
Description
The Soundside Club on Hurlburt Field, FL has a new requirement to completely replace all audio/visual (AV) components. The current system has met its life expectancy and no longer provides quality services. This is a non-apropriated funds (NAF) requirement.
Performance Requirements are:
· Remove and dispose of all audio/visual (AV) equipment.
· a-b-c ballrooms need to have the capability to be individual or combined
· Conference room can be overflow for main ballroom area with its own zone.
· Address wireless field boxes in place now for audio and replace with new digital display and touch controls for each room as needed for each ballroom to operate independently and combined. Equip each zone with 2 wireless microphones each and a wireless receiver.
· Replace all speakers in ballrooms, hallways, bathroom, and outdoors.
· Run all new appropriate CAT 6 and HDMI ethernet audio and video cables as necessary.
· Replace video components to attain at least 1920x1080 with four new laser projectors and new 130” retractable screens.
· Replace mixer, amps, displays, switches, etc. in the A/V Room. Existing rack may be used.
· Replace existing outlet / port in each ballroom with (2) HDMI, (1) USB C, and any other recommended audiovisual ports compatible with new devices and laptops.
Contractor must coordinate with Club Manager prior to any work being completed to not interfere with any contracted events.
Civil Engineering needs to approve project, power requirements, Fire and Safety review for project.
Note: the project is replacing existing equipment, so the need for additional power may not be necessary.
See the Attachment 1 - SOW for all requirement specific details.
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
More from United States Department of the Air Force posted in September 2025