Repair Asphalt Runway 14-32 Phase 4
- Status
- Closed, the response deadline passed on Jun 6, 2025
- Agency
- United States Department of the Air Force
- Office
- DOVER AFB, USA
- Notice type
- Sources Sought
- Solicitation number
- FA4497-26-SOURCES-SOUGHT-ASPHALT-RUNWAY-PHASE-4
- NAICS
- 237310 - Highway, Street, and Bridge Construction
- PSC
- Z2BD - REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2025-05-22
- Deadline
- 2025-06-06
- Place of performance
- Dover AFB, Delaware 19902, UNITED STATES
Description
This is a sources sought, not to be misconstrued for a solicitation.
436th Contracting Squadron is performing market research to identify potential contractors capable of effectively completing the work described below:
The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14-32.
1. Rotor mill an area 150 LF x 2100 LF to a depth of 2 inches.
2. Repave 150 LF x 2100 LF with 2 inches PG 76-22 binder FAA Mix in accordance with UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving).
3. Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas.
4. Restripe all demolished stripes/markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows.
Contacts
- Anna George
- 2d Lt Jayden Thiergood
Email and phone are in the source notice.
More from United States Department of the Air Force posted in May 2025