ClickCease Proliferated Warfighter Space Architecture Tranche 3 Tracking… | Closed - MatchAwards

Proliferated Warfighter Space Architecture Tranche 3 Tracking Layer (T3TRK)

Status
Closed, the response deadline passed on May 22, 2025
Agency
United States Department of the Air Force
Office
CHANTILLY, USA
Notice type
Solicitation
Solicitation number
SDA-PS-25-02
NAICS
541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC13 - NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; EXPERIMENTAL DEVELOPMENT
Posted
2025-04-29
Deadline
2025-05-22

Description

The Space Development Agency (SDA) is issuing this Other Transaction Authority (OTA) solicitation for a prototyping effort of the Proliferated Warfighter Space Architecture (PWSA) Tranche 3 (T3) Tracking Layer (T3TRK). T3TRK prototyping effort will accelerate the capability to provide global, persistent indications, detection, warning, tracking, and identification of conventional and advanced missile threats, including hypersonic missile systems. The T3 Tracking Layer will also demonstrate a missile defense capability. The T3 Tracking Layer scope includes the procurement and deployment of an anticipated minimum of 54 space vehicles (SVs) with infrared (IR) sensors, in six (6) orbital planes. Additional prototyping of satellites and sensor payloads may also occur under this OT in order to inform requirements and constellation design. The fully deployed Tracking Layer is estimated to include more than 100 SVs in Low Earth Orbit (LEO) across multiple planes.  See the attachments for additional details and instructions on how to request Controlled Unclassified Information (CUI) and classified reference documents associated with the solicitation. 

Please note - the Government will not be posting a Comment Resolution Matrix (CRM) for this solicitation.    

Attachments

Source notice

More from United States Department of the Air Force posted in April 2025

More lists