ClickCease Repair Interior Ceiling Building 224 | Closed - MatchAwards

Repair Interior Ceiling Building 224

Status
Closed, the response deadline passed on Apr 2, 2025
Agency
United States Department of the Air Force
Office
APO, USA
Notice type
Presolicitation
Solicitation number
FA5270MB224
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z2AZ - REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Category
Facility Related Services (4.4)
Set-aside
Local Area Set-Aside (FAR 26.2)
Posted
2025-03-18
Deadline
2025-04-02
Place of performance
Kadena Air Base Okinawa, 96368, JAPAN

Description

This project shall consist of but not limited to providing all field investigations, surveys,
design, plant, labor, materials, equipment, supplies, transportation, third-party services, and 
incidental related work to design and execute construction work defined in this Statement of Work 
and the attached documents. The work includes all necessary finishing work to provide the 
Government with a final product that is fully functional and leaves no areas of the facility that 
appear incomplete or unfinished.

This project shall accomplish a design-build repair the true ceiling of B224. Work includes 
full Asbestos-Containing Material (ACM) abatement of the ceiling paint and repair spalls and 
cracks. Include any site preparation work such as temporary removal of the suspended ceiling, 
lighting system, alarm, electrical wiring and conduit, and ceiling hung air-condition unit. 
Sustainable principles, to include life cycle cost- effective practices, will be integrated into 
the design, development, and construction of the project in accordance with UFC 1-200-02, High 
Performance and Sustainable Building Requirements.

The scope of work may require the sampling, removal/abatement, and disposal of ACM, LBP, or 
other hazardous building materials.

The Contractor shall determine the best technical design solution in conformance with current 
regulations. The design and construction work shall comply with US federal, Department of Defense, 
Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not 
specifically stated elsewhere in this project statement of work to provide a complete and usable 
facility upon completion. The detailed Scope of Work is described here-in below and the attached supporting documents.

Construction activities may commence after the approval of the Environmental Protection Plan 
(EPP) and AF Form 130 (Work Clearance). The Contractor shall coordinate on-site safety requirements 
through 718th Civil Engineer Squadron (718 CES)
 

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in March 2025

More lists