REPAIR RUNWAY 32 PAVEMENT PHASE 3
- Status
- Closed, the response deadline passed on Feb 14, 2025
- Agency
- United States Department of the Air Force
- Office
- DOVER AFB, USA
- Notice type
- Solicitation
- Solicitation number
- FA449725R0005
- NAICS
- 237310 - Highway, Street, and Bridge Construction
- PSC
- Z2BD - REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
- Category
- Facility Related Services (4.4)
- Posted
- 2025-02-11
- Deadline
- 2025-02-14
- Place of performance
- Dover AFB, Delaware 19902, UNITED STATES
Description
The project consists of providing all labor, materials, and equipment necessary to repair a portion of Runway 14/32 pavement (see location below). The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14/32. A. Rotor mill an area 150 LF x 2100 LF to a depth of 2 inches. B. Repave 150 LF x 2100 LF with 2 inches PG 76-22 binder FAA Mix in accordance with UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving). C. Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas D. Restripe all demolished stripes/markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows.Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
More from United States Department of the Air Force posted in December 2024