ClickCease C-5 Visor Door Actuator Overhaul | Closed - MatchAwards

C-5 Visor Door Actuator Overhaul

Status
Closed, the response deadline passed on Apr 21, 2025
Agency
United States Department of the Air Force
Office
ROBINS AFB, USA
Notice type
Presolicitation
Solicitation number
FA8538-25-R-0003
NAICS
811210 - Electronic and Precision Equipment Repair and Maintenance
PSC
J016 - MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES
Posted
2025-03-26
Deadline
2025-04-21
Place of performance
Warner Robins, Georgia 31098, UNITED STATES

Description

C-5 Visor Door Actuator Overhaul The Air Force has a requirement for overhaul of the C-5 Visor Door Actuator (VDA) for use by the United States Air Force (USAF) in support of the C-5 Galaxy cargo aircraft. Notice ID: FA8538-25-R-0003 This Synopsis for the requirement is being issued by AFSC/PZAAB (FA8538) NSN: 1680-00-402-9812 Noun: ACTUATOR,MECHANICAL Synopsis is for issuance of a Firm-Fixed Price/Indefinite Delivery Indefinite Quantity (IDIQ) type Request for Proposal (RFP), FA8538-25-R-0003, for depot-level overhaul/remanufacture services applicable to the C-5 VDA for use by the USAF in support of the C-5 Galaxy cargo aircraft. C-5M Visor Door Actuator Overhaul of this complex design requires strict control of processes to ensure adherence to very close tolerances. Due to the unique application and Critical Safety Item designation of the visor door actuator, special equipment is required to test the final repaired item and ensure its flight worthiness. Brake, load, and functional testing are required to ensure the visor actuator will not fail in use. The FFP/IDIQ contract is planned for 5-years in length utilizing Delivery Protection Program (DPP) Competitive procedures: The first two (2) years for both the currently approved and qualified source completing the Mission Essential Quantity (MEQ) overhaul repairs, and for pre-production from a potential source. The remaining three (3) years to the proven qualified source. The projected period of performance for this requirement is anticipated as follows: Basic (2-years) to the proven source: Basic 1 - MEQ Min/Max Qty: 1 / 12 Basic Option Year 2 - MEQ Min/Max Qty: 1 / 12 Pre-Production to the unproven source: 1/2 Option 1 (1 year) - Production Option Min/Max Qty: 1 / 12 Option 2 (1 year) - Production Option Min/Max Qty: 1 / 12 Option 3 (1 year) - Production Option Min/Max Qty: 1 / 12 This acquisition will be Full and Open Competition utilizing Delivery Protection Program (DPP) Competitive procedures. The proven source will be awarded an IDIQ type contract for the first two (2) years to complete MEQ Quantities, with a potential of three (3) Option Years. If an unproven source is the lowest offeror, the Government will also award an IDIQ type contract with Pre-Production and Production Options. Period of Performance is anticipated to begin July 2025 for a period of 5 years (FY25 - FY30).

Attachments

Source notice

More from United States Department of the Air Force posted in December 2024

More lists