<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/113089085188673184" -->

---
title: Hot Aisle Containment with Server Rack | Closed - MatchAwards
description: Hot Aisle Containment with Server Rack. United States Department of the Air Force. Solicitation DCG. NAICS 334111 - Electronic Computer Manufacturing. Total small business set-aside. Deadline 2024-09-20. All questions are due by 17 Sept 2024, 1200 MT. At this time, there is no site visit...
canonical: https://matchawards.com/dept_of_the_air_force/posts/113089085188673184
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Hot Aisle Containment with Server Rack | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/113089085188673184
og:description: Hot Aisle Containment with Server Rack. United States Department of the Air Force. Solicitation DCG. NAICS 334111 - Electronic Computer Manufacturing. Total small business set-aside. Deadline 2024-09-20. All questions are due by 17 Sept 2024, 1200 MT. At this time, there is no site visit...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Hot Aisle Containment with Server Rack

Status

Closed, the response deadline passed on Sep 20, 2024

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

SCHRIEVER SFB, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

DCG

NAICS

[334111 - Electronic Computer Manufacturing](/groups/501)

PSC

7K20 - IT AND TELECOM - STORAGE PRODUCTS (HARDWARE AND PERPETUAL LICENSE SOFTWARE)

Category

[IT Products (1.1)](/categories/information-technology/it-products)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2024-09-05

Deadline

2024-09-20

Place of performance

Colorado Springs, Colorado 80912, UNITED STATES

## Description

All questions are due by 17 Sept 2024, 1200 MT. At this time, there is no site visit scheduled. The Government will establish a date if needed. 

<!-- mobian-agent-ad sponsored="true" id="70e5fea3-790c-4f5b-9c03-101808ab0880" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/information-technology/it-products?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


Purchase, deliver, and install sixteen (16) seismic compliant IT Cabinet Racks in two hot aisle containment (HAC) configurations.  
Each HAC will have two rows of four cabinets for a total of eight cabinets per HAC.  
Each rack shall be fitted with a brush grommet rail kit, a copper bus bar, a vertical cable bar kit, blanking/filler panels, remote  
power distribution units (rPDU), rPDU bracket sets for vertical mounting in rear cabinet corner, ganging kits for the cabinets,  
and temperature sensors.  
• External Temperature Sensors - One (1) temperature sensors per cabinet mounted externally on the front of the cabinet to  
measure incoming air and connected to the rPDU.  
• Internal Temperature Sensors - One (1) temperature sensor per cabinet mounted on the rear of the cabinet (the hot aisle  
side) and connected to the rPDU.  
• Grounding the Racks - To protect personnel, equipment, and to minimize electrostatic discharge, each rack will be properly  
grounded and bonded IAW Schriever AFB Instruction 17-201 and applicable military and commercial standards.  
Containment Doors - Hot aisle(s) shall have containment doors mounted on each end of the hot aisle  
Biometric Door Locks installed on the front and rear of each cabinet. These locks shall be networked to the main control server.  
LED Strips - External rear mounted LED strips shall be placed on every other rack inside the hot aisle and connected to a  
normally open (off) motion sensor for lighting inside the hot aisle containment unit. Each LED strip shall be offset from the rack  
across from it.  
Thermal Curtains - Thermal breakaway curtains shall be installed from top of the cabinets to the ceiling of the mod—  
approximately 30 inches. The curtains will break away in the event of fire and will not impede operation of any overhead  
sprinklers. They shall avoid contact with the ground as to not become a tripping hazard. They shall comply with the UFC and  
NFPA 75\. (Include Fire Marshal direction w/ respect to sprinkler heads etc.)  
Main Control Server – A server with workstation, network time protocol server (Inter-Range Instrumentation Group \[IRIG-B\]),  
and network switch (this server will also be used to control/monitor the biometric locks).  
Floor Tiles - Install new floor tiles directly inside, under, and surrounding the two new HACs (excluding where floor vents shall  
be placed). See Attachment A and Attachment C.  
Floor Vents –Install twelve 12 manually adjustable-flow floor vents, 3 facing each cold side of each HAC. These vents shall be  
adjustable in vector as well as air flow output. Vents can be set and adjusted based on unique rack load.  
Temperature, Airflow, and Power Measurements  
• Pre-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently  
existing vents within Mod 3 (\~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3.  
Record these on a room schematic where measurements were taken from and provide these to the program and project  
manager. With respective time stamps to correlate with power load at that time and number of people present within the mod  
at that time.  
• Post-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently  
existing vents within Mod 3 (\~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3.  
Record these on a room schematic where measurements were taken from and provide these to the program and project  
manager.  
These requirements are not military unique. Hot aisle containment configurations are common throughout industry, especially in  
medium to large data centers. The hot aisle /cold aisle data center layout is a proven way to save energy in a data center. Hot  
aisle/cold aisle layout involves lining up server racks in alternating rows with cold air intakes – the fronts of servers – facing  
each other (the “cold aisle”) and hot air exhausts – the backs of servers – facing each other (the “hot aisle”). Raised floors are  
commonly used in data centers to provide an efficient way to deliver cold air from the computer room air conditioner (CRAC) unit to server racks. \[Note: SSFB Building 400 Mods have raised floors.\] CRAC units direct conditioned air into the sub-flooring.  
This pressurized cool air rises through perforations in floor tiles into cold aisle, where it is subsequently drawn into the front of  
servers to cool them. Hot exhaust air rises from server racks in the hot aisle and returns along the ceiling back to the to the  
CRAC unit intakes.

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/003e581350644c84867f46f22d3af15f/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/21b866953c00495585bb334b482e9be9/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/21df023cd37e4a45ab3fe47b2c7b4ab3/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4ecf15a88aca4106ad12c5cb219d1f09/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5a86ac3492ef421f95630b11a590e790/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/73a5b75f2ce54f7b883fcebe42033692/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/aacb2eea8418412483fb28398e22e1c7/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d82c2edb95294016b95683d09d3c7f84/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ee90adf935af4dc986ec2f69e07a71e3/download)

[Source notice](https://sam.gov/opp/7a081c4bab234fec8def9f9f81a0f585/view)

[More from United States Department of the Air Force posted in September 2024](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2024-09)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Hot Aisle Containment with Server Rack","description":"All questions are due by 17 Sept 2024, 1200 MT. At this time, there is no site visit scheduled. The Government will establish a date if needed. Purchase, deliver, and install sixteen (16) seismic compliant IT Cabinet Racks in two hot aisle containment (HAC) configurations. Each HAC will have two rows of four cabinets for a total of eight cabinets per HAC. Each rack shall be fitted with a brush grommet rail kit, a copper bus bar, a vertical cable bar kit, blanking/filler panels, remote power distribution units (rPDU), rPDU bracket sets for vertical mounting in rear cabinet corner, ganging kits for the cabinets, and temperature sensors. • External Temperature Sensors - One (1) temperature sensors per cabinet mounted externally on the front of the cabinet to measure incoming air and connected to the rPDU. • Internal Temperature Sensors - One (1) temperature sensor per cabinet mounted on the rear of the cabinet (the hot aisle side) and connected to the rPDU. • Grounding the Racks - To protect personnel, equipment, and to minimize electrostatic discharge, each rack will be properly grounded and bonded IAW Schriever AFB Instruction 17-201 and applicable military and commercial standards. Containment Doors - Hot aisle(s) shall have containment doors mounted on each end of the hot aisle Biometric Door Locks installed on the front and rear of each cabinet. These locks shall be networked to the main control server. LED Strips - External rear mounted LED strips shall be placed on every other rack inside the hot aisle and connected to a normally open (off) motion sensor for lighting inside the hot aisle containment unit. Each LED strip shall be offset from the rack across from it. Thermal Curtains - Thermal breakaway curtains shall be installed from top of the cabinets to the ceiling of the mod— approximately 30 inches. The curtains will break away in the event of fire and will not impede operation of any overhead sprinklers. They shall avoid contact with the ground as to not become a tripping hazard. They shall comply with the UFC and NFPA 75. (Include Fire Marshal direction w/ respect to sprinkler heads etc.) Main Control Server – A server with workstation, network time protocol server (Inter-Range Instrumentation Group [IRIG-B]), and network switch (this server will also be used to control/monitor the biometric locks). Floor Tiles - Install new floor tiles directly inside, under, and surrounding the two new HACs (excluding where floor vents shall be placed). See Attachment A and Attachment C. Floor Vents –Install twelve 12 manually adjustable-flow floor vents, 3 facing each cold side of each HAC. These vents shall be adjustable in vector as well as air flow output. Vents can be set and adjusted based on unique rack load. Temperature, Airflow, and Power Measurements • Pre-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently existing vents within Mod 3 (~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3. Record these on a room schematic where measurements were taken from and provide these to the program and project manager. With respective time stamps to correlate with power load at that time and number of people present within the mod at that time. • Post-installation measurements - All test equipment shall be calibrated. Measure airflow and temperature from all currently existing vents within Mod 3 (~25), take at least 12 dispersed temperature measurements at a height of 4 feet within Mod 3. Record these on a room schematic where measurements were taken from and provide these to the program and project manager. These requirements are not military unique. Hot aisle containment configurations are common throughout industry, especially in medium to large data centers. The hot aisle /cold aisle data center layout is a proven way to save energy in a data center. Hot aisle/cold aisle layout involves lining up server racks in alternating rows with cold air intakes – the fronts of servers – facing each other (the “cold aisle”) and hot air exhausts – the backs of servers – facing each other (the “hot aisle”). Raised floors are commonly used in data centers to provide an efficient way to deliver cold air from the computer room air conditioner (CRAC) unit to server racks. [Note: SSFB Building 400 Mods have raised floors.] CRAC units direct conditioned air into the sub-flooring. This pressurized cool air rises through perforations in floor tiles into cold aisle, where it is subsequently drawn into the front of servers to cool them. Hot exhaust air rises from server racks in the hot aisle and returns along the ceiling back to the to the CRAC unit intakes.","url":"https://matchawards.com/dept_of_the_air_force/posts/113089085188673184","identifier":"DCG","category":"334111 - Electronic Computer Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"7K20 - IT AND TELECOM - STORAGE PRODUCTS (HARDWARE AND PERPETUAL LICENSE SOFTWARE)"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"1.1 IT Products","url":"https://matchawards.com/categories/information-technology/it-products"}],"availabilityStarts":"2024-09-05","availabilityEnds":"2024-09-20","validThrough":"2024-09-20T23:59:59-04:00","areaServed":"Colorado Springs, Colorado 80912, UNITED STATES","sameAs":"https://sam.gov/opp/7a081c4bab234fec8def9f9f81a0f585/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

