<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/112930652372225648" -->

---
title: Seymour Johnson AFB Aircraft Sunshade Canvas Replacement | Closed - MatchAwards
description: Seymour Johnson AFB Aircraft Sunshade Canvas Replacement. United States Department of the Air Force. Solicitation F3T2MX4183A002. NAICS 332311 - Prefabricated Metal Building and Component Manufacturing. Total small business set-aside. Deadline 2024-08-13. 1. SCOPE: The contractor shall furnish...
canonical: https://matchawards.com/dept_of_the_air_force/posts/112930652372225648
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Seymour Johnson AFB Aircraft Sunshade Canvas Replacement | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/112930652372225648
og:description: Seymour Johnson AFB Aircraft Sunshade Canvas Replacement. United States Department of the Air Force. Solicitation F3T2MX4183A002. NAICS 332311 - Prefabricated Metal Building and Component Manufacturing. Total small business set-aside. Deadline 2024-08-13. 1. SCOPE: The contractor shall furnish...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Seymour Johnson AFB Aircraft Sunshade Canvas Replacement

Status

Closed, the response deadline passed on Aug 13, 2024

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

SEYMOUR JOHNSON AFB, USA

Notice type

Sources Sought

Solicitation number

F3T2MX4183A002

NAICS

[332311 - Prefabricated Metal Building and Component Manufacturing](/groups/433)

PSC

J054 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING

Category

[Industrial Products Install / Maintenance / Repair (5.5)](/categories/industrial-products-and-services/industrial-products-install-maintenance-repair)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2024-08-08

Deadline

2024-08-13

Place of performance

Goldsboro, North Carolina 27531, UNITED STATES

## Description

**1\. SCOPE:** The contractor shall furnish all labor, tools, equipment and supplies necessary to remove and dispose of existing fabric canvas and tension bars, and install new fabric canvas and tension bars to 5 fabric sunshade shelters, India 14-18, on the Seymour Johnson AFB flightline.

<!-- mobian-agent-ad sponsored="true" id="6b8fbac9-97b7-45ef-bf1e-d539f8d5282c" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


The new fabric canvas and tension bars will conform to the following specifications:

* Each canopy is 70' Wide X 70' Long X 30'6" Center Height X 19' Side Wall (Total of 5 canopies)
* Minimum 24 OZ. Cover, Exterior Tudor Beige, Interior White, Flame Retardant PVC Coated Fabric
* Fabric will be made of continuous fabric panel that will cover the entire shelters length and width
* Fabric shall stop 11' above ground on side walls.
* Frame: Must fully meet NC State Code and all design load criteria for the 110mph wind load rating.
* Side Cables will have high visibility protection sleeves with reflective tape
* Anchors for asphalt (2 each) and concrete (30 each) foundation
* All Weld Joints Coated with 97% Zinc "Cold Cal" for Corrosion Protection
* Meets or exceeds Class "C" Rating on the Shelter for Wind Load @ 110 MPH
* Fabric Provides 100% Waterproofing
* 20-year warranty on the canopies

2\. **MATERIALS:** All tools and equipment necessary for the installation will be supplied by the contractor. All materials shall comply with Buy American Act and Berry Amendment requirements.

3\. **LOCATION:** This work is to be accomplished on Seymour Johnson Air Force Base, Goldsboro, NC.

4\. **WORKMANSHIP:** All workmanship will comply with standard trade practices. The contractor shall provide all qualified personnel, equipment, and services required to dispose of existing canvas and install new canvas.

5\. **CLEANUP:** The contractor is responsible to return all work sites to the condition in which they were found.

6\. **WARRANTY:** The contractor will guarantee all workmanship for a period of one (1) year from completion of work. The contractor shall also provide a 20-year warranty on the canopy.

7\. **EXCLUSION/FREE ZONE:** The Government will create either a security “exclusion zone” or “free zone” around the perimeter of the construction site. The “exclusion zone” will consist of stanchions and elevated rope to identify the area of the ramp that is excluded from the secure “Red-lined” area of the ramp. Signs that read “Restricted Area” will be placed on the construction side of the “exclusion zone”. The “free zone” will consist of stanchions and elevated rope to identify the area of the ramp where work is authorized. The secure “red-lined” area is still in effect and contract employees will need to be escorted to and from the “free zone” when entering and departing. The “free zone” will have guards posted at each of the four corners.

8\. **SIZE:** The size of the shelters shall have a minimum of 65’ clear width and length inside by with an outside width not exceeding 70’, 30’6” center height and 19’ side wall height. The fabric roofing/siding shall extend down to approximately the same height as the existing shelters (11’ above the ground).

9\. **SITE INFORMATION:**

9.1 The contractor shall submit paperwork for base access to the Contracting Officer prior to work beginning.

10\. **SAFETY:** All safety requirements of the US Army Corps of Engineers Safety Manuel 385-1-1 latest edition will be strictly adhered to as related to all work covered under this contract.

11\. **PHASING:** The installation of the shelters will be accomplished in one (1) phase. All work shall be done in each phase and a separate “exclusion zone” or “free zone” will be required for installation on the airfield and established by the Government prior to commencement of work. Phases may or may not have a waiting period between them.

[Source notice](https://sam.gov/opp/f467799e716b4ffb82530f8bedb871ff/view)

[More from United States Department of the Air Force posted in August 2024](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2024-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Seymour Johnson AFB Aircraft Sunshade Canvas Replacement","description":"1. SCOPE: The contractor shall furnish all labor, tools, equipment and supplies necessary to remove and dispose of existing fabric canvas and tension bars, and install new fabric canvas and tension bars to 5 fabric sunshade shelters, India 14-18, on the Seymour Johnson AFB flightline. The new fabric canvas and tension bars will conform to the following specifications: Each canopy is 70' Wide X 70' Long X 30'6\" Center Height X 19' Side Wall (Total of 5 canopies) Minimum 24 OZ. Cover, Exterior Tudor Beige, Interior White, Flame Retardant PVC Coated Fabric Fabric will be made of continuous fabric panel that will cover the entire shelters length and width Fabric shall stop 11' above ground on side walls. Frame: Must fully meet NC State Code and all design load criteria for the 110mph wind load rating. Side Cables will have high visibility protection sleeves with reflective tape Anchors for asphalt (2 each) and concrete (30 each) foundation All Weld Joints Coated with 97% Zinc \"Cold Cal\" for Corrosion Protection Meets or exceeds Class \"C\" Rating on the Shelter for Wind Load @ 110 MPH Fabric Provides 100% Waterproofing 20-year warranty on the canopies 2. MATERIALS: All tools and equipment necessary for the installation will be supplied by the contractor. All materials shall comply with Buy American Act and Berry Amendment requirements. 3. LOCATION: This work is to be accomplished on Seymour Johnson Air Force Base, Goldsboro, NC. 4. WORKMANSHIP: All workmanship will comply with standard trade practices. The contractor shall provide all qualified personnel, equipment, and services required to dispose of existing canvas and install new canvas. 5. CLEANUP: The contractor is responsible to return all work sites to the condition in which they were found. 6. WARRANTY: The contractor will guarantee all workmanship for a period of one (1) year from completion of work. The contractor shall also provide a 20-year warranty on the canopy. 7. EXCLUSION/FREE ZONE: The Government will create either a security “exclusion zone” or “free zone” around the perimeter of the construction site. The “exclusion zone” will consist of stanchions and elevated rope to identify the area of the ramp that is excluded from the secure “Red-lined” area of the ramp. Signs that read “Restricted Area” will be placed on the construction side of the “exclusion zone”. The “free zone” will consist of stanchions and elevated rope to identify the area of the ramp where work is authorized. The secure “red-lined” area is still in effect and contract employees will need to be escorted to and from the “free zone” when entering and departing. The “free zone” will have guards posted at each of the four corners. 8. SIZE: The size of the shelters shall have a minimum of 65’ clear width and length inside by with an outside width not exceeding 70’, 30’6” center height and 19’ side wall height. The fabric roofing/siding shall extend down to approximately the same height as the existing shelters (11’ above the ground). 9. SITE INFORMATION: 9.1 The contractor shall submit paperwork for base access to the Contracting Officer prior to work beginning. 10. SAFETY: All safety requirements of the US Army Corps of Engineers Safety Manuel 385-1-1 latest edition will be strictly adhered to as related to all work covered under this contract. 11. PHASING: The installation of the shelters will be accomplished in one (1) phase. All work shall be done in each phase and a separate “exclusion zone” or “free zone” will be required for installation on the airfield and established by the Government prior to commencement of work. Phases may or may not have a waiting period between them.","url":"https://matchawards.com/dept_of_the_air_force/posts/112930652372225648","identifier":"F3T2MX4183A002","category":"332311 - Prefabricated Metal Building and Component Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J054 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.5 Industrial Products Install / Maintenance / Repair","url":"https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair"}],"availabilityStarts":"2024-08-08","availabilityEnds":"2024-08-13","validThrough":"2024-08-13T23:59:59-04:00","areaServed":"Goldsboro, North Carolina 27531, UNITED STATES","sameAs":"https://sam.gov/opp/f467799e716b4ffb82530f8bedb871ff/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

