<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/112862586562363571" -->

---
title: Exemption to Fair Opportunity to Renovate/Upgrade Restroom and… - MatchAwards
description: Exemption to Fair Opportunity to Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070. United States Department of the Air Force. Solicitation XUMU18-1087B. NAICS 236220 - Commercial and Institutional Building Construction. This action will result in a follow-on firm-fixed-price...
canonical: https://matchawards.com/dept_of_the_air_force/posts/112862586562363571
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Exemption to Fair Opportunity to Renovate/Upgrade Restroom and…
og:url: https://matchawards.com/dept_of_the_air_force/posts/112862586562363571
og:description: Exemption to Fair Opportunity to Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070. United States Department of the Air Force. Solicitation XUMU18-1087B. NAICS 236220 - Commercial and Institutional Building Construction. This action will result in a follow-on firm-fixed-price...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Exemption to Fair Opportunity to Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070

Status

Closed (no response deadline listed, posted Jul 27, 2024)

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

VANDENBERG SFB, USA

Notice type

Justification

Solicitation number

XUMU18-1087B

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2024-07-27

Deadline

Not stated

Place of performance

Lompoc, California 93437, UNITED STATES

## Description

This action will result in a follow-on firm-fixed-price task order to the incumbent, SJD&B, Inc., under Contract FA461020D0003, Task Order FA461024F0146\. This task order will address project number/title XUMU18-1087B, Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070\. The necessary repairs stem from extensive water leakage from the roof and downspouts above the restroom areas, which has caused significant damage to the gypsum board, insulation, wallpaper, and carpeting. This unforeseen damage has also led to mold development, which requires mitigation.

<!-- mobian-agent-ad sponsored="true" id="56a1c405-4537-49e8-8b55-9be2748a759e" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


This project falls under the Simplified Acquisition of Base Engineering Requirements (SABER) Multiple-Award IDIQ contract. The SABER contract includes all management, supervision, labor, materials, equipment, and incidentals necessary for a broad range of maintenance, repair, and minor construction work on various real property facilities. This also includes design and engineering services incidental to construction. The SABER contract encompasses multiple trades, including but not limited to carpentry, plumbing, electrical, mechanical, painting, pipe fitting, sheet metal, welding, roofing, site work, site utilities, excavation, concrete, masonry, pavement repair, asbestos abatement, lead paint removal, security hardware installation, and demolition. This task order involves mitigating mold and moisture damage to wallpaper, drywall, insulation, and carpet in the restrooms and adjacent stairwell areas.

**Scope of Work / General Description of the Project:**

* Provide an approved mold mitigation plan.
* Remove water-damaged wallpaper from walls shown in the Attachment 1 sketch that were not included in the original contract SOW. Areas where drywall is not being removed and replaced shall have the surface sprayed with an approved mold fungicide per the mitigation plan.
* Remove and replace water-damaged drywall 4’0” above the finished floor elevation not included in the original contract.
* Remove and replace water-damaged insulation from walls.
* Spray the lower portion of all walls within the interior bathroom area with mold fungicide per the mitigation plan. All areas will be air-dried before installing new insulation or finishes.
* Patch, prepare, texture, and paint hallway walls not included in the original contract.
* wallpaper from the stairwell area. • Remove phone area shelving, which will not be reinstalled.
* Retain all stairwell area trim, patch, and paint after mold mitigation.
* Remove water-saturated carpeting in the stairwell from the 1st-floor level to the last step at the 2nd-floor landing.
* Spray all walls within the interior stairwell area with mold fungicide per the mitigation plan. All areas will be aired and dried out before installing new insulation or finishes.
* Patch, prepare, texture, and paint all walls within the interior stairwell footprint.
* Install new vinyl stair treads and risers.

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/51e7a52a5f314c5d9b1ab09b5d1278ed/download)

[Source notice](https://sam.gov/opp/98a7e7a1a65b4f81b9b4134389c034ae/view)

[More from United States Department of the Air Force posted in July 2024](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2024-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Exemption to Fair Opportunity to Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070","description":"This action will result in a follow-on firm-fixed-price task order to the incumbent, SJD\u0026B, Inc., under Contract FA461020D0003, Task Order FA461024F0146. This task order will address project number/title XUMU18-1087B, Renovate/Upgrade Restroom and Sewer Drainage Lines, Facility No. 11070. The necessary repairs stem from extensive water leakage from the roof and downspouts above the restroom areas, which has caused significant damage to the gypsum board, insulation, wallpaper, and carpeting. This unforeseen damage has also led to mold development, which requires mitigation. This project falls under the Simplified Acquisition of Base Engineering Requirements (SABER) Multiple-Award IDIQ contract. The SABER contract includes all management, supervision, labor, materials, equipment, and incidentals necessary for a broad range of maintenance, repair, and minor construction work on various real property facilities. This also includes design and engineering services incidental to construction. The SABER contract encompasses multiple trades, including but not limited to carpentry, plumbing, electrical, mechanical, painting, pipe fitting, sheet metal, welding, roofing, site work, site utilities, excavation, concrete, masonry, pavement repair, asbestos abatement, lead paint removal, security hardware installation, and demolition. This task order involves mitigating mold and moisture damage to wallpaper, drywall, insulation, and carpet in the restrooms and adjacent stairwell areas. Scope of Work / General Description of the Project: Provide an approved mold mitigation plan. Remove water-damaged wallpaper from walls shown in the Attachment 1 sketch that were not included in the original contract SOW. Areas where drywall is not being removed and replaced shall have the surface sprayed with an approved mold fungicide per the mitigation plan. Remove and replace water-damaged drywall 4’0” above the finished floor elevation not included in the original contract. Remove and replace water-damaged insulation from walls. Spray the lower portion of all walls within the interior bathroom area with mold fungicide per the mitigation plan. All areas will be air-dried before installing new insulation or finishes. Patch, prepare, texture, and paint hallway walls not included in the original contract. wallpaper from the stairwell area. • Remove phone area shelving, which will not be reinstalled. Retain all stairwell area trim, patch, and paint after mold mitigation. Remove water-saturated carpeting in the stairwell from the 1st-floor level to the last step at the 2nd-floor landing. Spray all walls within the interior stairwell area with mold fungicide per the mitigation plan. All areas will be aired and dried out before installing new insulation or finishes. Patch, prepare, texture, and paint all walls within the interior stairwell footprint. Install new vinyl stair treads and risers.","url":"https://matchawards.com/dept_of_the_air_force/posts/112862586562363571","identifier":"XUMU18-1087B","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2024-07-27","areaServed":"Lompoc, California 93437, UNITED STATES","sameAs":"https://sam.gov/opp/98a7e7a1a65b4f81b9b4134389c034ae/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```