ClickCease 21 CS Bldg 350 ISP - Phase I & II | Closed - MatchAwards

21 CS Bldg 350 ISP - Phase I & II

Status
Closed, the response deadline passed on Jul 30, 2024
Agency
United States Department of the Air Force
Office
PETERSON SFB, USA
Notice type
Solicitation
Solicitation number
FA251724Q0065
NAICS
238210 - Electrical Contractors and Other Wiring Installation Contractors
PSC
N061 - INSTALLATION OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-07-19
Deadline
2024-07-30
Place of performance
Colorado Springs, Colorado 80914, UNITED STATES

Description

The 21st Communications Squadron has a requirement for the Contractor to engineer, furnish, install, and test (EFI&T) an upgrade of existing premises wiring or ISP infrastructure to new Cat-6 cabling for the Zones #3 on 1st floor (CLIN1), Zones #4 on 2nd floor (CLIN 2), Zone #5 on 2nd floor (CLIN3) and Zone #6 on 2nd floor (CLIN4) of the building B350. The zone layout is shown in Appendix C, Figure C-1, B350 Zone Layout. The upgrade shall also include installation and termination of new 12-strand single-mode (SM) plenum-rated fiber backbone cable between the hub/main communications room (CR) of the Zone #1 on 1st floor and each CR of the Zone #3, Zone #4, Zone #5 and Zone #6. The Contractor shall be required to remove all the existing outdated and abandoned-in-place Cat-3/Cat-5 premise wiring in these Zones #3, Zone #4, Zone #5 and Zone #6, including defunct fiber backbone cabling.

All applicable information is within the attached PWS. 

Attachments

Source notice

More from United States Department of the Air Force posted in July 2024

More lists