ClickCease Prep and Paint Heritage Park Flagpole and Base | Closed - MatchAwards

Prep and Paint Heritage Park Flagpole and Base

Status
Closed, the response deadline passed on Jul 17, 2024
Agency
United States Department of the Air Force
Office
LITTLE ROCK AFB, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
FA4460_PAINT_HERITAGE_PARK-Prep_and_Paint_Heritage_Park_Flagpole_and_Base
NAICS
238320 - Painting and Wall Covering Contractors
PSC
Z1QA - MAINTENANCE OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-07-12
Deadline
2024-07-17
Place of performance
Little Rock AFB, Arkansas 72099, UNITED STATES

Description

The contractor shall provide all qualified personnel, transportation, tools, equipment, materials and services required to prep and repaint Heritage Park flag pole and concrete base on Little Rock AFB, AR 72099.  The contractor shall accomplish all services below to meet the requirements of this Performance Work Statement (PWS).  Work shall be in compliance with all Federal, State and local regulations, codes and license requirements.  Work shall be accomplished within 30 days of material arrival.  Estimated delivery date of material is required to be sent to the Contracting Officer Representative (COR) within 15 days of contract award. Work shall be completed within 90 day of award.


The contractor shall perform full prep of the metal flag pole and the concrete base surrounding the pole.  Prep includes sanding or sand blasting the pole to eliminate any rough areas or chipped areas.  Concrete base area is 43 feet 6 inches in diameter, prep includes sealing or repairing any cracks in the concrete.  Primer any exposed bare metal or concrete or chipped area so paint will adhere.  Paint flag pole a gloss white and the truck at the top a golden color.  Protect any exposed cables or pulleys from being over sprayed. Concrete base paint is red on the center 8 feet in diameter, white star on the next section our and blue field on the outside of the circle.  Follow the existing layout pattern.  Paint and primer used must the type to adhere to the material being painted (metal or concrete).  SDS's will be provided on all materials used in the process prior to start of the work.  Clean up of the work area and disposal of all waste is the responsibility of the contractor.  Equipment rental such as lifts, or painting equipment and all material used in the project are the responsibility of the contractor to provide. (Appendix A)
Contractor shall furnish and replace the protective halyard stoppers to protect the paint on the pole from chipping during high winds. (Appendix B)

Site Visit: An organized site visit is scheduled for 12 July 2024 at 10:00 AM CST. This will be the only site visit conducted. Participants are to meet at the front gate visitor center of Little Rock AFB @ 9:30 AM to allow time to obtain escort passes and accountability. Vendors MUST RSVP to the POCs listed no later than 11 July 2024 at 4:00 PM CST on who will be attending the site visits. Little Rock AFB is not an open base and you must have a valid ID to access the base.