<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/112573827512810557" -->

---
title: Add Alter Paint Barn Decontamination Area for B406 | Closed - MatchAwards
description: Add Alter Paint Barn Decontamination Area for B406. United States Department of the Air Force. Solicitation EEPZ132020. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2024-06-24. (See SOW for further description) The Contractor must provide all plant, labor,...
canonical: https://matchawards.com/dept_of_the_air_force/posts/112573827512810557
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Add Alter Paint Barn Decontamination Area for B406 | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/112573827512810557
og:description: Add Alter Paint Barn Decontamination Area for B406. United States Department of the Air Force. Solicitation EEPZ132020. NAICS 236220 - Commercial and Institutional Building Construction. Deadline 2024-06-24. (See SOW for further description) The Contractor must provide all plant, labor,...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Add Alter Paint Barn Decontamination Area for B406

Status

Closed, the response deadline passed on Jun 24, 2024

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

COLUMBUS, USA

Notice type

Sources Sought

Solicitation number

EEPZ132020

NAICS

[236220 - Commercial and Institutional Building Construction](/groups/212)

PSC

Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Posted

2024-06-06

Deadline

2024-06-24

Place of performance

Columbus, Mississippi 39710, UNITED STATES

## Description

(See SOW for further description)

The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the addition and alteration to B406 Paint Barn. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Contruction must be accomplished in accordance with applicable UFC’s, ETL’s, (UFC’s and ETL’s may be found on-line at www.wbdg.org) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standardsifs/columbus-afb-ifs.

<!-- mobian-agent-ad sponsored="true" id="f2732ef7-d681-47e9-a247-66a1da59cfad" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


The government will furnish 100% design documents to the contractor, including drawings (PDF and CAD) and specifications. The contractor is expected to keep accurate redline drawings during construction and submit As-Builts upon project completion. Deliver two (2) hard copies of As-Builts (24”x36”) and one (1) digital copy via DoD SAFE containing each drawing sheet in both PDF and CAD file format directly to the CO, along with AF Form 3000\. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the As-Built submittal, the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, (1) CD-ROM containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals and CD-ROMs must be delivered to:

14th Contracting Squadron

495 Harpe Blvd, Suite 293

Columbus, MS 39710

The contractor is responsible for verification of existing dimensions, conditions, etc., and constructability based on provided design, and bids should reflect all costs necessary to complete construction. If the contractor encounters any unforeseen site conditions at any time, prior to or after contract award, the contractor must notify the CO immediately before proceeding with any work.

BACKGROUND

The facility is currently not configured to adequately allow for proper decontamination of personnel engaged in painting operations. Additionally, the facility is currently experiencing air flow issues in the paint process supply/exhaust system. The goal of this project is to configure the PPE locker/decontamination area to meet current requirements and to provide a solution for the issues with the supply/exhaust system in the paint bays.

SCOPE OF PROJECT

The Project involves a renovation and addition to B406 Paint hangar Administration and Decontamination area. A new fire alarm and mass notification system will be installed through the administration and decontamination area, while existing fire alarm system components will remain as-is in the paint bays. The project involves control work on the mechanical system in the paint bays.

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/141a3778adc04ee7be7585a4f4c6e66a/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5c4d273c8c0142ee915839a9aff5f9c4/download)

[Source notice](https://sam.gov/opp/fb01c08adeae4af0b4a6c80bead1e717/view)

[More from United States Department of the Air Force posted in June 2024](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2024-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Add Alter Paint Barn Decontamination Area for B406","description":"(See SOW for further description) The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the addition and alteration to B406 Paint Barn. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Contruction must be accomplished in accordance with applicable UFC’s, ETL’s, (UFC’s and ETL’s may be found on-line at www.wbdg.org) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standardsifs/columbus-afb-ifs. The government will furnish 100% design documents to the contractor, including drawings (PDF and CAD) and specifications. The contractor is expected to keep accurate redline drawings during construction and submit As-Builts upon project completion. Deliver two (2) hard copies of As-Builts (24”x36”) and one (1) digital copy via DoD SAFE containing each drawing sheet in both PDF and CAD file format directly to the CO, along with AF Form 3000. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the As-Built submittal, the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, (1) CD-ROM containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals and CD-ROMs must be delivered to: 14th Contracting Squadron 495 Harpe Blvd, Suite 293 Columbus, MS 39710 The contractor is responsible for verification of existing dimensions, conditions, etc., and constructability based on provided design, and bids should reflect all costs necessary to complete construction. If the contractor encounters any unforeseen site conditions at any time, prior to or after contract award, the contractor must notify the CO immediately before proceeding with any work. BACKGROUND The facility is currently not configured to adequately allow for proper decontamination of personnel engaged in painting operations. Additionally, the facility is currently experiencing air flow issues in the paint process supply/exhaust system. The goal of this project is to configure the PPE locker/decontamination area to meet current requirements and to provide a solution for the issues with the supply/exhaust system in the paint bays. SCOPE OF PROJECT The Project involves a renovation and addition to B406 Paint hangar Administration and Decontamination area. A new fire alarm and mass notification system will be installed through the administration and decontamination area, while existing fire alarm system components will remain as-is in the paint bays. The project involves control work on the mechanical system in the paint bays.","url":"https://matchawards.com/dept_of_the_air_force/posts/112573827512810557","identifier":"EEPZ132020","category":"236220 - Commercial and Institutional Building Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2024-06-06","availabilityEnds":"2024-06-24","validThrough":"2024-06-24T23:59:59-04:00","areaServed":"Columbus, Mississippi 39710, UNITED STATES","sameAs":"https://sam.gov/opp/fb01c08adeae4af0b4a6c80bead1e717/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

