C24-001 PM/RM 300T Stretch Press
- Status
- Closed, the response deadline passed on May 13, 2024
- Agency
- United States Department of the Air Force
- Office
- TINKER AFB, USA
- Notice type
- Presolicitation
- Solicitation number
- C24-001
- NAICS
- 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
- PSC
- J066 - MAINT/REPAIR/REBUILD OF EQUIPMENT- INSTRUMENTS AND LABORATORY EQUIPMENT
- Category
- Industrial Products Install / Maintenance / Repair (5.5)
- Posted
- 2024-05-03
- Deadline
- 2024-05-13
- Place of performance
- Carlton Lndg, Oklahoma 73145, UNITED STATES
Description
The Air Force intends to solicit the following a Preventative Maintenance and Remedial
Maintenance on 300T Stretch Press SN:202190-MPST-R-300.
The objective of PM is to protect the equipment capability
and investment by removing causes of failure, performing routine maintenance, and providing
adjustment to compensate for normal wear before failure occurs. The Contractor shall evaluate the
health of the test system and if an issue is found shall conduct further diagnostics and repair
activities, in accordance with sections 1.4 to 1.13 of this PWS, should the 300T Stretch Press not
be performing per OEM specification. The Contractor shall perform all PM’s IAW the OEM
specifications. The Contractor shall perform (2) two PMs per year on the item listed in Appendix
A. The Contractor shall provide a copy of the PM schedule to the GPOC (Government Point of
Contact) within ten (10) business days after contract award. The Contractor shall notify the GPOC
seven (7) business days prior to each scheduled PM visit. Upon completion of each PM visit the
Contractor shall conduct an operational check demonstrating to the SME that the work has been
completed and the machine is fully operational. Once the PM visit is completed the Contractor
shall provide a statement of any errors found during the PM. This statement shall be provided to
the GPOC and SME within ten (10) business days after operation check has been completed.
The PM shall include the following:
3 Day Onsite Visits with 6 months frequency
Preventative maintenance as defined in manuals supplied by customer.
Detailed equipment evaluation and machine operation assessment
Inspection of machine alignment, accuracy, and repeatability
Inspection of hydraulic, electrical and feedback systems
Spare parts inventory review
Visits shall include a detailed findings report based on SOW.
Component replacement recommendation list shall be provided as required.