Repair WHCA POL Tanks
- Status
- Closed, the response deadline passed on May 10, 2024
- Agency
- United States Department of the Air Force
- Office
- WASHINGTON, USA
- Notice type
- Solicitation
- Solicitation number
- FA706024R0003
- NAICS
- 237120 - Oil and Gas Pipeline and Related Structures Construction
- PSC
- Y1GC - CONSTRUCTION OF FUEL STORAGE BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-04-10
- Deadline
- 2024-05-10
- Place of performance
- Bolling AFB, District of Columbia 20032, UNITED STATES
Description
The project is for the Design and Construction of petroleum, oil, and lubricant (POL) tanks for White House Communications Agency (WHCA). It includes removal of underground Oil-Water Separators in buildings 399 and 408 for WHCA , removal of oil storage tanks, and installation of new Oil-Water Separators with integral oil storage and alarms to alert when oil should be removed. It also includes the removal of an underground 10,000-gallon diesel tank, hole filled with engineered fill, and platforms built with spill protection for above-ground 10,000 gallon diesel oil tanks. Lastly, it provides all connections to the tanks and two 250-gallon ready service interior oil tanks with spill prevention measures to include double-walled piping. NOTE: Complete project details shall be provided via the Statement of Work at the time a solicitation is posted.More from United States Department of the Air Force posted in April 2024