REPAIR RUNWAY 32 PAVEMENT PHASE 3
- Status
- Closed, the response deadline passed on Apr 3, 2024
- Agency
- United States Department of the Air Force
- Office
- DOVER AFB, USA
- Notice type
- Sources Sought
- Solicitation number
- FJXT220010
- NAICS
- 237310 - Highway, Street, and Bridge Construction
- PSC
- Z2BD - REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-03-19
- Deadline
- 2024-04-03
- Place of performance
- Dover AFB, Delaware 19902, UNITED STATES
Description
The project consists of providing all labor, materials, and equipment necessary to repair a portion of Runway 14/32 pavement (see location below).
The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14/32.
- Rotor mill an area 150 LF x 2100 LF to a depth of 2 inches.
- Repave 150 LF x 2100 LF with 2 inches PG 76-22 binder FAA Mix in accordance with
UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving).
- Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas
- Restripe all demolished stripes/markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows.
Performance: 60 days