ClickCease CONSTRUCT ALLIED SUPPORT FOR TEMPORARY DECONTAMINATION ROOM FOR… | Closed - MatchAwards

CONSTRUCT ALLIED SUPPORT FOR TEMPORARY DECONTAMINATION ROOM FOR PAINT HANGAR F192

Status
Closed, the response deadline passed on Mar 18, 2024
Agency
United States Department of the Air Force
Office
ENID, USA
Notice type
Solicitation
Solicitation number
FA302924R0006
NAICS
531120 - Lessors of Nonresidential Buildings (except Miniwarehouses)
PSC
Z2BZ - REPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-03-01
Deadline
2024-03-18

Description

Construct all allied support required for the placement of a temporary facility to serve as a decontamination room for the Vance Paint Hangar. Allied support includes utilities such as water, sewer, electrical,communications, and a vestibule to connect the temporary facility to the hangar. The site will require taps into the existing water, stormwater, wastewater, electrical, and communications lines as well as grading and siteleveling. Utilities to connect the temporary facilities to a potable water system and a supply of water to the fire sprinklers will be included in the project. Project includes demolition and restoration of pavement whererequired for utility connections. Per UFC 3-201-01, site drainage will be considered in the development of the site. Drainage will consist of grading the site for positive drainage, storm water detention and an undergroundinlet and piping system that connects to the existing base storm water system.Construct a temporary pad for the facility, which will consist predominantly of granular fill with a small amount of concrete where a sidewalk is necessary for egress. Construct stairs, ramps, and an enclosed vestibule requiredto connect the temporary facility with the existing hangar. The total square footage of the disturbed site - including utilities, exterior facility requirements, and the facility itself shall be less than 3,000 square feet, andwill be leased in relation to this project. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.This project also includes the lease of the temporary facility. (see Attachment L1.1_Section 00_41_00 Proposal Form for guidelines)All work will be accomplished in accordance with the plans and specifications, 300 days for performance, 330 total days.

Source notice

More from United States Department of the Air Force posted in March 2024

More lists