<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/108917371762051368" -->

---
title: AMS 2750 CLASS 2 COMPLIANT PLATING OVEN | Closed - MatchAwards
description: AMS 2750 CLASS 2 COMPLIANT PLATING OVEN. United States Department of the Air Force. Solicitation FA813222Q0044. NAICS 333994 - Industrial Process Furnace and Oven Manufacturing. Total small business set-aside. Deadline 2022-07-29. AWARD NOTIFICATION: FA813222P0046 NMH Tech, Inc. Alexandria, VA...
canonical: https://matchawards.com/dept_of_the_air_force/posts/108917371762051368
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: AMS 2750 CLASS 2 COMPLIANT PLATING OVEN | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/108917371762051368
og:description: AMS 2750 CLASS 2 COMPLIANT PLATING OVEN. United States Department of the Air Force. Solicitation FA813222Q0044. NAICS 333994 - Industrial Process Furnace and Oven Manufacturing. Total small business set-aside. Deadline 2022-07-29. AWARD NOTIFICATION: FA813222P0046 NMH Tech, Inc. Alexandria, VA...
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# AMS 2750 CLASS 2 COMPLIANT PLATING OVEN

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

TINKER AFB, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

FA813222Q0044

NAICS

[333994 - Industrial Process Furnace and Oven Manufacturing](/groups/496)

PSC

3424 - METAL HEAT TREATING AND NON-THERMAL TREATING EQUIPMENT

Category

[Machinery & Components (5.1)](/categories/industrial-products-and-services/machinery-and-components)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2022-08-31

Deadline

2022-07-29

Place of performance

Tinker AFB, 73145

## Description

AWARD NOTIFICATION: FA813222P0046 NMH Tech, Inc. Alexandria, VA Amount $145,980.00 Amended to add answers to contractor-submitted questions. Quotes due on Friday, July 29th by Noon CST. Physical Requirements:  Minimum Internal furnace size: 84 wide, 40 deep, 72 high  Maximum External footprint: \~100 wide, 72 deep, and 96 high  Rack layout: 3 removable racks, the lowest one elevated 6 from the bottom, preferably comprised of rollers rated to hold 100 lbs minimum, a middle one sitting at least 24 above that (30 total), and the top rack sitting at least 30 above that (60 total)  Rack weight rating: bottom rack rated for at least 1000 lb gross load, middle and top rack rated for at least 20 lbs per square foot  Loading doors: 2 doors, bi-parting that open independently of one another, any mullion present must be removable  Control cabinet must be accessible within allotted space for furnace, with at least 30 clearance for any electrical door to open Temperature requirements:  Temperature Range: 250-500F  AMS 2750F Class 2 (temperature uniformity +/- 10F, maximum SAT difference +/- 3F) Heating:  Zero-Fired SCR power control  Heat Input Capacity enough to heat a 1,000 lb steel load from 70° F to 475° F in 1 hour when loaded in to a preheated oven  Direct drive blowers for recirculation Controls:  Electrical: 480/3/60 power supply  Low voltage calibration connections to controller, over temp, and chart recorder  Low voltage calibration connections shall be located on the exterior of the control panel to allow calibration technicians to perform calibration without needing to access high voltage panels. Instrumentation:  AMS 2750F compliant type D instrumentation including chart recorder, temperature controller, and over-temperature controller/protection Thermocouples:  All thermocouples, thermocouple extension wire, and connectors shall meet all technical requirements as detailed by AMS 2750F section 3.1\.  Any and all connectors shall be of standard 2 pin connector type.  Control thermocouple: Any base metal type excluding type N; preference towards type K, J  1 control thermocouple required per oven control zone  1 resident SAT thermocouple required per control zone, permanently installed to comply with AMS 2750F, type N SAT probe required. Resident SAT thermocouple shall connect to jack panel connector on furnace control cabinet.  Nine temperature uniformity survey (TUS) ports shall be installed on the oven. The ports shall be positioned to allow TUS thermocouples to be placed in accordance with AMS 2750F Figure 1\. Testing:  Manufacturer shall perform System Accuracy Test (SAT) before shipment. SAT procedure and results shall comply with AMS 2750F Class 2 requirements and are subject to Tinker Technical POC approval before shipment.  Manufacturer shall perform Temperature Uniformity Survey (TUS) before shipment. TUS procedure and results shall comply with AMS 2750F Class 2 requirements and are subject to Tinker Technical POC approval before shipment. Installation/Training:  Turn-key installation shall be provided  Tinker AFB must be notified no less than one week prior to shipment for site prep  Operational training, maintenance training, and programming training shall be provided to Tinker AFB shop, maintenance, and engineering personnel after installation. Miscellaneous  1 year warranty  Manuals: 1 hardcopy, 1 digital Owners manual in English o Owners manual shall include operation instructions, maintenance instructions, and engineering drawings (heating elements, electrical wiring, mechanical design, etc.) with part numbers should replacement parts be needed.  Spare parts for 3 months service  Thermocouple calibration certificates for any and all thermocouples installed in the furnace, excluding extension wire. Amendment: Amendment1 (July 22, 2022): Amended to add answers to contractor-submitted questions. Quotes due on Friday, July 29th by Noon. 

<!-- mobian-agent-ad sponsored="true" id="07ef0b70-562c-49ed-9999-94b895cc0114" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/machinery-and-components?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Annita Wooten
* Marc J. Kreienbrink

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/5256a86bbea84aea9d6bda762b8eed5c/view)

[More from United States Department of the Air Force posted in August 2022](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2022-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"AMS 2750 CLASS 2 COMPLIANT PLATING OVEN","description":"AWARD NOTIFICATION: FA813222P0046 NMH Tech, Inc. Alexandria, VA Amount $145,980.00 Amended to add answers to contractor-submitted questions. Quotes due on Friday, July 29th by Noon CST. Physical Requirements:  Minimum Internal furnace size: 84 wide, 40 deep, 72 high  Maximum External footprint: ~100 wide, 72 deep, and 96 high  Rack layout: 3 removable racks, the lowest one elevated 6 from the bottom, preferably comprised of rollers rated to hold 100 lbs minimum, a middle one sitting at least 24 above that (30 total), and the top rack sitting at least 30 above that (60 total)  Rack weight rating: bottom rack rated for at least 1000 lb gross load, middle and top rack rated for at least 20 lbs per square foot  Loading doors: 2 doors, bi-parting that open independently of one another, any mullion present must be removable  Control cabinet must be accessible within allotted space for furnace, with at least 30 clearance for any electrical door to open Temperature requirements:  Temperature Range: 250-500F  AMS 2750F Class 2 (temperature uniformity +/- 10F, maximum SAT difference +/- 3F) Heating:  Zero-Fired SCR power control  Heat Input Capacity enough to heat a 1,000 lb steel load from 70° F to 475° F in 1 hour when loaded in to a preheated oven  Direct drive blowers for recirculation Controls:  Electrical: 480/3/60 power supply  Low voltage calibration connections to controller, over temp, and chart recorder  Low voltage calibration connections shall be located on the exterior of the control panel to allow calibration technicians to perform calibration without needing to access high voltage panels. Instrumentation:  AMS 2750F compliant type D instrumentation including chart recorder, temperature controller, and over-temperature controller/protection Thermocouples:  All thermocouples, thermocouple extension wire, and connectors shall meet all technical requirements as detailed by AMS 2750F section 3.1.  Any and all connectors shall be of standard 2 pin connector type.  Control thermocouple: Any base metal type excluding type N; preference towards type K, J  1 control thermocouple required per oven control zone  1 resident SAT thermocouple required per control zone, permanently installed to comply with AMS 2750F, type N SAT probe required. Resident SAT thermocouple shall connect to jack panel connector on furnace control cabinet.  Nine temperature uniformity survey (TUS) ports shall be installed on the oven. The ports shall be positioned to allow TUS thermocouples to be placed in accordance with AMS 2750F Figure 1. Testing:  Manufacturer shall perform System Accuracy Test (SAT) before shipment. SAT procedure and results shall comply with AMS 2750F Class 2 requirements and are subject to Tinker Technical POC approval before shipment.  Manufacturer shall perform Temperature Uniformity Survey (TUS) before shipment. TUS procedure and results shall comply with AMS 2750F Class 2 requirements and are subject to Tinker Technical POC approval before shipment. Installation/Training:  Turn-key installation shall be provided  Tinker AFB must be notified no less than one week prior to shipment for site prep  Operational training, maintenance training, and programming training shall be provided to Tinker AFB shop, maintenance, and engineering personnel after installation. Miscellaneous  1 year warranty  Manuals: 1 hardcopy, 1 digital Owners manual in English o Owners manual shall include operation instructions, maintenance instructions, and engineering drawings (heating elements, electrical wiring, mechanical design, etc.) with part numbers should replacement parts be needed.  Spare parts for 3 months service  Thermocouple calibration certificates for any and all thermocouples installed in the furnace, excluding extension wire. Amendment: Amendment1 (July 22, 2022): Amended to add answers to contractor-submitted questions. Quotes due on Friday, July 29th by Noon.","url":"https://matchawards.com/dept_of_the_air_force/posts/108917371762051368","identifier":"FA813222Q0044","category":"333994 - Industrial Process Furnace and Oven Manufacturing","additionalProperty":[{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"3424 - METAL HEAT TREATING AND NON-THERMAL TREATING EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.1 Machinery \u0026 Components","url":"https://matchawards.com/categories/industrial-products-and-services/machinery-and-components"}],"availabilityStarts":"2022-08-31","availabilityEnds":"2022-07-29","areaServed":"Tinker AFB, 73145","sameAs":"https://sam.gov/opp/5256a86bbea84aea9d6bda762b8eed5c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

