ClickCease Replace Hangar Doors Building 102 | Closed - MatchAwards

Replace Hangar Doors Building 102

Status
Closed (archived notice)
Agency
United States Department of the Air Force
Office
EGLIN AFB, USA
Notice type
Solicitation
Solicitation number
FA282322R0018
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2022-08-10
Deadline
2022-08-19
Place of performance
Eglin AFB, 32542

Description

Eglin Air Force Base (AFB), FL has a requirement to replace remove and replace the two sets of hangar doors at Hangar 102 on Eglin AFB, FL. This project includes, but is not limited to the following: this is a Design-Build (D-B) project for a complete replacement of the two sets of hangar doors and associated systems. The scope of work includes but is not limited to the following requirements and criteria: removal and disposal of both the north and south hangar doors, foundation rails, grout pack on top of foundation, and supporting structure for the door system as required. Installation of the new hangar doors with limited interference to the operation of the hangar space. A phasing plan which meets the Facility User’s mission requirements throughout the duration of construction will be developed by the contractor and submitted to the government for approval. The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the specifications. 10 August 2022 -- Formal Release of Amendment 0001 The purpose of Amendment 0001 is: 1. Post the site visit sign in sheet. 2. Post As-Builts for Bldg 102. NOTE- AS BUILT FILES ARE TOO LARGE TO UPLOAD TO SAM.GOV. INTERESTED PARTIES SHALL SEND AN E-MAIL TO MARY.HALLMON@US.AF.MIL TO REQUEST THEY BE SENT VIA DOD SAFE. 3. Post RFI questions and answers. As-Built Index included in response spreadsheet. Reference Project Date for most recent drawings. 4. Post general laydown area drawing. 5. Post revised 50 Division Worksheet

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in August 2022