Air Shower Installation
- Status
- Closed (archived notice)
- Agency
- United States Department of the Air Force
- Office
- EGLIN AFB, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- FA2823-22-Q-3004
- NAICS
- 333413 - Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- PSC
- 3694 - CLEAN WORK STATIONS, CONTROLLED ENVIRONMENT, AND RELATED EQUIPMENT
- Category
- Machinery & Components (5.1)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2022-07-15
- Deadline
- 2022-07-26
- Place of performance
- Eglin AFB, 32542
Description
** MODIFICATION 2: Requirement has been EXTENDED TO Tuesday, July 26, 2022 to allow vendors to prepare offers. Attached Vendor Questions and Answers. ** UPDATED Statement of Work (SOW) on Tuesady, July 12, 2022. Please SEE SECTION 3.1.1 t ** THE CHANGE: "Air shower and transition lights shall utilize the current power and voltage is now (208/3/60) available within the hangar." Provide materials, labor, and equipment to install Air Shower for the 33rd Fighter Wing (Corrosion Control Facility). The contractor will connect the Air shower to the existing building electric utilities as required by the Original Equipment Manufacturer (OEM) for proper operation. The contractor will troubleshoot any immediate problems with said work. A site visit will be held on 08 July 2022 @9:00 A.M for interested vendors at the respective site on Eglin AFB,FL. If you do not have access to the base please coordinate with Larissa Young at larissa.young.1@us.af.mil to coordinate for base access prior to the visit. All must confirm attendance on 29 June 2022 by 12noon. Please See attached Combined Synopsis and Soliciation (to include ALL Attachments for all pertinent information).Contacts
- Larissa Young
- Paul L. Brinckhaus
Email and phone are in the source notice.
More from United States Department of the Air Force posted in July 2022