Utilities Management Plan FY22
- Status
- Closed (archived notice)
- Agency
- United States Department of the Air Force
- Office
- TYNDALL AFB, USA
- Notice type
- Sources Sought
- Solicitation number
- FA805122R4001
- NAICS
- 541330 - Engineering Services
- PSC
- R425 - SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL
- Category
- Technical and Engineering Services (non-IT) (2.8)
- Posted
- 2021-08-17
- Deadline
- 2021-09-21
Description
The Air Force Civil Engineering Center (AFCEC) Operations Directorate, Asset Visibility Division, Utilities Branch (AFCEC/COAU) has a requirement to procure Engineering Services to produce installation Utilities Management Plans (UMPs) for two pilot test installations. The Contractor shall assess the current state of built infrastructure associated with the utility systems at Robins AFB, GA (RAFB) and Moody AFB, GA (MAFB) as pilot bases to develop an installation comprehensive UMP and develop short-term sustainment (1-4 years) and long-term (5-10 years) investment requirements for asset management implementation at each base. The Contractor shall be required to gather utilities information including engineering reports and studies and/or perform built infrastructure assessments and produce studies for utility systems including electrical, potable water, sewer/wastewater, natural gas, mechanical (thermal, heat, steam, etc. as applicable), storm water, and fuels systems in order to develop a UMP for each pilot base.Contacts
- Mrs. Lisa Jones
- Flavio Ely
Email and phone are in the source notice.
More from United States Department of the Air Force posted in August 2021