GFAFB A-E Project: Secondary Fire Station
- Status
- Closed (archived notice)
- Agency
- United States Department of the Air Force
- Office
- GRAND FORKS AFB, USA
- Notice type
- Presolicitation
- Solicitation number
- FA465921R0006
- NAICS
- 541310 - Architectural Services
- PSC
- C1JZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2021-06-15
- Deadline
- 2021-06-18
- Place of performance
- Grand Forks AFB, 58205
Description
This is a Request for Qualifications Package. See attached Pre-solicitation Notice for more details and Evaluation Criteria. See attached SOW with its attachments for project details. Background: Grand Forks AFB is working a partnership with Grand Forks County to jointly construct and equip a new satellite fire station on Grand Forks AFB to support both Grand Forks AFB and Grand Sky Park. Analysis of travel times from the existing main station and three proposed sites for a satellite station confirms that a second location is required to meet base response times along with providing response to Grand Sky Park. The Base Fire Department is currently unable to meet average response times of 7 minutes at a 90% rate as required in Department of Defense Instruction (DoDI) 6055.06 (Oct 3, 2019) to portions of the base and Grand Sky Park from current location.Contacts
- Carly Larson
- Maureen Harris
Email and phone are in the source notice.
More from United States Department of the Air Force posted in June 2021