ClickCease C130 Conversion into a Training Aid | Closed - MatchAwards

C130 Conversion into a Training Aid

Status
Closed (archived notice)
Agency
United States Department of the Air Force
Office
JBSA LACKLAND, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
FA805421Q0002
NAICS
488190 - Other Support Activities for Air Transportation
PSC
J015 - MAINT/REPAIR/REBUILD OF EQUIPMENT- AIRCRAFT AND AIRFRAME STRUCTURAL COMPONENTS
Posted
2021-05-10
Deadline
2021-06-10
Place of performance
Fort Bliss

Description

To disassemble, transport, reassemble, and install a designated C-130 Aircraft fuselage, from its current resting spot on the Fort Bliss flight line to the designated training site on Fort Bliss at the Desert Defender Marshaling Yard (50ft of fence will need to be removed and replaced). The contractor will provide and install a 5 Ton Heating, Ventilation, and Air Conditioning (HVAC) system and 100 amp electrical service to fully power the C-130 mechanical systems, HVAC, and lighting. The Aircraft is a C-130, 132’7” wide, 38’3” height, 97’9” long and weighs approximately 100,000 lbs. Contractor will need to install/place three (3) concrete pads for the aircraft to sit on and provide, assemble and install permanent stands supporting the C-130 landing gear on the pads. Additionally, provide and install/place two (2) concrete pads for wing tip tie downs. In addition, the contractor will provide any specialty materials, tools, and equipment required to meet the tasks outlined in the attached SOW. A more in-depth explanation of the tasks outlined can be found in the attached SOW.

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in May 2021

More lists