<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_air_force/posts/105938996488967864" -->

---
title: QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1 | Closed - MatchAwards
description: QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1. United States Department of the Air Force. Solicitation FA5575-21-B-0001. NAICS 237110 - Water and Sewer Line and Related Structures Construction. Deadline 2021-04-28. The work includes, but is not limited to: 1.1 Basic Package: a....
canonical: https://matchawards.com/dept_of_the_air_force/posts/105938996488967864
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1 | Closed
og:url: https://matchawards.com/dept_of_the_air_force/posts/105938996488967864
og:description: QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1. United States Department of the Air Force. Solicitation FA5575-21-B-0001. NAICS 237110 - Water and Sewer Line and Related Structures Construction. Deadline 2021-04-28. The work includes, but is not limited to: 1.1 Basic Package: a....
og:image: https://matchawards.com/system/accounts/avatars/000/000/081/original/b1dfb2d25d539fd5.png?1638989862
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1

Status

Closed (archived notice)

Agency

[United States Department of the Air Force](/dept%5Fof%5Fthe%5Fair%5Fforce)

Office

APO, USA

Notice type

Solicitation

Solicitation number

FA5575-21-B-0001

NAICS

[237110 - Water and Sewer Line and Related Structures Construction](/groups/213)

PSC

Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Posted

2021-03-23

Deadline

2021-04-28

Place of performance

41530

## Description

The work includes, but is not limited to: 1.1 Basic Package: a. Demolish existing underground pipe, manholes, valves, valve boxes, backflow preventers, water meters, fire hydrants, air relief valves and other existing elements and accessories, as indicated in the drawings. Those pipe sections that are no longer part of the potable water distribution system shall be capped. b. Furnish and install underground pipe, valves, valve boxes, T connections, backflow preventers, water flow meters, fire hydrants, and related elements and accessories, as indicated in the drawings. c. Paint new barrel type hydrants, including hydrant number. Install bollards around the new barrel type fire hydrants. Install bollards around the existing barrel type fire hydrants to remain. Disassemble the existing 4 ½ quick connectors in the barrel type hydrants to demolish and reinstall them in the new barrel type fire hydrants. Furnish and install similar 4 ½ quick connectors for the new hydrants, if necessary. Perform flow test in each hydrant (said tests will be performed by the Government, but the Contractor will be present during the test performance). Perform directional boring for the passage of new water piping below pavements, as indicated on the drawings. The drill opening will be protected by high density PN10 polyethylene jacket with an interior diameter big enough to easily introduce the new pipe including its electro-welded fittings. Repair leak #1: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #2: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #3: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #4: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #5: Demolish PVC DN200 main pipe section, T, manhole, lateral pipe to the backflow preventer and water meter. Install main PE100 PN10 DN200 high density polyethylene pipe, electro-welded polyethylene T, service line to the backflow preventer, gate valve, valve box and water meter. Reinstall above ground gate valve and strainer. Repair leak #6: Demolish 10 backflow preventer, water meter and accessories and install PE100 PN10 DN250 high density polyethylene pipe section. Demolish PE DN250 pipe section and install PE100 PN10 DN160 high density polyethylene pipe, 6 galvanized steel pipe, 6 backflow preventer, gate valves, water meter and accessories. Repair leak #7: Uncover 1 ½ galvanized steel pipe and replace with new PE100 PN10 DN50 high density polyethylene. Repair leak #8: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #9: Demolish PVC DN250 main pipe section, vertical pipe, air relief valve (to be relocated) and hammer arrestor. Install main PE100 PN10 DN250 high density polyethylene, polyethylene T with vertical outlet, DN110 polyethylene vertical pipe and relocate existing air relief valve. Repair leak #10: Demolish PVC DN200 main pipe section, vertical pipe and air relief valve (to be relocated). Install main PE100 PN10 DN200 high density polyethylene, polyethylene T with vertical outlet, DN110 polyethylene vertical pipe and relocate existing air relief valve. Repair leak #11: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #12: Demolish PVC DN200 main pipe section, T, lateral pipe, valve and valve box. Install main PE100 PN10 DN200 high density polyethylene, T, DN110 polyethylene lateral pipe, valve and valve box. Repair leak #13: Replace PVC DN200 pipe section with PE100 PN10 DN200 high density polyethylene pipe. Repair leak #14: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160 to the gate valve. Gate valve, valve box and flush type fire hydrant are to remain. Repair elements affected by project execution (pavement, topsoil, vegetation, sidewalks, etc.). The finish will be similar to the adjacent finish. Perform a leak detection survey to include the new water system installed, as well as the existing pipes that are fed from the new system and supply water to the buildings located inside the areas shown on the drawings as Zones A, B, C, D, E and F. GPS topographic study. General cleaning of the work site. Delivery of As-Built drawings. 1.2 Additive item: In case of finding underground obstructions during the pipe excavation, said obstructions shall be demolished and the excavation restored. In order to account for this potential fact an additive item computation has been considered in the project to include the following specific items Demolish underground concrete block (3 meters deep, 2x2x2 meters) and restore terrain: account for 20 units. Supply/install high density polyethylene pipe DN200 mm: account for 150 linear meters. Supply/install new underground 8 gate valve and valve box: account for 8 units. Supply/install new barrel type fire hydrant from main pipe to include T, pipe, gate valve, valve box and accessories. Valve and valve box to be furnished by the Government (GFM): account for 2 units. Road crossing (15 meters long): account for 10 units. 

<!-- mobian-agent-ad sponsored="true" id="45867a0c-6de8-48a7-9dfd-a813c9083527" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/47aa6735d23a4ca79cee72b50a8aa259/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50b08da236e0440ca713fd1d955b6281/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3c892d169474430ab63027364a5dbb32/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/80e058fcd1744353bdf2621c31533932/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4c08465c87584dc4bf1595969bc6b6e3/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9ce6b9782fd642e5a53045351207bbfd/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5b259dc1f7f64d2fb9247cd924c3601b/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/29f15015789c447893a2d19031419086/download)

## Contacts

* Elia M. Portz
* Christopher Meyer

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/8a3520175f334cee9963911b5202741b/view)

[More from United States Department of the Air Force posted in March 2021](/dept%5Fof%5Fthe%5Fair%5Fforce/archive/2021-03)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"QUUG 17-1000 RPR POTABLE WATER LINES, Morón AB Spain AREA 1","description":"The work includes, but is not limited to: 1.1 Basic Package: a. Demolish existing underground pipe, manholes, valves, valve boxes, backflow preventers, water meters, fire hydrants, air relief valves and other existing elements and accessories, as indicated in the drawings. Those pipe sections that are no longer part of the potable water distribution system shall be capped. b. Furnish and install underground pipe, valves, valve boxes, T connections, backflow preventers, water flow meters, fire hydrants, and related elements and accessories, as indicated in the drawings. c. Paint new barrel type hydrants, including hydrant number. Install bollards around the new barrel type fire hydrants. Install bollards around the existing barrel type fire hydrants to remain. Disassemble the existing 4 ½ quick connectors in the barrel type hydrants to demolish and reinstall them in the new barrel type fire hydrants. Furnish and install similar 4 ½ quick connectors for the new hydrants, if necessary. Perform flow test in each hydrant (said tests will be performed by the Government, but the Contractor will be present during the test performance). Perform directional boring for the passage of new water piping below pavements, as indicated on the drawings. The drill opening will be protected by high density PN10 polyethylene jacket with an interior diameter big enough to easily introduce the new pipe including its electro-welded fittings. Repair leak #1: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #2: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #3: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #4: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #5: Demolish PVC DN200 main pipe section, T, manhole, lateral pipe to the backflow preventer and water meter. Install main PE100 PN10 DN200 high density polyethylene pipe, electro-welded polyethylene T, service line to the backflow preventer, gate valve, valve box and water meter. Reinstall above ground gate valve and strainer. Repair leak #6: Demolish 10 backflow preventer, water meter and accessories and install PE100 PN10 DN250 high density polyethylene pipe section. Demolish PE DN250 pipe section and install PE100 PN10 DN160 high density polyethylene pipe, 6 galvanized steel pipe, 6 backflow preventer, gate valves, water meter and accessories. Repair leak #7: Uncover 1 ½ galvanized steel pipe and replace with new PE100 PN10 DN50 high density polyethylene. Repair leak #8: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe from the exterior of the manhole to the existing gate valve. Repair leak #9: Demolish PVC DN250 main pipe section, vertical pipe, air relief valve (to be relocated) and hammer arrestor. Install main PE100 PN10 DN250 high density polyethylene, polyethylene T with vertical outlet, DN110 polyethylene vertical pipe and relocate existing air relief valve. Repair leak #10: Demolish PVC DN200 main pipe section, vertical pipe and air relief valve (to be relocated). Install main PE100 PN10 DN200 high density polyethylene, polyethylene T with vertical outlet, DN110 polyethylene vertical pipe and relocate existing air relief valve. Repair leak #11: Replace PVC DN200 pipe with PE100 PN10 DN200 high density polyethylene pipe, replace PVC T with 200x200x160 electro-welded polyethylene T, replace existing lateral pipe with high density polyethylene pipe PE100 PN10 DN160, replace gate valve, valve box and above ground barrel type hydrant. Install 4 ½quick connection at the new hydrant. The gate valve and valve box for hydrant shall be furnished by the Government and installed by the Contractor. Repair leak #12: Demolish PVC DN200 main pipe section, T, lateral pipe, valve and valve box. Install main PE100 PN10 DN200 high density polyethylene, T, DN110 polyethylene lateral pipe, valve and valve box. Repair leak #13: Replace PVC DN200 pipe section with PE100 PN10 DN200 high density polyethylene pipe....","url":"https://matchawards.com/dept_of_the_air_force/posts/105938996488967864","identifier":"FA5575-21-B-0001","category":"237110 - Water and Sewer Line and Related Structures Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2021-03-23","availabilityEnds":"2021-04-28","areaServed":"41530","sameAs":"https://sam.gov/opp/8a3520175f334cee9963911b5202741b/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

