ClickCease Base Course Fill (F3ST701041A001) | Closed - MatchAwards

Base Course Fill

Status
Closed (archived notice)
Agency
United States Department of the Air Force
Office
HOLLOMAN AFB, USA
Notice type
Sources Sought
Solicitation number
F3ST701041A001
NAICS
423320 - Brick, Stone, and Related Construction Material Merchant Wholesalers
PSC
5610 - MINERAL CONSTRUCTION MATERIALS, BULK
Category
Construction Related Materials (4.1)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2021-03-03
Deadline
2021-03-10
Place of performance
Holloman AFB, 88330

Description

GENERAL REQUIREMENTS: 1. Supply all material, equipment, and labor necessary to perform all operations in strict accordance with these specifications in this SOW. The contractor is responsible for all required measurements and drawings. 2. Hours of normal operations shall be from 0730 to 1630, Monday – Friday, to exclude all federal holidays. All other dates and/or times must be approved by the government. Clean up shall be done daily within these hours, e.g. pick up scraps, vacuum as needed. COMPLIANCE: 1. The contractor has sole responsibility for compliance with all applicable federal, state, and local requirements regarding the health and safety of its employees. These requirements include, but are not limited to, the applicable provisions of the Title Codes of Federal Regulations (CFR) and regulatory guidelines regarding asbestos. Contractor must ensure safe and healthful working conditions for its employees 2. The contractor shall comply with all applicable federal, state, and local requirements regarding air emissions. The contractor has responsibility for determining the legal requirements that apply to his activities as well as compliance with those requirements. SCOPE OF WORK: Place gravel or crushed concrete in identified locations (shown in Attachment) as stated in the line items to follow. The improved area should be suitable for vehicle and forklift traffic. Contractor will have access to base supply of crushed concrete for use of base course/gravel. Any additional material will need to be supplied by the contractor. 1. The contractor will do cut/fills in order to have the appropriate areas to grade to accept 8” of base course. Suitable material moved can be placed in other areas where needed. 2. The Contractor will scarify and prepare the site for adding Base Course. This includes subgrade preparation, which will also require density and moisture testing as per user’s standard. 3. The contractor will have access to crushed concrete (from reuse area on base) base course as gravel equivalent to build the eleven appropriate areas (noted on drawing) at a depth of 8 inches. 4. The contractor will process and compact (to 95%) the material in 2 lifts, in order to achieve a proper density and moisture level per user’s standard. Testing will need to be done as per user’s standard. 5. The contractor shall maintain a positive drainage flow for all area’s worked on. 6. The contractor will supply and install an 18” culvert to run through the area #4 pad. It will be required to have 12” of Base Course on top of it. Borrow material or engineered fill may be used as a subgrade. 7. The contractor will supply a Power Broom or Sweeper Truck in order to maintain a clean work area.

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in March 2021

More lists