ClickCease Sole Source Requirement 450 Ton Chiller Rental for B20128 | Award - MatchAwards

Sole Source Requirement 450 Ton Chiller Rental for B20128

Agency
United States Department of Defense
Solicitation number
FA857126P0069
NAICS
532490 - Other Commercial and Industrial Machinery and Equipment Rental and Leasing
PSC
W045 - LEASE OR RENTAL OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
Category
Facility Related Materials (4.3)
Budget
333,153.60
Awardee
GEORGIA POWER COMPANY
Award date
2026-06-30
Place of performance
Atlanta, GA 30308, UNITED STATES

Description

The required 450-ton chiller rental service is already provided by Georgia Power Company. In
2022, Georgia Power Company provided the existing 450-ton chiller in which they delivered and
set up at building 20128. The existing chiller was purchased because the base central plant,
, failed in 2022. provides chilled water to most of the administrative and industrial
facilities. The cost of the repair at was originally estimated at $ and is not expected to
be completed until . While determining a solution, B20128 indicated that they had
production that was down due to the lack of sufficient chilled water that was going to cost about
per year and impact  production in as well. Therefore, the
current contract was awarded as a modification to the Loop 3 UESC project by US Army Corps
of Engineers (USACE) Huntsville Energy Division. WR-ALC and AFCEC have decided to
transfer contract administration of the UESC from US Army Corps of Engineers (USACE)
Huntsville Energy Division to Defense Logistics Agency Energy (DLAE). DLAE does not yet
have a contract in place that could be modified to keep the rental chiller through the transition
from Huntsville Energy Division to DLAE. This one-year rental service will ensure B20128 has
sufficient chilled water during the time of the USACE contract ending, , and DLAE
starting their contract, which is expected to be placed in the .