GSU Transformer Supply, Oahe Dam, SD & Ft Peck Dam, MT

Agency
United States Department of Defense
Solicitation number
W9128F25RA053
NAICS
335311 - Power, Distribution, and Specialty Transformer Manufacturing
PSC
6120 - TRANSFORMERS: DISTRIBUTION AND POWER STATION
Category
Facility Related Materials (4.3)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Budget
56,977,893.50
Awardee
PAF ELECTRICAL, INC.
Award date
2026-02-20
Place of performance
Gilbert, AZ 85234, UNITED STATES

Description

Project Description: Ft Peck Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include:
* Design and manufacturing of two new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
* Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.

Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include:
* Design and manufacturing of 10 new GSU transformers.
* Design and manufacturing of ancillary and control components.
* Performance of Factory Acceptance Testing (FAT).
* Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor.
*Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.