Repair Interior Renovation Bldg 90131
- Agency
- United States Department of Defense
- Solicitation number
- FA441725C0010
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Z2BZ - REPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Budget
- 8,053,275.00
- Awardee
- REASOR BUILDING GROUP LLC
- Award date
- 2025-07-16
- Place of performance
- Pensacola, FL 32504, UNITED STATES
Description
The 1st Special Operations Contracting Squadron, Hurlburt Field, FL has made an award for the subject contract to Reasor Building Group, LLC. Work Includes Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131 in accordance with project CP 1032233. Posted for early read-ahead for potential offerors to develop Requests for Information prior to established timelines identified in the final solicitation. Project Description: Repair - Interior Renovation Bldg 90131. Project CP1032233. The renovated space is to provide office and workspace for the 2nd Special Operations Facility. Work includes: Sitework: Provide new concrete sidewalk on south side of building, and bollards at the exterior stairs. Structural: New second-floor mezzanine and stairs at the western half of Bldg 90131. Constructed of structural steel beams/purlins, structural steel columns, and a composite floor system consisting of normal weight concrete on metal deck. The steel columns will require new shallow foundations. Replacement of the slab-on-grade at the foundations will consist of 5-inch-thick minimum reinforced concrete. Architectural: Demolition includes complete demolition of existing toilet rooms, central 2-story office pylon, trolley hoist system including beams and columns and some slab demolition. New work includes work on the first-floor additional restrooms, briefing room, break room, open office area, private offices, fitness room, personnel lockers, and 2 resting/bunk rooms. Interior finish systems include suspended acoustical tile ceilings, painted gypsum board on metal studs, new break room casework, and new toilet rooms with showers. Interior Design: Include interior finishes consist of no-wax, luxury vinyl tile flooring; modular carpet tile in the Open Office, Admin and Rest areas; thermoset rubber wall base; porcelain tile floors and walls in the Locker and Restrooms; Ceilings are open to structure or suspended acoustical tiles; Signage shall be modular, acrylic with printed paper inserts.
More from United States Department of Defense posted in July 2025