AIT Complex Phase IV Headquarters Building Construction Project, Fort Eustis; Virginia.
- Agency
- United States Department of Defense
- Solicitation number
- W9123625C2002
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1AZ - CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Budget
- 17,003,058.00
- Awardee
- STRUCTURAL ENGINEERING GROUP INC
- Award date
- 2024-11-07
- Place of performance
- Hamilton, VA 20158, UNITED STATES
Description
The work will include construction of a standard design Battalion Headquarters Building (10,900 SF) and a standard design Brigade Headquarters Building (9,450 SF), both being single story facilities. Construction includes: special foundation, fire protection and alarm systems and Energy Monitoring Control Systems (EMCS) connection. Sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage, and site improvements. Heating and air conditioning will be provided by self-contained systems. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. The project will provide a building that will be safe to personnel, protect mission critical assets and comply with current design criteria and all applicable codes. All utility connection work required by the contract documents will need to be coordinated with the Privatized Utility Providers at JBLE-Eustis.
More from United States Department of Defense posted in November 2024