F-35 THREE BAY SPECIALIZED HANGAR
- Agency
- United States Department of Defense
- Solicitation number
- W50S9F-22-C-0004
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1BZ - CONSTRUCTION OF OTHER AIRFIELD STRUCTURES
- Category
- Construction Related Services (4.2)
- Budget
- 27,640,569.00
- Awardee
- J. H. Findorff & Son, Inc. WI 53703-3622 USA
- Award date
- 2022-09-22
- Place of performance
- MADISON, WI 53704-2591, USA
Description
This project is to construct a new 3-Bay hangar compatible with the F-35 mission to be able to support fuel cell operations, indoor wash requirements, squadron level surface coating operations and weapons load training (WLT) operations. Construction will also require the complete demolition of Building 414 (19,875 SF) prior to building the new 3-Bay Specialized Hangar (31,000 SF). Scope of work will include, but is not limited to, demolish Building 414 completely and construct a new three bay hangar and associated shop and administrative space. Hangar bays will consist of pre-conditioned aircraft air, 270 VDC aircraft power, fire suppression, and hangar bay HVAC. Administrative and shop spaces as well as space to accommodate future paint booth and composite make-up clean/dirty spaces. Facility will also require a lightning protection system, fall protection (interior and exterior) and an Advantor security system. This project will be registered with the United States Green Building Council (USGBC). All work will be in accordance with design requirements, specifications, and drawings provided within the master specifications.More from United States Department of Defense posted in September 2022