Repair Test Cell Doors, Bldgs. 175 & 176, NAS Lemoore, CA

Agency
United States Department of Defense
Solicitation number
N62473-22-R-J501
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z2BZ - REPAIR OR ALTERATION OF OTHER AIRFIELD STRUCTURES
Category
Facility Related Services (4.4)
Budget
294,000.00
Awardee
MACRO-Z-TECHNOLOGY COMPANY CA 92701-3878 USA
Award date
2022-08-11
Place of performance
SAN DIEGO, CA 92132-0001, USA

Description

At Buildings 175 and 176 the main Test Cell doors are not fully operable. Both buildings need fully functioning doors and guide vane systems repaired back to original installed condition. Contractor shall provide the following: all labor, materials, equipment, incidental engineering, transportation necessary and supervision to ensure a complete and finished product as described in general in the scope of work or shown on any attached drawings. All work shall be performed during regular working hours. Contractor is only able to work on one building at a time. Government will not guarantee contractor is able to work on both buildings at the same time. The main blast doors do not need to be removed, nor do the dents need to be fixed, UNLESS the dents are preventing operations of the door systems. Building 175 a. Test and repair all related components related to the main Test Cell door to include but not limited to: (hydraulic systems, locks, hinges and wheels). b. Remove and replace entire guide vane mechanical system, to include but not limited to: motors, chains and sprockets. Building 176 a. Test and repair all related components related to the main Test Cell door to include but not limited to: (hydraulic system, locks, hinges and wheels). b. Remove and replace entire guide vane mechanical system, to include but not limited to: motors, chains and sprockets. c. Repair turning vanes to allow operations without any friction between stationary and movable vanes. d. Remove and replace the locking cylinders for the turning vane. Adjust limit switches as needed to allow proper locking.