Middle Logan Creek Flood Risk Management Project, Phase 2 Randolph, NE
- Agency
- United States Department of Defense
- Solicitation number
- 8156
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
- Category
- Construction Related Services (4.2)
- Budget
- 7,996,440.40
- Awardee
- Iron Mike Construction Llc CO 80112-3922 USA
- Award date
- 2022-03-01
- Place of performance
- OMAHA, NE 68102-4901, USA
Description
The flood risk reduction project is along the Middle Logan Creek in Randolph, Nebraska. The work reach extends from approximately 550-feet upstream of County Line Road (558th Ave) to 150 feet upstream of Sholes Road bridge. The work in general comprises: 1) Earthwork/grading for the realigned and widened Middle Logan Creek channel -excavating existing channel to a widened channel bottom of 40 feet with 95-foot top width, 3:1 side slopes, and a 5-foot wide and 1-foot deep low flow channel. 2) Transition from natural channel approximately 400 feet upstream of 558th Ave bridge to the trapezoidal widened channel section. 3) Channel improvements with erosion and grade control, placement of new riprap, and other erosion control include turf reinforcement mat, seeding, erosion control blanket, silt fence, etc. 4) New and extended storm drain structures. 5) Removal and replacement of Main St., Douglas St., and 558th Ave bridges. 6) Removal of a 42-foot long pedestrian bridge, not to be replaced. 7) Horizontal roadway realignment for Main St. bridge and vertical roadway realignment for the approaches to Main St., Douglas St. and 538th Ave bridge. 8) Shoo flybridge detour for 558th Ave bridge construction. 9) New 3 strand barb wire fencing, new concrete pavement, and new aggregate pavement; and 10) Installation of a new sanitary sewer siphon system and four domestic waterlines.More from United States Department of Defense posted in March 2022