Lateral Pull Test Fixture Sole Source
- Agency
- United States Department of Defense
- Solicitation number
- JA-21-NAT-367
- NAICS
- 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
- PSC
- 3695 - MISCELLANEOUS SPECIAL INDUSTRY MACHINERY
- Category
- Machinery & Components (5.1)
- Budget
- 418,800.00
- Awardee
- CHANT ENGINEERING CO., INC. PA 18901-5186 USA
- Award date
- 2021-07-29
- Place of performance
- NATICK, MA 01760-5011, USA
Description
Lateral Pull Test Fixture (LPTF) The DEVCOM-SCs Roller Load Test Facility (RLTF) requires lateral proof load testing capability up to 60,000 lbs. on 32-ftlong platforms and the ability to record data from load cells and accelerometers. The LPTF will be similar in capability/operation as the existing 100K-lb capacity hydraulic ram that applies load in a longitudinal direction for the RLTF This fixture hydraulic ram that applies load in a longitudinal direction for the RLTF. This fixture will be used to apply loads (cap. 100K-lbs) in the lateral direction. The turnkey LPTF system that will integrate into existing Hardware/Software currently used in the facility to apply/measure horizontal loads. A load cell will be included and connected to the current roller test data acquisition system.More from United States Department of Defense posted in July 2021