DB Small Craft Boat Ramp @ Navy Point on Blount Island
- Agency
- United States Department of Defense
- Solicitation number
- N6945021C0003
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1PA - CONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
- Category
- Construction Related Services (4.2)
- Budget
- 1,669,305.00
- Awardee
- G.M. HILL ENGINEERING, INC. Jacksonville FL USA
- Award date
- 2020-11-23
- Place of performance
- NAS JACKSONVILLE, FL 32212-0030, USA
Description
Contractor to completely prepare site for building operations, including limited demolition and removal of existing structures and furnish all labor, materials, tools, equipment and qualified supervision to perform all work associated with Design-Build (DB) construction activities consisting of design and construction to complete all work associated with DB Small Craft Boat Ramp @ Navy Point Project (BI1708R) on Blount Island, Jacksonville, FL. The project work includes but not limited to the design and construction sheet pile foundation, fill, reinforced concrete slab on grade, asphalt paving from concrete ramp to roadway, and includes underground electrical distribution and two exterior lighting poles.More from United States Department of Defense posted in November 2020