USS MACAMPBELL (DDG 85) Depot Modernization Period 0C1.
- Agency
- United States Department of Defense
- Solicitation number
- N4523A20R0550
- NAICS
- 336611 - Ship Building and Repairing
- PSC
- J999 - NON-NUCLEAR SHIP REPAIR (WEST)
- Budget
- 155,516,773.25
- Awardee
- VIGOR MARINE LLC Portland OR USA
- Award date
- 2020-07-06
- Place of performance
- BREMERTON, WA 98314-5001, USA
Description
This fixed-price contract not competitively awarded. NAVSEA Acquisition Plan for sole source acquisition approved other than full and open strategy. Justification and Authorization Number NW20-04JA authorized solicitation and award to sole-source named Vigor Marine LLC; their Portland, Oregon facility cited as location of performance. NW20-04JA) cites 10 U.S.C. 2304 (c) (3), Industrial Mobilization. NW20-04JA attached to this notice. In accordance with Industrial Mobilization authority, Navy intends to expand the existing industrial base of dry-dock shipyards capable of meeting PACFLEET ship repair requirements on the West Coast and maintain properly balanced sources for meeting future requirements of the surface ship maintenance program. Current supply of NAVSEA certified, West Coast dry-docks insufficient for USPACFLT during Fiscal Years 2020-2023 at a minimum. Work scope of 313 Work Items (WI) including 29 Option Items. Option Items expire 30 Sep 20 in accordance with filled in FAR clause 52.217-7. Contractor period of performance is 404 days. The complexities of this AVAIL stem from coordinating over three hundred WIs rather than the nature of the work. The significant areas of work for labor effort and schedule impact are: a. Tanks the preservation requirement includes cleaning, blasting, inspection, repair and paint for every tank on the ship. b. Hull and Superstructure another huge preservation effort required for the entire hull and superstructure. c. Combat Information Center (CIC) modernization WIs for this space require significant access and rigging work. The Contractor will perform access cuts, remove interferences, and perform rigging to remove existing equipment; and provide temporary services and rigging and other support for the installation of new equipment by Alteration and Installation Teams (AIT).More from United States Department of Defense posted in July 2020