SHORE PROTECTION PROJECT, ANNA MARIA ISLAND, BEACH RENOURISHMENT 2020, MANATEE COUNTY, FLORIDA
- Agency
- United States Department of Defense
- Solicitation number
- W912EP20F0119
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1KF - CONSTRUCTION OF DREDGING FACILITIES
- Category
- Construction Related Services (4.2)
- Budget
- 17,366,350.00
- Awardee
- MARINEX CONSTRUCTION, INC. Charleston SC USA
- Award date
- 2020-04-10
- Place of performance
- JACKSONVILLE, FL 32207-0019, USA
Description
The proposed project is to nourish approximately 5.5 miles of shoreline Anna Maria Island using beach compatible material. Work consists of beach fill between R-12 to R-41+305. The primary sand source will be located in Passage Key Inlet ebb shoal. The fill template design includes a berm crest elevation of +4.0 feet North American Vertical Datum 1988 (NAVD88). The seaward face of the berm has a slope of 1v:14h from R-12 to R-33 and a slope of 1v:15h for R-33 to R-41+305. The cut depths at the borrow areas vary from 14 feet to 27 feet with a two-foot disturbance depth. Project work also includes, but is not limited to, beach tilling, construction/vibration control and monitoring, turbidity monitoring, pipeline corridor mapping, endangered species monitoring, sea turtle trawl-sweeping (hopper dredges only), beach fill remediation, and incidental related work.More from United States Department of Defense posted in April 2020