ClickCease J061--SOURCES SOUGHT NOTICE - Triennial Electrical Inspection… | Closed - MatchAwards

J061--SOURCES SOUGHT NOTICE - Triennial Electrical Inspection Testing and Maintenance Services Requirement - Louis A Johnson VA Medical Center 36C24527Q0039

Status
Closed, the response deadline passed on Nov 5, 2026
Agency
United States Department of Veterans Affairs
Office
LINTHICUM, USA
Notice type
Sources Sought
Solicitation number
36C24527Q0039
NAICS
238210 - Electrical Contractors and Other Wiring Installation Contractors
PSC
J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT
Posted
2026-10-20
Deadline
2026-11-05
Place of performance
Clarksburg, West Virginia 26301, UNITED STATES

Description

SUMMARY The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Network Contracting Office (NCO) 5, is issuing this Sources Sought Notice to identify vendors that are interested in and capable of providing the required services. The Louis A. Johnson VA Medical Center, located in Clarksburg, WV, requires a contractor to provide Triennial Electrical System Inspection, Testing, and Maintenance for the facility. Interested vendors should review the Statement of Work (SOW) to determine the specific services required. NCO 5 is seeking responses from firms that are interested in this procurement and possess the resources, capabilities, and qualifications necessary to perform these services. Anticipated NAICS CODE 238210, PSC CODE J061 Please submit your capabilities statement and provide responses to all questions listed below. SOURCES SOUGHT NOTICE: 36C24527Q0039 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number & email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (including applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable) 8. Confirmation that your organization has the capability and expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Respond to this Notice 36C24527Q0039 by 11-05-2026 @ 10 AM ET. Send all responses to Billie.Pratt@va.gov Subject line on email: 36C24527Q0039 Sources Sought Notice | Company Name STATEMENT OF WORK Triennial Electrical System Inspection, Testing, and Maintenance Louis A. Johnson VA Medical Center (688) 1 Medical Center Drive Clarksburg, WV 26301 Document Number ENG-SOW-2026-ELEC-TRI-001 Revision Rev 1 Generator load bank, arc flash, and power quality scope removed (separate contracts) Date Issued May 2026 Originating Activity Engineering Service (138), LAJ VAMC Cognizant Official Contracting Office VISN 5 Network Contracting Office Anticipated Vehicle Firm-Fixed-Price (FFP), Single-Award Set-Aside To be determined by Contracting Officer (SDVOSB priority per VAAR 819.7004) Period of Performance 180 calendar days from NTP, with mobilization NLT 30 days from award 1.0 GENERAL INFORMATION 1.1 Purpose The Department of Veterans Affairs (VA) requires a qualified electrical testing contractor to perform the triennial inspection, testing, and preventive maintenance of the normal and Essential Electrical System (EES) distribution and support equipment at the Louis A. Johnson VA Medical Center (LAJ VAMC), Clarksburg, West Virginia. The intent of this work is to verify the integrity, reliability, and code compliance of the in-scope electrical equipment, identify and correct deficiencies, and provide the documentation required to satisfy The Joint Commission (TJC), CMS Conditions of Participation, NFPA, and VA accreditation/inspection requirements for the elements within scope. 1.2 Background LAJ VAMC is a VHA Complexity Level 2 medical center within VISN 5. The campus electrical distribution serves Type 1 Essential Electrical Systems under NFPA 99 (Life Safety, Critical, and Equipment Branches). Buildings within scope include the main hospital, Boiler Plant, building 7, Building 20, the Clinical Addition, and supporting structures. The previous comprehensive triennial electrical inspection was performed in CY 2023; this procurement covers the CY 2026 cycle for the in-scope equipment. Generator triennial preventive maintenance and 3-year load bank testing (NFPA 110-2025 §8.4.2), the arc flash risk assessment / coordination study refresh, and any campus power quality / harmonics survey are being procured under separate contract vehicles and are NOT within the scope of this SOW. 1.3 Objective Achieve and document one hundred percent (100%) compliance with all applicable codes and standards listed in Section 3.0 for the equipment categories within scope, including but not limited to NFPA 70-2023 (NEC), NFPA 70B-2023, NFPA 70E-2024, NFPA 99-2024, NFPA 101-2024, NFPA 111-2022, ANSI/NETA MTS-2023, VHA Directive 1028, and VA PG-18-10. 1.4 Definitions and Acronyms Acronym Definition AHJ Authority Having Jurisdiction ATS Automatic Transfer Switch CHENG / DCE Chief Engineer / Deputy Chief Engineer COR Contracting Officer's Representative EES Essential Electrical System (NFPA 99 Type 1) GFCI Ground-Fault Circuit Interrupter IRT Infrared Thermography LAJ VAMC Louis A. Johnson VA Medical Center, Clarksburg, WV NETA InterNational Electrical Testing Association PM Preventive Maintenance SOW Statement of Work UAN / UAC Utility Advisory Notice / Utility Advisory Committee UPS Uninterruptible Power Supply VLF Very Low Frequency (cable test method) NF 2.0 SCOPE OF WORK The Contractor shall furnish all labor, supervision, NETA-certified personnel, licensed electricians, professional engineering oversight, test equipment, calibrated instrumentation, materials, transportation, lodging, per diem, and incidentals necessary to perform the triennial inspection, testing, cleaning, and minor corrective maintenance of the in-scope electrical distribution and support equipment at LAJ VAMC, in accordance with Sections 3.0 and 4.0 of this SOW. 2.1 General Scope Summary Work shall include, but is not limited to: Visual, mechanical, and electrical testing of medium-voltage (MV) and low-voltage (LV) switchgear, switchboards, panelboards, motor control centers (MCCs), distribution and unit substations, dry-type and liquid-filled transformers, busway, and feeder cables. Functional testing and exercising of all Automatic Transfer Switches (ATSs) on the Life Safety, Critical, and Equipment Branches. Protective relay testing, calibration, and trip-curve verification on all MV and selected LV electronic-trip breakers (settings verified against the existing Government-furnished coordination study; no study revision performed under this SOW). Insulation resistance, contact resistance, and primary injection testing of LV power circuit breakers; secondary injection where applicable. Ground electrode and grounding system resistance testing (3-point fall-of-potential). Energized infrared thermographic survey of all electrical equipment from service entrance through branch panelboards. Patient care space receptacle testing in accordance with NFPA 99-2024 §6.3.3.3 (line voltage, polarity, grounding integrity, retention force). UPS battery system inspection and testing in accordance with NFPA 111-2022 and IEEE 1188 (VRLA) / IEEE 450 (vented). Documentation reconciliation of in-scope equipment maintenance records, deficiency reporting, and final triennial test report package. 2.2 Out of Scope (Procured Under Separate Contracts) The following are EXCLUDED from this contract and are being procured under separate contract vehicles: Generator triennial preventive maintenance and the NFPA 110-2025 §8.4.2 three-year load bank testing of the four (4) facility emergency standby generators. Arc Flash Risk Assessment update and Short-Circuit / Time-Current Coordination Study refresh, including arc flash labeling. (The Contractor under this SOW shall use the Government-furnished current arc flash study and labels for PPE selection only.) Campus Power Quality / harmonics survey, including IEEE 519 evaluation, transient capture, voltage sag/swell logging, and any related instrumentation. Replacement of major equipment (e.g., generators, transformers, switchgear) beyond the minor consumables and corrective work allowed under CLIN 0013. New construction, renovation, or substantial design work. Medium-voltage cable replacement (testing only is in scope). Lightning protection system inspection (separate NFPA 780 contract). Fire alarm system testing (separate NFPA 72 contract). Repairs exceeding $2,500 per item without prior written authorization from the Contracting Officer. 3.0 APPLICABLE DOCUMENTS, CODES, AND STANDARDS All work shall conform to the latest edition adopted by the AHJ as of the date of award. Where standards conflict, the most stringent shall govern. Contractor shall verify edition currency with the COR prior to mobilization. NFPA 110 and NFPA 70E are listed for limited reference (documentation reconciliation, contractor electrical safety) only; no testing under those standards is performed under this SOW. 3.1 National Fire Protection Association (NFPA) Standard Title Edition NFPA 70 National Electrical Code (NEC) 2023 NFPA 70B Standard for Electrical Equipment Maintenance (mandatory) 2023 NFPA 70E Electrical Safety in the Workplace (contractor safety only) 2024 NFPA 99 Health Care Facilities Code 2024 NFPA 101 Life Safety Code 2024 NFPA 110 Emergency & Standby Power (ATS / documentation reference only) 2025 NFPA 111 Stored Electrical Energy Emergency and Standby Power Systems 2022 3.2 Department of Veterans Affairs (VA) VHA Directive 1028 (current) Electrical Power Distribution Systems VA Master Construction Specifications, Division 26 Electrical (current) VA PG-18-10 Electrical Design Manual for VA Hospital Facilities (current) VA PG-18-3 Topic 3, Design and Construction Procedures 3.3 Industry Standards ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems ANSI/NETA ETT-2022 Standard for Certification of Electrical Testing Technicians IEEE 43 Recommended Practice for Testing Insulation Resistance of Electric Machinery IEEE 80 / 81 Substation Grounding / Earth Resistance Measurement IEEE 400.2 Field Testing of Shielded Power Cable Systems Using VLF ( 0.1 Hz) IEEE 450 Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries IEEE 1188 Maintenance, Testing, and Replacement of VRLA Batteries IEEE C57.12.90 Test Code for Liquid-Immersed Distribution Transformers IEEE C57.106 Guide for Acceptance and Maintenance of Insulating Oil IEEE C2 (NESC) National Electrical Safety Code ASTM D877 / D1816 Dielectric Breakdown of Insulating Liquids 3.4 Regulatory and Accreditation The Joint Commission (TJC) Environment of Care: EC.02.05.03, EC.02.05.05, EC.02.05.07, EC.02.05.09 (in-scope elements only) CMS Conditions of Participation, 42 CFR §482.41 Physical Environment OSHA 29 CFR 1910.137 Electrical Protective Equipment OSHA 29 CFR 1910.269 Electric Power Generation, Transmission, and Distribution OSHA 29 CFR 1910 Subpart S Electrical OSHA 29 CFR 1926 Subpart K Electrical (Construction) 4.0 TECHNICAL REQUIREMENTS Each subsystem below corresponds to a Contract Line Item Number (CLIN) in Section 12.0. All testing shall conform to the visual, mechanical, and electrical test procedures and pass/fail acceptance criteria of ANSI/NETA MTS-2023 unless a more stringent VA or NFPA requirement applies. 4.1 Medium-Voltage (15 kV Class) Switchgear and Distribution Applies to the campus 15 kV-class metal-clad/metal-enclosed switchgear, primary disconnects, MV cable, and step-down transformers feeding the main hospital service. 4.1.1 Visual and Mechanical (NETA MTS §7.1) De-energize, lock-out / tag-out (LOTO), clean (vacuum and approved solvent) all compartments; inspect for arc tracking, contamination, corona, mechanical damage, hardware torque per manufacturer. Verify nameplate, mechanical interlocks, key interlock schemes, racking mechanisms, shutters, and viewing windows. Inspect grounding, bonding, and ground bus continuity. Lubricate per manufacturer; replace consumables (filters, desiccants, indicator lamps). 4.1.2 Electrical Tests (NETA MTS §7.1) Insulation resistance phase-to-phase and phase-to-ground, 1 minute (5,000 VDC for 15 kV class). AC overpotential / VLF withstand on MV cables per IEEE 400.2 (0.1 Hz, 22 kV peak for 15 kV class), if cable age exceeds 10 years. Contact resistance (ductor) on bus connections ( +50% of like-equipment baseline). Vacuum bottle integrity test (DC overpotential) on vacuum interrupters. Power factor / dissipation factor on MV bushings, CTs, and transformers (Doble M4000 or equivalent). 4.2 Low-Voltage Switchgear, Switchboards, and Panelboards 4.2.1 Visual and Mechanical (NETA MTS §7.1, §7.5, §7.6) Open and inspect every switchboard, distribution panel, and lighting panelboard not exceeding 24 months since last internal inspection (priority: service entrance, EES gear, ICU, OR, ED panels). Torque-check all bolted bus connections to manufacturer specification or NETA Table 100.12; document with calibrated torque wrench. Verify breaker-to-bus stab integrity, bracing, and bonding. 4.2.2 Electrical Tests Insulation resistance, phase-to-phase and phase-to-ground, 1,000 VDC minimum for 600 V class. Primary current injection on all main, tie, and feeder LV power circuit breakers 800 A frame; secondary injection on solid-state trip units. Settings shall be verified against Government-furnished current Coordination Study; deviations shall be reported as deficiencies. Contact / pole resistance on every LV power breaker; compare to baseline. GFCI testing on all required circuits (operability + 6 mA trip per UL 943). Verify and tighten neutral and ground bonding; verify single-point bonding at separately derived systems per NEC 250.30. 4.3 Distribution and Unit Substation Transformers Includes campus dry-type transformers and any liquid-filled units within scope. Visual inspection: enclosures, ventilation, bushings, indicators, sound level, infrared baseline. Insulation resistance (1 min / 10 min, polarization index) per IEEE 43. Turns-ratio test (TTR) all taps, all phases. Winding resistance (DC) per IEEE C57.12.90. For liquid-filled: dielectric breakdown (ASTM D877/D1816), Dissolved Gas Analysis (DGA) per IEEE C57.104, water content, acidity, IFT, and color. Verify and torque all bolted connections. 4.4 Automatic Transfer Switches (ATS) Life Safety, Critical, Equipment Branches Inspect contacts, mechanism, controllers, and wiring on every ATS. Verify timing settings: TDNE (time delay normal-to-emergency), TDEN, TDES, TDEC; document against NFPA 110 §6.2.6 and facility settings. Perform load-side and source-side voltage and phase rotation checks. Functional transfer test under no-load and (Government-coordinated) under-load; document transfer times. Bypass-isolation operation (where equipped) exercise both bypass and isolation positions. Replace consumable contacts where pitting > 25% per manufacturer. NOTE: Generator starting and the load-side EPSS performance test under NFPA 110-2025 §8.4.2 are excluded from this SOW (separate contract). ATS-side functional verification shall be coordinated with the generator contractor's testing window where practical. 4.5 Protective Relay Testing Test all MV protective relays (50/51, 50/51N, 87, 27/59, 81, etc.) per ANSI C37.90 and NETA MTS §7.9. Verify settings against the Government-furnished current Coordination Study any deviation reported as a deficiency. (Study revision and arc flash incident energy recalculation are out of scope; see §2.2.) Functional trip test through the breaker (system test) on at least one device per protection zone. Provide before-and-after settings record and certified test reports. 4.6 Grounding System Three-point fall-of-potential test on the main service ground per IEEE 81; target 5 ohms per VA PG-18-10. Two-point bond-resistance testing on equipment grounds and lightning ground ring tie-ins (visual only for LP system). Verify isolated ground (IG) integrity in patient care spaces and IT/data closets. 4.7 Infrared Thermographic Survey Energized scan with calibrated radiometric camera ( 0.05°C NETD, < 12 months since calibration). 100% of normal and emergency switchgear, switchboards, MCCs, ATSs, distribution panels, motor starters, and major feeders. Use NETA / NFPA 70B Table L.2 severity classification (Priority 1 through 4); deliver report with thermograph + visible-light reference image, T to reference, load condition, and recommended action for every anomaly. 4.8 Patient Care Space Receptacle Testing (NFPA 99-2024 §6.3.3.3) Test 100% of receptacles in all Category 1 and Category 2 patient care spaces (Operating Rooms, ICU, PACU, Cath/Procedure, ED treatment rooms, Dialysis, Med/Surg patient bedrooms). Test polarity, line voltage, grounding integrity, and physical retention force ( 115 g per NEMA WD-6 / NFPA 99 6.3.3.3). Tag failures; immediately notify DCE; lockout failed receptacles per facility policy until repaired. Provide room-by-room electronic test record (CSV/Excel) compatible with the existing LAJ Engineering tracking format. 4.9 UPS and Stored Energy Systems (NFPA 111) Inventory all centralized and unit-level UPS supporting EES or critical clinical loads. Battery impedance / conductance testing (every cell/jar) per IEEE 1188 (VRLA) or IEEE 450 (vented). Charger and inverter functional test; transfer to bypass and back. Discharge / runtime test where battery age 50% of expected service life. 4.10 Documentation Reconciliation (In-Scope Equipment) Verify single-line diagrams are current and posted at switchgear locations per NFPA 70B §8.2. Reconcile maintenance records for equipment within this SOW's scope; identify gaps. Submit gap analysis with recommended corrective actions. (Note: EPSS / NFPA 110 §8.3 records reconciliation is performed by the separate generator contract.) 5.0 CONTRACTOR QUALIFICATIONS AND PERSONNEL 5.1 Firm Qualifications Prime Contractor shall be an ANSI/NETA-Accredited Company in good standing OR shall hold equivalent third-party accreditation acceptable to the AHJ. Minimum five (5) years continuous experience performing comparable electrical testing in occupied healthcare facilities. Documented completion of at least three (3) projects of similar size and scope at hospitals, VAMCs, or DoD healthcare facilities within the past 60 months. Active ISO 9001:2015 quality management system, NETA Quality Assurance program, or equivalent. Current general liability insurance $2,000,000 per occurrence; professional liability $1,000,000; workers' compensation per WV statute. 5.2 Key Personnel and Skill-Level Requirements All on-site personnel shall meet, at minimum, the certification and experience levels below. Resumes and copies of certifications shall be submitted with the proposal. Role Min. Qty Required Qualification Project Manager 1 Min. 10 yrs electrical testing PM experience; PMP preferred; healthcare project portfolio required. Professional Engineer (PE) 1 (part-time) Licensed in West Virginia; minimum 8 yrs power systems experience; oversight role only (no study seal required under this SOW). NETA Level IV Senior Tech 1 ANSI/NETA ETT certified Level IV; lead MV switchgear, relay, and transformer field activities. NETA Level III Tech 2 ANSI/NETA ETT certified Level III; lead LV breaker testing, ATS, IRT, and battery work. NETA Level II Tech 3 ANSI/NETA ETT certified Level II; perform supervised testing under Level III/IV. NETA Level I / Apprentice 2 ETT Level I or documented apprentice; assist, document, support LOTO and barricading. WV Master Electrician 1 Licensed in WV; required for any conductor terminations and code-compliance authority on site. Site Safety Offi

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of Veterans Affairs posted in October 2026

More lists