<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/117032845991158165" -->

---
title: Radiation Therapy Quality Management System Deployment and… | Closed - MatchAwards
description: Radiation Therapy Quality Management System Deployment and Training. United States Department of Veterans Affairs. Solicitation 36C25526Q0570. NAICS 332510 - Hardware Manufacturing. Deadline 2026-08-10. STATEMENT OF WORK SOW as of: 6/3/2026 2. Contract Title Radiation Therapy Quality Management...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/117032845991158165
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Radiation Therapy Quality Management System Deployment and… | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/117032845991158165
og:description: Radiation Therapy Quality Management System Deployment and Training. United States Department of Veterans Affairs. Solicitation 36C25526Q0570. NAICS 332510 - Hardware Manufacturing. Deadline 2026-08-10. STATEMENT OF WORK SOW as of: 6/3/2026 2. Contract Title Radiation Therapy Quality Management...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Radiation Therapy Quality Management System Deployment and Training

Status

Closed, the response deadline passed on Aug 10, 2026

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

LEAVENWORTH, USA

Notice type

Sources Sought

Solicitation number

36C25526Q0570

NAICS

[332510 - Hardware Manufacturing](/groups/443)

PSC

5975 - ELECTRICAL HARDWARE AND SUPPLIES

Posted

2026-08-03

Deadline

2026-08-10

Place of performance

Kansas City, Missouri 64128, UNITED STATES

## Description

_STATEMENT OF WORK_

  
_SOW as of: 6/3/2026_

_2\. Contract Title_

_Radiation Therapy Quality Management System Deployment and Training._

_3\. Background_

_The VA Medical Center – Overland Park requires a comprehensive software system to support quality assurance for radiotherapy treatment delivery and associated treatment machines. This effort will enable the facility to improve patient safety by verifying that radiotherapy treatment machines operate within defined tolerances and by supporting routine and patient‑specific quality assurance workflows._

<!-- mobian-agent-ad sponsored="true" id="10a137b2-8960-415b-b1a2-decf7d642580" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


_The work described in this SOW covers the initial deployment, configuration, and clinical adoption support for a new quality management software system for linear accelerators and related oncology information systems. It includes remote installation, configuration, verification, training, and adoption support necessary to achieve clinical “go‑live” at the VA Medical Center – Overland Park._

_4\. Scope_

_The scope of this SOW includes all contractor activities necessary to deploy the radiation therapy quality management software system in the VA Medical Center – Overland Park production environment, configure it for use with existing treatment machines and oncology information systems, verify correct operation, train clinical and technical staff, and support adoption through initial clinical use._

_The work will be performed primarily via remote services, with coordination among Medical Center project leadership, information technology staff, and clinical staff. The scope is limited to the Medical Center’s production data center and associated radiotherapy equipment and does not extend to other facilities or systems beyond those explicitly identified herein._

_5\. Specific Tasks_

_5.1 Task 1 – Project Management and Initiation_

_The contractor shall provide project management services to plan, coordinate, and oversee all deployment activities. This includes identification of key project personnel (Executive Sponsor, Project Manager, IT Lead, and Clinical Lead), development of a communication plan, and coordination of all dependencies required to initiate the project._

_Subtask 5.1.1 – Project Initiation_

* _Confirm and review all aspects of the order and associated deliverables._
* _Discuss preliminary dependencies such as server readiness, virtual environment requirements, linear accelerator prerequisites, and any required beam modeling activities._
* _Identify project goals, objectives, and additional stakeholders._
* _Establish the communication plan (methods, types, style, and schedule of status updates and meetings)._

_Deliverables (Task 1):_

* _Project communication plan._
* _Initial project schedule and milestone list._

_5.2 Task 2 – System Installation and Environment Configuration_

_The contractor shall perform remote installation of the quality management software system to the latest approved version on the Medical Center’s designated production server(s) in a new virtual environment._

_Subtask 5.2.1 – Pre‑Installation Validation_

* _Validate that the production server(s) meet required CPU, RAM, storage, and graphics specifications._
* _Verify network attachment, connectivity, and performance levels necessary to support expected user experience._
* _Confirm availability of necessary software licenses for installation._

_Subtask 5.2.2 – Software Installation_

* _Install the quality management software application and associated server components on the identified production server(s)._
* _Configure server and database components in accordance with vendor specifications._
* _Apply the purchased machine‑specific license(s) associated with this deployment._

_Subtask 5.2.3 – Security and Connectivity Configuration_

* _Assist with configuration of required secure socket layer (SSL) capabilities on the quality management servers, using an SSL certificate provided by the VA Medical Center – Overland Park, if applicable._
* _Assist with Windows firewall configuration on the quality management server(s) or associated hardware as required for proper operation._

_Deliverables (Task 2):_

* _Installed and configured production software environment._
* _Installation validation checklist documenting server readiness and software installation completion._

_5.3 Task 3 – Machine Configuration and Verification_

_Following installation, the contractor shall configure the software system for the Medical Center’s treatment machines (linear accelerators) and perform verification testing._

_Subtask 5.3.1 – Machine Configuration_

* _Use machine‑specific information provided by the Medical Center to configure each treatment machine within the system._
* _Establish connectivity with devices and imaging/QA equipment as applicable._

_Subtask 5.3.2 – Machine Verification_

* _For each machine, perform verification testing of connectivity and data transfer, requiring approximately 30 minutes per machine with physics support from Medical Center staff._
* _Confirm that the system is technically functioning and receiving data from each machine as expected._

_Deliverables (Task 3):_

* _Completed machine configuration for each designated treatment machine._
* _Machine verification record for each configured machine._
* _Technical sign‑off form submitted to Medical Center key stakeholder for signature._

_5.4 Task 4 – Interface with Oncology Information System (OIS)_

_The contractor shall assist with establishing remote connection between the quality management system and the existing oncology information system instance used by the VA Medical Center – Overland Park._

_Subtask 5.4.1 – OIS Connectivity_

* _Collaborate with Medical Center staff and the OIS vendor, as required, to configure and test storage and query/retrieve of studies between systems._
* _Confirm that a single OIS instance is configured to communicate with the quality management system._

_Deliverables (Task 4):_

* _Documented interface configuration parameters._
* _OIS connectivity test results._

_5.5 Task 5 – Clinical Application Education_

_The contractor shall provide remote and/or on‑site education services to support clinical use of the quality management system. The Medical Center has purchased six education units, where one unit equals a four‑hour remote instructor‑led session, with a minimum of two days (six units) required to schedule an on‑site event._

_Subtask 5.5.1 – Education Planning and Preparation_

* _Conduct a remote training preparation session to ensure required files, calibrations, and readiness tasks are complete prior to formal training._
* _Develop and share training agendas with Medical Center staff._

_Subtask 5.5.2 – Product Training_

* _Deliver remote and/or on‑site training tailored to the Medical Center’s workflows, focusing on routine imaging QA, machine QA, and patient‑related QA modules as applicable._
* _Provide hands‑on instruction for clinical users, focusing on system navigation, data review, reporting, and decision‑making workflows._

_Deliverables (Task 5):_

* _Training agendas and schedule._
* _Completion record of training sessions, including participant lists and topics covered._

_5.6 Task 6 – Adoption Support and Clinical Go‑Live_

_The contractor shall support the Medical Center’s adoption of the system through a defined post‑training period, culminating in clinical go‑live._

_Subtask 5.6.1 – Adoption Planning_

* _Collaborate with the Medical Center clinical lead to define an adoption plan for each system module deployed, including timelines and acceptance criteria._

_Subtask 5.6.2 – Remote Adoption Support_

* _Provide a designated resource to offer remote support for a defined period (typically one to three months per module, or until go‑live, whichever is sooner)._
* _Assist with clinical acceptance testing, including agreed‑upon test cases and evaluation of system outputs._

_Subtask 5.6.3 – Project Completion and Transition_

* _Facilitate final project status meeting to confirm that all deliverables and milestones have been met._
* _Support completion of the Project Acceptance Form by the Medical Center._
* _Transition ongoing support responsibilities to the vendor’s global support organization or equivalent._

_Deliverables (Task 6):_

* _Adoption plan and acceptance testing documentation._
* _Final project status report._
* _Signed Project Acceptance Form._

_6\. Performance Monitoring_

_The COR will monitor contractor performance through review of deliverables, participation in status meetings, and verification that milestones (installation complete, verification complete, training complete, client testing complete, and clinical go‑live) are achieved in accordance with the agreed project schedule._

_Contractor performance will be considered acceptable when all tasks are completed, the system is operational in the production environment, necessary interfaces and machine configurations are verified, staff training is complete, and the Medical Center has documented acceptance of clinical use._

_7\. Security, Privacy, and Access Requirements_

_Contractor personnel will require remote access to designated servers to perform installation, configuration, and support activities; such access shall be provided in accordance with VA and facility policies. Service accounts created for the system (for example, administrative and database service accounts) must be configured to avoid password expiration or unmanaged changes that would disrupt system operation; changes that impact connectivity may require additional remote support sessions._

_The Medical Center will ensure that applicable VA security, privacy, and information protection requirements are followed, including completion of any required VA forms and background checks, as directed by the Information Security Officer (ISO)._

_8\. Government‑Furnished Equipment (GFE) / Government‑Furnished Information (GFI)_

_The VA Medical Center – Overland Park will provide:_

* _Production server(s) and virtual environment meeting required specifications, connected to the facility LAN/WAN._
* _Access to DICOM source systems, IP network, and security infrastructure necessary for installation and configuration._
* _Relevant configuration documentation (e.g., automation configuration spreadsheet, network configuration details, and machine configuration data)._

_No contractor‑furnished hardware is included in this SOW._

_9\. Other Pertinent Information or Special Considerations_

* _All contractor project management, installation, configuration, verification, training, and adoption assistance activities will be performed remotely unless otherwise specified in this document._
* _The Medical Center will coordinate directly with linear accelerator vendors to install and configure any third‑party licenses and software required for automation (e.g., imaging systems or file synchronization tools)._
* _The Medical Center is responsible for obtaining and providing any required SQL licenses, CALs, or SSL certificates._

_10\. Place of Performance_

_Place of performance is primarily remote, with work performed via secure remote access to the VA Medical Center – Overland Park systems. When on‑site services are scheduled (e.g., on‑site training), work will occur at:_

_VA Medical Center – Overland Park_ 
_10500 Mastin Rd_ 
_Overland Park, KS 66212_

_11\. Period of Performance_

_The period of performance will commence upon issuance of the purchase order and project kick‑off. Deployment activities, including installation, configuration, verification, training, and adoption support, are expected to be completed within approximately four months from project kick‑off, with final duration dependent on project complexity and resource availability. Education and deployment services expire one year from project kick‑off date._

_12\. Delivery Schedule (Key Milestones)_

_SOW Task_

_Deliverable / Milestone_

_Due Date (Calendar Days After CO Start)_

_5.1_

_Project communication plan and schedule_

_Within 14 days of order completion_ 

_5.2_

_Installation complete_

_Within 6 weeks after accurate data confirmed_ 

_5.3–5.4_

_Machine and OIS configuration and verification_

_Within 4 weeks of project kick‑off_ 

_5.5_

_Training complete_

_Within 2 weeks after verification_ 

_5.6_

_Client testing complete and clinical go‑live_

_Duration dependent on module complexity, generally ≤ 90 days_ 

_5.6_

_Final status report and Project Acceptance Form_

_Upon successful clinical go‑live_ 

_Specific dates will be finalized in the project schedule at initiation._

_13\. Change Management_

_Any change to the scope, requirements, technical components, schedule, or costs described in this SOW shall require a formal, written change request. The change request shall describe the requested change, identify required actions to execute the change, estimate impacts to schedule and cost, and include signatures/approvals from both parties before implementation._

_STATEMENT OF WORK_

  
_SOW as of: 6/3/2026_

_2\. Contract Title_

_Radiation Therapy Quality Management System Deployment and Training._

_3\. Background_

_The VA Medical Center – Overland Park requires a comprehensive software system to support quality assurance for radiotherapy treatment delivery and associated treatment machines. This effort will enable the facility to improve patient safety by verifying that radiotherapy treatment machines operate within defined tolerances and by supporting routine and patient‑specific quality assurance workflows._

_The work described in this SOW covers the initial deployment, configuration, and clinical adoption support for a new quality management software system for linear accelerators and related oncology information systems. It includes remote installation, configuration, verification, training, and adoption support necessary to achieve clinical “go‑live” at the VA Medical Center – Overland Park._

_4\. Scope_

_The scope of this SOW includes all contractor activities necessary to deploy the radiation therapy quality management software system in the VA Medical Center – Overland Park production environment, configure it for use with existing treatment machines and oncology information systems, verify correct operation, train clinical and technical staff, and support adoption through initial clinical use._

_The work will be performed primarily via remote services, with coordination among Medical Center project leadership, information technology staff, and clinical staff. The scope is limited to the Medical Center’s production data center and associated radiotherapy equipment and does not extend to other facilities or systems beyond those explicitly identified herein._

_5\. Specific Tasks_

_5.1 Task 1 – Project Management and Initiation_

_The contractor shall provide project management services to plan, coordinate, and oversee all deployment activities. This includes identification of key project personnel (Executive Sponsor, Project Manager, IT Lead, and Clinical Lead), development of a communication plan, and coordination of all dependencies required to initiate the project._

_Subtask 5.1.1 – Project Initiation_

* _Confirm and review all aspects of the order and associated deliverables._
* _Discuss preliminary dependencies such as server readiness, virtual environment requirements, linear accelerator prerequisites, and any required beam modeling activities._
* _Identify project goals, objectives, and additional stakeholders._
* _Establish the communication plan (methods, types, style, and schedule of status updates and meetings)._

_Deliverables (Task 1):_

* _Project communication plan._
* _Initial project schedule and milestone list._

_5.2 Task 2 – System Installation and Environment Configuration_

_The contractor shall perform remote installation of the quality management software system to the latest approved version on the Medical Center’s designated production server(s) in a new virtual environment._

_Subtask 5.2.1 – Pre‑Installation Validation_

* _Validate that the production server(s) meet required CPU, RAM, storage, and graphics specifications._
* _Verify network attachment, connectivity, and performance levels necessary to support expected user experience._
* _Confirm availability of necessary software licenses for installation._

_Subtask 5.2.2 – Software Installation_

* _Install the quality management software application and associated server components on the identified production server(s)._
* _Configure server and database components in accordance with vendor specifications._
* _Apply the purchased machine‑specific license(s) associated with this deployment._

_Subtask 5.2.3 – Security and Connectivity Configuration_

* _Assist with configuration of required secure socket layer (SSL) capabilities on the quality management servers, using an SSL certificate provided by the VA Medical Center – Overland Park, if applicable._
* _Assist with Windows firewall configuration on the qualit_

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e89db65da1544f918fc757ff5fcc947b/download)

## Contacts

* Jon Lutmer

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/4b6a1452f85045d5a3396a90dcebf2cb/view)

[More from United States Department of Veterans Affairs posted in August 2026](/department%5Fof%5Fveterans%5Faffairs/archive/2026-08)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Radiation Therapy Quality Management System Deployment and Training","description":"STATEMENT OF WORK SOW as of: 6/3/2026 2. Contract Title Radiation Therapy Quality Management System Deployment and Training. 3. Background The VA Medical Center – Overland Park requires a comprehensive software system to support quality assurance for radiotherapy treatment delivery and associated treatment machines. This effort will enable the facility to improve patient safety by verifying that radiotherapy treatment machines operate within defined tolerances and by supporting routine and patient‑specific quality assurance workflows. The work described in this SOW covers the initial deployment, configuration, and clinical adoption support for a new quality management software system for linear accelerators and related oncology information systems. It includes remote installation, configuration, verification, training, and adoption support necessary to achieve clinical “go‑live” at the VA Medical Center – Overland Park. 4. Scope The scope of this SOW includes all contractor activities necessary to deploy the radiation therapy quality management software system in the VA Medical Center – Overland Park production environment, configure it for use with existing treatment machines and oncology information systems, verify correct operation, train clinical and technical staff, and support adoption through initial clinical use. The work will be performed primarily via remote services, with coordination among Medical Center project leadership, information technology staff, and clinical staff. The scope is limited to the Medical Center’s production data center and associated radiotherapy equipment and does not extend to other facilities or systems beyond those explicitly identified herein. 5. Specific Tasks 5.1 Task 1 – Project Management and Initiation The contractor shall provide project management services to plan, coordinate, and oversee all deployment activities. This includes identification of key project personnel (Executive Sponsor, Project Manager, IT Lead, and Clinical Lead), development of a communication plan, and coordination of all dependencies required to initiate the project. Subtask 5.1.1 – Project Initiation Confirm and review all aspects of the order and associated deliverables. Discuss preliminary dependencies such as server readiness, virtual environment requirements, linear accelerator prerequisites, and any required beam modeling activities. Identify project goals, objectives, and additional stakeholders. Establish the communication plan (methods, types, style, and schedule of status updates and meetings). Deliverables (Task 1): Project communication plan. Initial project schedule and milestone list. 5.2 Task 2 – System Installation and Environment Configuration The contractor shall perform remote installation of the quality management software system to the latest approved version on the Medical Center’s designated production server(s) in a new virtual environment. Subtask 5.2.1 – Pre‑Installation Validation Validate that the production server(s) meet required CPU, RAM, storage, and graphics specifications. Verify network attachment, connectivity, and performance levels necessary to support expected user experience. Confirm availability of necessary software licenses for installation. Subtask 5.2.2 – Software Installation Install the quality management software application and associated server components on the identified production server(s). Configure server and database components in accordance with vendor specifications. Apply the purchased machine‑specific license(s) associated with this deployment. Subtask 5.2.3 – Security and Connectivity Configuration Assist with configuration of required secure socket layer (SSL) capabilities on the quality management servers, using an SSL certificate provided by the VA Medical Center – Overland Park, if applicable. Assist with Windows firewall configuration on the quality management server(s) or associated hardware as required for proper operation. Deliverables (Task 2): Installed and configured production software environment. Installation validation checklist documenting server readiness and software installation completion. 5.3 Task 3 – Machine Configuration and Verification Following installation, the contractor shall configure the software system for the Medical Center’s treatment machines (linear accelerators) and perform verification testing. Subtask 5.3.1 – Machine Configuration Use machine‑specific information provided by the Medical Center to configure each treatment machine within the system. Establish connectivity with devices and imaging/QA equipment as applicable. Subtask 5.3.2 – Machine Verification For each machine, perform verification testing of connectivity and data transfer, requiring approximately 30 minutes per machine with physics support from Medical Center staff. Confirm that the system is technically functioning and receiving data from each machine as expected. Deliverables (Task 3): Completed machine configuration for...","url":"https://matchawards.com/department_of_veterans_affairs/posts/117032845991158165","identifier":"36C25526Q0570","category":"332510 - Hardware Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"5975 - ELECTRICAL HARDWARE AND SUPPLIES"}],"availabilityStarts":"2026-08-03","availabilityEnds":"2026-08-10","validThrough":"2026-08-10T23:59:59-04:00","areaServed":"Kansas City, Missouri 64128, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/4b6a1452f85045d5a3396a90dcebf2cb/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

