<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/116960410846809286" -->

---
title: J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS -… (36C24226Q0816) | Closed - MatchAwards
description: J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS. United States Department of Veterans Affairs. Solicitation 36C24226Q0816. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Total small business set-aside. Deadline 2026-08-28. Provide the services of a mechanical...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/116960410846809286
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS -… (36C24226Q0816) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/116960410846809286
og:description: J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS. United States Department of Veterans Affairs. Solicitation 36C24226Q0816. NAICS 238220 - Plumbing, Heating, and Air-Conditioning Contractors. Total small business set-aside. Deadline 2026-08-28. Provide the services of a mechanical...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS

Status

Closed, the response deadline passed on Aug 28, 2026

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

ALBANY, USA

Notice type

Presolicitation

Solicitation number

36C24226Q0816

NAICS

[238220 - Plumbing, Heating, and Air-Conditioning Contractors](/groups/228)

PSC

J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2026-08-26

Deadline

2026-08-28

Place of performance

Montrose, New York 10548-1454, UNITED STATES

## Description

Provide the services of a mechanical contractor to replace in kind one (1) existing Webster burner assembly on Boiler #2 in the Boiler Plant (Building 20) at the VA Hudson Valley Healthcare System Montrose Campus. The Scope of Work also includes the replacement of the existing burner train field devices for both gas and oil and the replacement of existing field devices in the front of the boiler. All replacement of the field devices must be in kind. Replace burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Other repairs required are listed below. All work shall be performed in accordance with attached VA specifications, VA Design Manual, and VA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition. Background: Boiler # 2 is a Victory Energy, D-type Water-tube boiler rated at 30,000 lb/hr steam (approximately 37.5MMBtu/h input). The boiler was originally installed in 2011 with a Webster model HDSXC-105C-9V-750 Burner. The Micro-Mod Parallel Positioning (Metering) Combustion Controls were installed in a separate project, in 2019\. The burner is equipped for Natural Gas Firing, as well as Number 2 Fuel Oil with the option for either compressed air or steam atomization. The back-up (Propane) pilot system is via a small (portable) bottle, connected by a temporary hose- when needed. The Burner Flame Safeguard system is a Fireye YB110, with a Fireye YZ300 Expanded Annunciation Module and a Fireye 45UV5 Scanner- all original to the 2011 project. Item #1 Replace Boiler #2 Burner Assembly and Controls - The existing Webster Burner for Boiler #2 is damaged from a fire side explosion and shall be replaced in kind as listed as the same model identified in the above background (Webster model HDSXC-105C-9V-750 Burner). All existing burner fuel train field devices (for both gas and fuel oil) located downstream of their associated isolation valve shall be replaced in kind. All burner atomization field devices located downstream of associated isolation valve shall also be replaced in kind. Replace the burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Replace all existing field devices for combustion air in kind (See Attachment D - List of field devices to be replaced). All existing field devices being replaced shall be handed over to the VA for spare parts. The existing MICROMOD and Fireye controls systems shall remain. a.) The contractor shall inspect the existing burner, field devices, and control systems serving Boiler #2 including all wiring and integrations points. Document current operational parameters and deficiencies. The VA shall provide the contractor with the as-built wiring diagrams of the existing MICRO MOD Burner Management System. Contractor shall field verify information from as-built documentation in the field and notify the VA COR of any discrepancies. b.) Provide submittals of all equipment, field devices, and materials to be installed under contract for VA review and approval. c.) Delivery Upon approval of submittals, Contractor shall order and then deliver the replacement equipment and material to site. d.) Removal - Once the replacement burner is delivered to site, the contractor shall safely disconnect and remove the existing burner, field devices, associated wiring, and fuel connections. Contractor shall hand over existing equipment and field devices to VA who will use equipment for spare parts. e.) Installation and Integration Contractor shall set the replacement burner and field devices in place and make all necessary connections to the existing Victory boiler and existing MicroMod system as well as all electrical and utility connections. Make connections to fuel supply, electrical systems, and control panels. Integrate new controls with existing boiler hardware. f.) Start Up - Contractor shall start up replacement burner. g.) Testing & Commissioning a. Once boiler is refilled, Contractor shall perform a hydrostatic test to ensure that there are no potential tube leaks on Boiler 2\. b. Contractor shall calibrate all gauges and transmitters and test for proper operation on Boiler #2\. Submit all test reports to VA COR c. Perform operational tests, combustion analysis, and adjustment to ensure optimal performance. Submit a completed Combustion Test Report showing the results from the combustion test. Use the attached Combustion Test Report, Attachment C. d. For controls, program control logic for optimal efficiency and safety. Conduct functional and safety tests, including failover and alarms systems. Submit all test reports to VA COR e. Contractor shall test all safety devices and tune the combustion on Boiler 2 using the testing methods specified in the VHA Boiler and Associated Safety Device Testing Manual, Eighth Edition (See Attachment A). Submit the completed test reports from the Safety Device Testing Manual to the VA COR. h.) Training Provide basic operational and maintenance training to VA staff i.) Deliverables - Contractor shall provide all manuals and warranty documentation, test and commissioning reports, operator training completion certificates. j.) Standards and Compliance All work must comply with applicable local, state, and federal codes, as well as manufacturer s specifications and safety regulations. Acceptance Criteria The project will be considered complete when Boiler 2 with its replacement burner operates in accordance with manufacturer s specifications and testing requirements, passes all VA performance and safety inspections, and documentation is delivered to the VA. VA performance and safety inspections shall be considered passed when Boiler #2 with its replacement burner successfully passes the tests mentioned in this Statement of Work (SOW) and all tests outlined in the VHA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition and all fully completed test reports, as described in this SOW and the Safety Device Testing manual, is submitted to the VA. OTHER REPAIR SERVICES TO BE PERFORMED UNDER THIS CONTRACT The scheduling and completion of work items not contingent upon the delivery and installation of the replacement burner for Boiler 2 can be scheduled and performed any time after the issuance of the NTP but must be completed and accepted by the VA prior to the completion date of the contract. Item #2: Replace the damaged refractory in Boiler #2 Replace the refractory around the boiler throat to match existing refractory as installed by boiler manufacturer. Consult with Victory Boiler on their recommended replacement method and design. Provide Victory s recommendation to the VA COR prior to replacement. (NOTE: This work item must be performed prior to the installation of the replacement burner). Item #3: Provide hard piped atomizing train to Burner #2 Current piping configuration on the atomizing train (for steam and air) does not meet VA requirements. Re-pipe both steam and air atomization chains to be in compliance with VA Standard Detail SD235239-04 (See Attachment B). Item #4: Install propane header sized for proper capacity to accommodate all four boilers in the Boiler Plant. Propane is used for fueling each burner s pilot ignition. The existing propane delivery system in the Boiler Plant is inadequate per VA specifications. Contractor shall hire engineering services to evaluate the capacity needed for the Webster burners on all four (4) boilers and to size an alternate pilot propane tank, main header, and branch piping to the Boiler #2 burner. Main header shall have T connection for future installations to burners on Boilers 1, 3, and 4\. The size of the propane tank and main header shall have the capacity to supply four (4) Webster burners in the plant. For bidding purposes, assume that a 200 gallon pad mounted propane tank is needed just outside of the Boiler Plant and a 250 long header of 1 black iron pipe is needed to be hung in front of all four (4) existing boilers. Install black iron branch piping down to Boiler #2 replacement burner per standard detail 235239-04\. Replace (2) existing Low Pressure Gas (LPG) Pilot field devices in kind (Low Pressure Cutoff Switch and LP Safety Solenoid Valve). Provide tee connections on main header for future hard pipe branch piping to other 3 boilers in Boiler Plant. Hydrostatic test new tank and piping per VA specifications. When ready for testing of new burner for Boiler #2, fill tank full with propane. Item #5: Replace Oxygen Sensor on Boiler #2 Contractor shall install one (1) VA furnished sensor on breach of Boiler #2\. Calibrate and test operation with new controls system. Item #6: Hydro blast or mechanically clean internal tubes on Boiler #2 to reduce build up. Item #7: Repaint the exterior of Boiler #2 around the burner casing with high temperature resistant paint. Prep surface of boiler prior to painting. (NOTE: This work item must be performed prior to the installation of the replacement burner). GENERAL REQUIREMENTS . Prior to submission of proposal, all prospective bidders shall make at least one site visit to the Montrose Campus to become familiar with the scope of work and the existing conditions. During this visit, bidders must document all of the field devices on the fuel and atomizing train to be replaced. These devices will be tagged by VA personnel prior to the visit. Coordinate the date and time of the visit with the VA COR. After award, the VA will provide the contractor with the existing floor plans of the Boiler Plant in AUTOCAD and PDF format along with all pertinent information of the existing equipment and controls. All work shall be designed in strict compliance to the VA Boiler Guide and VA specifications. . Contractor shall complete required paperwork to obtain PIV badges for all workers in compliance VA badging policy. . The contractor shall submit submittals of all materials and equipment to be used on the project. All materials and equipment submittals shall be APPROVED prior to purchase of items. . The contractor shall submit a project CPM schedule per VA specs. . Provide four (4) week advance notice to VA COR for planned utility shutdowns required to perform work. . Follow facility s Lock Out Tag Out (LOTO) policy procedures. . Follow facility s Confined Space policy procedures prior to and during work inside of boiler. . All the other existing controls systems in the Boiler Plant serving Boiler s 1, 3, and 4 shall remain and their system functionality shall not become impaired or rendered inoperable in any way due to the actions required under this contract for the duration and the completion of the contract. 

<!-- mobian-agent-ad sponsored="true" id="906815b6-d53f-475f-a0ae-2a2dfd7d360d" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/01c7bea9957f44ad9badca808c5c9274/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/03610e84573a4bcca550c662bb7cc20a/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/05b89df8bf5f46ebacc3656bfc50fc29/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0da1a40abb894a659baac5a3a54c82fa/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2b49745d395645d9abbe27dc2f960df9/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/31eb667bc6da415f933d1248fe6aae1f/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/50701f54eed34733b3fb5008597982ea/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/754b214f1dc241fa8a3b5b13bae97b9c/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7728055039ac4b5280a8f40c8cdf4666/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7f5229bfc3134d06857451ca58c809fc/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82fe0f8811f9435fb09275325dcb6ad2/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8f88011a61e745149a1247ab5b2f6206/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9b4537b9644b4c04be59ccb10b3512ab/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a1bb10bc831b4b8b8ef4545cfe041622/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a249df5464cc4bafaa1ef93a21fcc923/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a5243b2e569b4ffb856eec5743679a30/download)
* [Attachment 17](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb4b1f07ec4e463fb5a04f4957b04417/download)
* [Attachment 18](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c5ab79865a8e45f884dced6deaf8487c/download)
* [Attachment 19](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c66a45e64c064c1e9c0cbec959f64035/download)
* [Attachment 20](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d33c40bca72f44118c616d5018b5b0e4/download)
* [Attachment 21](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e0c03ccc06bb42a5a9208bf3c4e1d3cb/download)
* [Attachment 22](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f25bcf26a477492b8a79052e4f666f43/download)

## Contacts

* Natalie Acevedo, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/b111ecca926c4e65b7b30cfe8d7662ca/view)

[More from United States Department of Veterans Affairs posted in July 2026](/department%5Fof%5Fveterans%5Faffairs/archive/2026-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J045--RFQ - BOILER REPAIR HUDSON VALLEY VAHCS - MONTROSE CAMPUS","description":"Provide the services of a mechanical contractor to replace in kind one (1) existing Webster burner assembly on Boiler #2 in the Boiler Plant (Building 20) at the VA Hudson Valley Healthcare System Montrose Campus. The Scope of Work also includes the replacement of the existing burner train field devices for both gas and oil and the replacement of existing field devices in the front of the boiler. All replacement of the field devices must be in kind. Replace burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Other repairs required are listed below. All work shall be performed in accordance with attached VA specifications, VA Design Manual, and VA Boiler and Associated Plant Safety Device Testing Manual, Eighth Edition. Background: Boiler # 2 is a Victory Energy, D-type Water-tube boiler rated at 30,000 lb/hr steam (approximately 37.5MMBtu/h input). The boiler was originally installed in 2011 with a Webster model HDSXC-105C-9V-750 Burner. The Micro-Mod Parallel Positioning (Metering) Combustion Controls were installed in a separate project, in 2019. The burner is equipped for Natural Gas Firing, as well as Number 2 Fuel Oil with the option for either compressed air or steam atomization. The back-up (Propane) pilot system is via a small (portable) bottle, connected by a temporary hose- when needed. The Burner Flame Safeguard system is a Fireye YB110, with a Fireye YZ300 Expanded Annunciation Module and a Fireye 45UV5 Scanner- all original to the 2011 project. Item #1 Replace Boiler #2 Burner Assembly and Controls - The existing Webster Burner for Boiler #2 is damaged from a fire side explosion and shall be replaced in kind as listed as the same model identified in the above background (Webster model HDSXC-105C-9V-750 Burner). All existing burner fuel train field devices (for both gas and fuel oil) located downstream of their associated isolation valve shall be replaced in kind. All burner atomization field devices located downstream of associated isolation valve shall also be replaced in kind. Replace the burner air intake manifold and all associated ductwork, fittings, filters, alarms, etc. Replace all existing field devices for combustion air in kind (See Attachment D - List of field devices to be replaced). All existing field devices being replaced shall be handed over to the VA for spare parts. The existing MICROMOD and Fireye controls systems shall remain. a.) The contractor shall inspect the existing burner, field devices, and control systems serving Boiler #2 including all wiring and integrations points. Document current operational parameters and deficiencies. The VA shall provide the contractor with the as-built wiring diagrams of the existing MICRO MOD Burner Management System. Contractor shall field verify information from as-built documentation in the field and notify the VA COR of any discrepancies. b.) Provide submittals of all equipment, field devices, and materials to be installed under contract for VA review and approval. c.) Delivery Upon approval of submittals, Contractor shall order and then deliver the replacement equipment and material to site. d.) Removal - Once the replacement burner is delivered to site, the contractor shall safely disconnect and remove the existing burner, field devices, associated wiring, and fuel connections. Contractor shall hand over existing equipment and field devices to VA who will use equipment for spare parts. e.) Installation and Integration Contractor shall set the replacement burner and field devices in place and make all necessary connections to the existing Victory boiler and existing MicroMod system as well as all electrical and utility connections. Make connections to fuel supply, electrical systems, and control panels. Integrate new controls with existing boiler hardware. f.) Start Up - Contractor shall start up replacement burner. g.) Testing \u0026 Commissioning a. Once boiler is refilled, Contractor shall perform a hydrostatic test to ensure that there are no potential tube leaks on Boiler 2. b. Contractor shall calibrate all gauges and transmitters and test for proper operation on Boiler #2. Submit all test reports to VA COR c. Perform operational tests, combustion analysis, and adjustment to ensure optimal performance. Submit a completed Combustion Test Report showing the results from the combustion test. Use the attached Combustion Test Report, Attachment C. d. For controls, program control logic for optimal efficiency and safety. Conduct functional and safety tests, including failover and alarms systems. Submit all test reports to VA COR e. Contractor shall test all safety devices and tune the combustion on Boiler 2 using the testing methods specified in the VHA Boiler and Associated Safety Device Testing Manual, Eighth Edition (See Attachment A). Submit the completed test reports from the Safety Device Testing Manual to the VA COR. h.) Training Provide basic operational and maintenance training to VA staff...","url":"https://matchawards.com/department_of_veterans_affairs/posts/116960410846809286","identifier":"36C24226Q0816","category":"238220 - Plumbing, Heating, and Air-Conditioning Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2026-08-26","availabilityEnds":"2026-08-28","validThrough":"2026-08-28T23:59:59-04:00","areaServed":"Montrose, New York 10548-1454, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/b111ecca926c4e65b7b30cfe8d7662ca/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

