<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/116953570320233754" -->

---
title: Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448 | Closed - MatchAwards
description: Y1DA--656-26-201 Replace Carpet FY26 NRM  36C263-26-AP-2448. United States Department of Veterans Affairs. NAICS 238330 - Flooring Contractors. Deadline 2026-08-20. The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/116953570320233754
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448 | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/116953570320233754
og:description: Y1DA--656-26-201 Replace Carpet FY26 NRM  36C263-26-AP-2448. United States Department of Veterans Affairs. NAICS 238330 - Flooring Contractors. Deadline 2026-08-20. The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Y1DA--656-26-201 Replace Carpet FY26 NRM 36C263-26-AP-2448

Agency

United States Department of Veterans Affairs

Office

Saint Paul, USA

Solicitation number

36C26326B0032

NAICS

238330 - Flooring Contractors

Set-aside

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Posted

2026-08-13

Deadline

2026-08-20

## Description

The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all quantities and conditions prior to installation; any discrepancies must be reported to the COR immediately. No substitutions for specified products without CO approval. Work shall be performed in full accordance with the technical specifications including, but not limited to: Sections 00 01 15, 01 33 23, 01 35 26, 01 45 00, 01 57 19, 01 74 19, 02 41 00, 02 82 13.19, 07 84 00, 09 05 16, 09 65 19, 09 68 00 (demo only), and 09 91 00 (touch-up painting). The Contractor shall execute all work in accordance with the VA provided phasing drawings and written direction, including the sequencing for Buildings 2, 1, 28, and 29\. No deviations from the approved phasing shall occur without written approval from the COR and CO. Each building shall be fully completed before mobilizing to the next, unless otherwise directed in writing. POP: 565 days after NTP

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/158b53a535ae4c7da0483fce0e6efade/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1ba87ba6cbc5409aaa96708aa1196cd8/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25e9a772f9214c348ebc9fce43ce657c/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2641362bb2504daab44cfe1b5f791079/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/346d1a5b211541179ebd38ca7f19763a/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4d23f51888bb4a4d8cfff0a9282f4148/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5bfe753145ce425a8e7049bd75a5ef95/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/601d477a30f84cf7b73ad1e1623ae5ca/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9270666bed724dda8facd481e4569a00/download)
* [Attachment 10](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9f50263d8384422fbb4154fcb7b85e09/download)
* [Attachment 11](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b88eedf13b0b41e4a0672982a181ae95/download)
* [Attachment 12](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/cadc1f0d9fc24c81884333fdeb721696/download)
* [Attachment 13](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dbd5723f00fd41ec8175fe685fb41fc7/download)
* [Attachment 14](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/de2be545eb8340aaa00196a6eeeb4c87/download)
* [Attachment 15](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e14eb3d5adb94df3a2af57ea72210a19/download)
* [Attachment 16](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e1c51b85066d4f05bc96c906c476a180/download)

## Contacts

* Daniel R Dobler, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/f7cb64ef98fb4d04becb27545ae5027e/view)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Y1DA--656-26-201 Replace Carpet FY26 NRM  36C263-26-AP-2448","description":"The Contractor shall furnish all labor, materials, tools, and equipment necessary to remove existing flooring and install new resilient flooring and base in occupied healthcare facilities with minimal disruption, improving durability, infection control, safety, and maintainability. Work shall comply with FAR, VAAR, VA, ICRA standards, and SCVAHCS requirements. Contractor shall field-verify all quantities and conditions prior to installation; any discrepancies must be reported to the COR immediately. No substitutions for specified products without CO approval. Work shall be performed in full accordance with the technical specifications including, but not limited to: Sections 00 01 15, 01 33 23, 01 35 26, 01 45 00, 01 57 19, 01 74 19, 02 41 00, 02 82 13.19, 07 84 00, 09 05 16, 09 65 19, 09 68 00 (demo only), and 09 91 00 (touch-up painting). The Contractor shall execute all work in accordance with the VA provided phasing drawings and written direction, including the sequencing for Buildings 2, 1, 28, and 29. No deviations from the approved phasing shall occur without written approval from the COR and CO. Each building shall be fully completed before mobilizing to the next, unless otherwise directed in writing. POP: 565 days after NTP","url":"https://matchawards.com/department_of_veterans_affairs/posts/116953570320233754","identifier":"36C26326B0032","category":"238330 - Flooring Contractors","availabilityStarts":"2026-08-13","availabilityEnds":"2026-08-20","sameAs":"https://sam.gov/workspace/contract/opp/f7cb64ef98fb4d04becb27545ae5027e/view"}
```

