<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/116926679192671103" -->

---
title: Z1DZ--Building 5 & 60 Door Replacements at VAMC… (36C24126Q0652) | Closed - MatchAwards
description: Z1DZ--Building 5 & 60 Door Replacements at VAMC Central Western MA. United States Department of Veterans Affairs. Solicitation 36C24126Q0652. NAICS 238290 - Other Building Equipment Contractors. SDVOSB set-aside. Deadline 2026-09-08. This is a combined synopsis/solicitation for commercial...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/116926679192671103
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Z1DZ--Building 5 & 60 Door Replacements at VAMC… (36C24126Q0652) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/116926679192671103
og:description: Z1DZ--Building 5 & 60 Door Replacements at VAMC Central Western MA. United States Department of Veterans Affairs. Solicitation 36C24126Q0652. NAICS 238290 - Other Building Equipment Contractors. SDVOSB set-aside. Deadline 2026-09-08. This is a combined synopsis/solicitation for commercial...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Z1DZ--Building 5 & 60 Door Replacements at VAMC Central Western MA

Status

Closed, the response deadline passed on Sep 8, 2026

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

TOGUS, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

36C24126Q0652

NAICS

[238290 - Other Building Equipment Contractors](/groups/229)

PSC

Z1DZ - MAINTENANCE OF OTHER HOSPITAL BUILDINGS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)](/contracts/veteran-owned)

Posted

2026-08-28

Deadline

2026-09-08

Place of performance

Leeds, MA 01053, UNITED STATES

## Description

This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR 12.603, as supplemented by the current Federal Acquisition Circular (FAC 2026 01) and the Department of Veterans Affairs Acquisition Regulation (VAAR). This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This acquisition is 100% set aside for verified SDVOSBs in accordance with VAAR 852.219 73\. Offerors must be listed as Verified in the SBA Veteran Small Business Certification (VetCert) database both at the time of quote submission and at the time of award. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22.0 million. The PSC is Z1DZ. The Department of Veteran Affairs (VA) Central Western Massachusetts Medical Center located at 421 North Main St. in Leeds, MA 01053 is seeking to purchase services for the replacement of Building 5 Automatic Doors and Building 60 Entry Doors as outlined in the Performance Work Statement: Performance Work Statement 1 Overview General The Contractor provide professional services to include all labor, transportation, materials, apparatus, tools, equipment and permits necessary to in accordance with this design scope of work. All work must meet VHA, OSHA, EPA, and Mass DEP standards. Project Specific Scope of Work - Building 5 Automatic Doors and Building 60 Entry Doors Work consists of procuring and replacing all components, Doors, lockset, door closers, door sensors, etc. (6) doors , (5) Door Closers (2) Door Sensors for entry. The Period of Performance for this project is 90 calendar days. General Scope Items The following is a list of general scope considerations: Meet with VA Facilities staff, review existing drawings and estimates, and perform fieldwork necessary to determine required materials and equipment. All field work shall be scheduled at least 72 hours in advance with VA Facilities Management. The site shall be left clean of all construction debris and hazardous materials. Coordinate with VA CWM HCS GEMS coordinator Rob Michalik at 413-584-4040 22330 Design and installation to meet the most stringent of latest edition of the NEC and NFPA. Submit product data and shop drawings for all materials prior to installation.Â Submittals and shop drawings shall be approved by COR. Contractors shall supply all tools, parts, labor, travelÂ and equipment to performÂ theÂ removal,Â disposalÂ of all old equipment and installation of all the new equipment.Â All proper LOTO devices andÂ procedures are to be implemented.Â Contractors will keep and maintain a clean and neat work area. Any damage to ceilingÂ tiles, walls or flooring will be fixed byÂ the contractor.Â All work shall be performed in accordance with Massachusetts DEP and DLS regulations and OSHA codes. Specific Scope Items: Building 5\. 1-8; Building 60\. 9-19 Disconnect Power to Door Closers and Door Sensors and LOTO Remove Door Closers and Dispose of Correctly Remove Door Sensors and Dispose of Correctly Remove Existing Lock Sets and turn into the COR Remove and Dispose Door Hinges and Double Doors Install New Roll Up Door to fit within space Install New (2) Buttons Open/Close and connected to door to ensure when activated doors will open and close. To be installed on the Interior/Exterior of where door is located. Install Key Switch to the interior button to turn the system on and off. Key Switch Must be IC Core capability Remove 4 Doors and Dispose of correctly Remove Door Closers and Return to COR Remove Frame and Arch of Existing Front Door Install New Arch with Glass and New Frame Install New Front Door (Aluminum Frame and Glass) With a fixed sidelight Install Door Closers for Front Door Install Handicap Button for Front door Install New Glass Panel Door on West Side Install New Door Closer on West Side and a New handicap button Install New Glass Panel Door on East Side Install New Door Closer on East side and a new handicap Button . Test and Provide Report of Proper Functionality to COR. Test should be coordinated a minimum of 72 hours in advance with COR so that person can be present along with any other necessary VA Stakeholders Site Access and Management Requirements The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the project. The contractor must have the following additional requirements before working on site: Contractor badge must be obtained and visibly worn by contractor or representative at all times while on campus Parking is restricted to the lower lots (N and P). One vehicle will be allowed to park behind Building 12 L lot in an employee authorized spot. These requirements are applicable to all contractor employees and subcontractors working in and around campus building unless stated otherwise by COR. The contractor is ultimately responsible for the behavior of employees and subcontractors. Questions or concerns may be addressed by the COR. List of Documents The following list of documents can be provided for Contractor use and incorporation into the project documents: Sample Forms Material Submittal Form RFI Form Infection Control Risk Assessment (ICRA) and Permit VA CWM Utility Shutdown Form Construction Safety Guidebook | Healthcare Environment and Facilities Programs (va.gov) All on-site work (including cleanup) shall take place during the following times, unless otherwise approved by the COR: 07:30-15:15h Monday through Friday Except the following: Noisy work 70Db and above inside the building Off Hours M-F 1700-0600 or Weekends. Excessively Noisy exterior work Off Hours M-F 1700-0600 or Weekends. Work on Federal Holidays requires permission from the COR except Memorial Day and Veterans Day. Work Location and Restrictions The work site location is at the Edward P. Boland Campus- VA Central Western Massachusetts Healthcare System. The contract work is intended to be limited to Building 5 Pine Building and Building 60 Chapel. When the contractor s work interferes with hospital functions, such as when work produces excessive noise, odors, dust, utility service interruptions, or other interferences with normal hospital operations that cannot be contained within the area of work, the contractor shall schedule said work at other than normal hours and as directed by the COR. Project Safety Contractor shall comply with the VA Construction Safety Guidebook as well as all OSHA requirements. Exterior work areas shall be fenced with temporary fence. Interior work areas must maintain ICRA barriers which shall not impede patient through traffic. Priority Door Replacement for Building 60 is as follows ; 1.) East Door , 2.)West Door, 3.) Front Door so there is safe egress for patients Entering and Exiting the building. FAR Clause 52.236-13 subparagraph (f) is invoked: (f) Before Commencing the work, the Contractor shall- (1) Submit a proposed written plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards: and (2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program. \[56 FR 55376, Oct. 25, 1991\] Penetrations of Fire and Smoke Barriers Prior to any installation of equipment, cables, power connections, conduit, piping or other work that penetrates a smoke or fire barrier, all such work must be approved by the site-specific Facilities Management Service (FMS) via the COR.Â An above ceiling/penetration permit must be secured from FMS prior to disturbing the integrity of the barrier.Â The permit must be available for inspection at the project location.Â After the work is completed, the penetration must be repaired (sealed) according to accepted practice and utilizing materials (including UL/FM-listed through penetration fire stopping materials) that meet the original barrier construction requirements in order to restore the designed specifications for smoke and fire compartmentalization.Â Upon completion of any penetration repair, a visual inspection for approval must be requested from, and completed by FMS. Interim Life Safety Protection Measures Contractors shall participate with the VA in the preparation of an interim life safety measures and fire protection Plan that will be implemented during construction of this project. At a minimum, contractor shall comply with the following requirements of an interim life safety measures and fire protection plan: Ensure exits provide free and unobstructed egress for all building occupants. If required by contractor s operations, establish and mark alternate means of egress for all building occupants. Contractors shall always maintain escape facilities from the work area for construction workers. Means of egress in construction areas will be inspected daily. Ensure free and unobstructed access to all areas of the project site for emergency services and for emergency forces. Do not impair means of egress, automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch in accordance with NFPA standards for impairment. Request approval of impairments from the COR in writing a minimum of 72 hours in advance. When required, a fire watch shall be provided by a qualified person by the contractor who shall maintain constant observation of the affected area and have no other duties. The person providing the fire watch shall be trained in fire prevention and in the use of fire extinguishers, occupant hose lines, occupant fire protection system, in sounding the building fire alarm and in notifying the local fire department, and in understanding the particular fire safety situation for the project. Provide written procedures and guidelines for construction personnel and post in the immediate areas of construction detailing what to do and who to call in the event of fire or emergency. Maintain the construction area to minimize the potential for fire or safety hazards resulting from storage of construction material, construction waste and debris during construction operations. All temporary construction shall be built of noncombustible/fire retardant materials and shall be smoke tight. Contractors shall comply with the requirements and ensure efforts to prevent false fire alarms. Parking Parking is rigidly controlled throughout the Medical Center. Contractor parking is only allowed in designated areas (subject to change). Parking in designated patient parking areas is strictly prohibited. Parking on grass is also prohibited. Parking for equipment necessary to perform the work will be authorized in advance of starting the project. Parking is restricted to the lower lots (N and P). One vehicle will be allowed to park behind Building 12 L Lot in an employee authorized spot. Storage of Equipment and Materials The contractor shall arrange with the COR for allocation of required workspace and for the storage of equipment and material to be used for this project.Â Storage space is very limited.Â There are no exclusive areas within the campus that can be given to the contractor for their storage needs.Â Additionally, a contractor trailer is NOT permitted for this project.Â Â The Contractor should schedule delivery of materials to limit the amount of storage space and time. The warehouse CANNOT accept/store deliveries. Debris Removal The Contractor/Installer shall be required to remove waste materials and debris daily (unless otherwise authorized by COR) from the campus. All waste material and debris shall be removed off the site by the contractor and shall be disposed of in accordance with applicable State and Federal regulations. Site Utilities The Contractor/Installer should note this scope of work does not detail all existing structures, utilities, or components that may potentially interfere with the contract work required.Â The contractor shall note any obstruction, utility, or condition that may hinder or interfere with the execution of this contract, and the contractor shall make provisions in their contract price to resolve such interferences and other conditions that may hinder the proper completion of the work.Â All proposed utility relocations, reallocations, and shutdowns shall be approved by the COR prior to commencing such work.Â The contractor shall verify all existing utility installations and take appropriate action prior to working around any potential utility installation. In the event a shutdown, restriction, or interruption of any utility services is required, a written request must be submitted (at least 14 calendar days in advance) and approved by the VA COR.Â All utility shutdowns must be reviewed and approved by the VA. Infection Control All work shall be performed in accordance with the Construction Specifications for Infection Control of the Edward P Boland VA Medical Center.Â For purposes of this project, the work shall be accomplished using the controls indicated in the specifications and on the Infection Control Construction Permit attached.Â No work will be allowed to proceed until an Infection Control Construction Permit has been completed and signed and all protective measures required by the permit are in place. Material and Workmanship Quality All materials and workmanship shall comply with all codes, standards, and requirements of all Authorities Having Jurisdiction (AHJ). All work shall be done in accordance with contract terms and conditions and in a professional manner according to the best trade practices and to the satisfaction of the COR. This includes work performed by subcontractors. \*\*\*\*\*\*\*\*\*\*\*\*\*\*\*\* End PWS \*\*\*\*\*\*\*\*\*\*\*\*\*\*\*\* The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (DEVIATION AUG 2025) FAR 52.212-2 Evaluation-Commercial Products and Commercial Services \[In accordance with FAR 12.301(c) when the use of evaluation factors is appropriate, the contracting officer may (1) Insert the provision at 52.212-2, Evaluation-Commercial Products and Commercial Services, in solicitations for commercial products or commercial services (see 12.602); or (2) Include a similar provision containing all evaluation factors required by 13.106, subpart 14.2 or subpart 15.3, as an addendum (see 12.302(d)).\] FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required. As prescribed in 852.102(a), insert the following provision: Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008) The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer. Copies of these provisions or clauses are available on the Internet at the Web sites provided in the provision at FAR 52.252-1, Solicitation Provisions Incorporated by Reference, or the clause at FAR 52.252-2, Clauses Incorporated by Reference. Copies may also be obtained from the contracting officer. \[Contracting officer shall list all FAR and 48 CFR Chapter 8 (VAAR) provisions and clauses incorporated by reference that must be completed by the offeror or prospective contractor and submitted with the quotation or offer.\] (End of provision) 852.219-76 VA Notice of Limitations on Subcontracting Certificate of Compliance for Supplies and Products (JAN 2023) (DEVIATION) As prescribed in 819.7011(c), insert the following clause. The contracting officer shall tailor the clause in paragraph (a)(2)(iii) as appropriate: (iii) The offeror certifies that it will supply the end item of a small business manufacturer, processor, or producer made in the United States, unless a waiver as provided in 13 CFR 121.406(b)(5) has been issued by SBA. Certification I hereby certify that if awarded the contract, \[insert name of offeror\] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of \[insert name of offeror\]. Printed Name of Signee: Printed Title of Signee: Signature: Date: Company Name and Address: (End of clause) Parent topic:Â Subpart 852.2 - Text of Provisions and Clauses 6\. FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (a) Definitions. As used in this clause Program participation means membership or participation in, or access or admission to training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor. Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources. (b) In connection with the performance of work under this contract, the Contractor agrees as follows: (1) The Contractor will not engage in any racially discriminatory DEI activities; (2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause; (3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts; (4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and (5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause. (6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4). (c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States. (End of clause) 52.252-2 Clauses Incorporated by Reference (FEB 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far. The following contract clauses apply to this acquisition: 52.203-11 C and D Regarding Payments to Influence Certain Federal Transactions. (SEP 2024) 52.203-18 Prohibition on Contracting with Entities (JAN 2018) 52.204-7 System for Award Manageme 

<!-- mobian-agent-ad sponsored="true" id="ebcec413-b141-4bab-b6ed-34c31fe76240" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0f555291120c4678b0a1ea79ae2c9e24/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2903d27968b74a898a7b05317223d1a8/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/33ac8098c3b04e49a481678a7dff6a6c/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/437aee05fbe540b496c6bf2f7eff97a8/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/44b03ba5e04e48adb11b5b2a178de919/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66b45ca924954e04a73054b54dae2716/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a1215c142a4a416a83f0a0ae371ec930/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e3f11e784e6d40009732bf38d053eb6c/download)

## Contacts

* Juliette Buchanan, Contract Specialist

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/30efa0b095e143098debccd49354c984/view)

[More from United States Department of Veterans Affairs posted in July 2026](/department%5Fof%5Fveterans%5Faffairs/archive/2026-07)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Veteran-Owned Small Business Set-Aside Contracts (SDVOSB and VOSB) Available Now](/contracts/veteran-owned)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Z1DZ--Building 5 \u0026 60 Door Replacements at VAMC Central Western MA","description":"This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in FAR 12.603, as supplemented by the current Federal Acquisition Circular (FAC 2026 01) and the Department of Veterans Affairs Acquisition Regulation (VAAR). This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This acquisition is 100% set aside for verified SDVOSBs in accordance with VAAR 852.219 73. Offerors must be listed as Verified in the SBA Veteran Small Business Certification (VetCert) database both at the time of quote submission and at the time of award. The associated North American Industrial Classification System (NAICS) code for this procurement is 238290, with a small business size standard of $22.0 million. The PSC is Z1DZ. The Department of Veteran Affairs (VA) Central Western Massachusetts Medical Center located at 421 North Main St. in Leeds, MA 01053 is seeking to purchase services for the replacement of Building 5 Automatic Doors and Building 60 Entry Doors as outlined in the Performance Work Statement: Performance Work Statement 1 Overview General The Contractor provide professional services to include all labor, transportation, materials, apparatus, tools, equipment and permits necessary to in accordance with this design scope of work. All work must meet VHA, OSHA, EPA, and Mass DEP standards. Project Specific Scope of Work - Building 5 Automatic Doors and Building 60 Entry Doors Work consists of procuring and replacing all components, Doors, lockset, door closers, door sensors, etc. (6) doors , (5) Door Closers (2) Door Sensors for entry. The Period of Performance for this project is 90 calendar days. General Scope Items The following is a list of general scope considerations: Meet with VA Facilities staff, review existing drawings and estimates, and perform fieldwork necessary to determine required materials and equipment. All field work shall be scheduled at least 72 hours in advance with VA Facilities Management. The site shall be left clean of all construction debris and hazardous materials. Coordinate with VA CWM HCS GEMS coordinator Rob Michalik at 413-584-4040 22330 Design and installation to meet the most stringent of latest edition of the NEC and NFPA. Submit product data and shop drawings for all materials prior to installation.Â Submittals and shop drawings shall be approved by COR. Contractors shall supply all tools, parts, labor, travelÂ and equipment to performÂ theÂ removal,Â disposalÂ of all old equipment and installation of all the new equipment.Â All proper LOTO devices andÂ procedures are to be implemented.Â Contractors will keep and maintain a clean and neat work area. Any damage to ceilingÂ tiles, walls or flooring will be fixed byÂ the contractor.Â All work shall be performed in accordance with Massachusetts DEP and DLS regulations and OSHA codes. Specific Scope Items: Building 5. 1-8; Building 60. 9-19 Disconnect Power to Door Closers and Door Sensors and LOTO Remove Door Closers and Dispose of Correctly Remove Door Sensors and Dispose of Correctly Remove Existing Lock Sets and turn into the COR Remove and Dispose Door Hinges and Double Doors Install New Roll Up Door to fit within space Install New (2) Buttons Open/Close and connected to door to ensure when activated doors will open and close. To be installed on the Interior/Exterior of where door is located. Install Key Switch to the interior button to turn the system on and off. Key Switch Must be IC Core capability Remove 4 Doors and Dispose of correctly Remove Door Closers and Return to COR Remove Frame and Arch of Existing Front Door Install New Arch with Glass and New Frame Install New Front Door (Aluminum Frame and Glass) With a fixed sidelight Install Door Closers for Front Door Install Handicap Button for Front door Install New Glass Panel Door on West Side Install New Door Closer on West Side and a New handicap button Install New Glass Panel Door on East Side Install New Door Closer on East side and a new handicap Button . Test and Provide Report of Proper Functionality to COR. Test should be coordinated a minimum of 72 hours in advance with COR so that person can be present along with any other necessary VA Stakeholders Site Access and Management Requirements The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the project. The contractor must have the following additional requirements before working on site: Contractor badge must be obtained and visibly worn by contractor or representative at all times while on campus Parking is restricted to the lower lots (N and P). One vehicle will be allowed to park behind Building 12 L lot in an employee authorized spot. These requirements are applicable to all contractor employees and subcontractors working in and around campus building unless stated...","url":"https://matchawards.com/department_of_veterans_affairs/posts/116926679192671103","identifier":"36C24126Q0652","category":"238290 - Other Building Equipment Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1DZ - MAINTENANCE OF OTHER HOSPITAL BUILDINGS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2026-08-28","availabilityEnds":"2026-09-08","validThrough":"2026-09-08T23:59:59-04:00","areaServed":"Leeds, MA 01053, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/30efa0b095e143098debccd49354c984/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Veteran-owned","item":"https://matchawards.com/contracts/veteran-owned"}]}
```

