<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/department_of_veterans_affairs/posts/116727554514497350" -->

---
title: J061--541 Electrical Power Distribution… (36C25026Q0634) | Closed - MatchAwards
description: J061--541 Electrical Power Distribution Equipment Testing,   Inspection, and Maintenance (VA-27-00000997) - VAMC  Cleveland. United States Department of Veterans Affairs. Solicitation 36C25026Q0634. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline...
canonical: https://matchawards.com/department_of_veterans_affairs/posts/116727554514497350
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: J061--541 Electrical Power Distribution… (36C25026Q0634) | Closed
og:url: https://matchawards.com/department_of_veterans_affairs/posts/116727554514497350
og:description: J061--541 Electrical Power Distribution Equipment Testing,   Inspection, and Maintenance (VA-27-00000997) - VAMC  Cleveland. United States Department of Veterans Affairs. Solicitation 36C25026Q0634. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Deadline...
og:image: https://matchawards.com/system/accounts/avatars/000/000/015/original/f59915e906ee2b19.png?1638825904
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland

Status

Closed, the response deadline passed on Jun 17, 2026

Agency

[United States Department of Veterans Affairs](/department%5Fof%5Fveterans%5Faffairs)

Office

DAYTON, USA

Notice type

Sources Sought

Solicitation number

36C25026Q0634

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT

Posted

2026-06-10

Deadline

2026-06-17

Place of performance

Cleveland, Ohio 44106-1702, UNITED STATES

## Description

Page 3 of 3 This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance. VAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance STATEMENT OF WORK (SOW) as of 3/7/2026 1\. Contracting Officer s Representative (COR). Name: TBD Section: Address: 10701 East Blvd, Cleveland, OH 44106 Phone Number: TBD Fax Number: TBD E-Mail Address: TBD 2\. Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance 3\. Background. Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections. Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s). 4\. Scope. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance as defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract. In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation. All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection. Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW. 5\. Specific Tasks. Onsite testing, inspection, minor repair, and housekeeping. 5.1 Substation and Transformer Maintenance completed tri-annually January May (Testing Period may be adjusted to meet medical center needs) Visually inspect, tighten hardware and torque bolted connections. Manually operate each switch to check operation of auxiliaries and interlocks. Check contact wipe, clearances and gaps as described in the manufacturer's instruction book. Clean and lubricate all moving parts with manufacturer's approved lubricants. Check electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service. Verify the Kirk Key interlock system. Test bus for insulation resistance. The vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment. Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service. Liquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications. Test insulation resistance of both high and low voltage windings to ground and each other. Inspect temperature relays, gauges, switches and alarms. If equipped with fans and pumps, verify proper operation and test. Verify three (3} phase transformer turns ratio on all taps using a three (3} phase test set. Power factor test. Dry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment. Test insulation resistance of both high and low voltage windings to ground. Inspect temperature relays, gauges, switches, and alarms. Test fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads. Verify transformer turns ratio on all taps. Visually inspect and clean transformer windings. Check torque on all accessible bolted connections. Clean cells and bus components. Test bus for insulation resistance. Visually inspect the main bus. Test all accessible bolted bus connections for proper torque and integrity. Test protective relays. Verify potential and control transformers. Check the breaker lifting device for proper operation. Verify the key interlock system. Energize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. Verify the proper functioning of all indicating devices. Bolted pressure switches: Clean, lubricate and verify electrical and mechanical operation. Energize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. Verify the proper functioning of all indicating devices. Verify the proper operation of the control power transfer equipment. Functional test all protective relays, where permitted. Switchgear and Switchboard Assemblies. Transformers 500 Kilovolt-Amps (kVA) or larger Switches, Vacuum, Medium-Voltage Switches, Air, Low-Voltage. Switches, Air, Medium-Voltage, Metal-Enclosed Motor Control, Motor Starter, Medium-Voltage Motor Control, Motor Starters, Low-Voltage. Metal Enclosed Busways Switches, Air, Medium-Voltage, Metal-Enclosed Switches, Vacuum, Medium-Voltage Transformers, Dry Type, Air-Cooled, Low-voltage, Small. Transformers, Dry Type, Air-Cooled, Low-voltage, Large. Transformers, Liquid-Filled. Circuit Breaker Maintenance 400 amps and above completed tri-annually January May (Testing Period may be adjusted to meet medical center needs) Clean and lubricate, as necessary. Operate the breaker racking mechanisms to verify smooth operation. Operate the breakers to check the operation of auxiliaries and interlocks. For low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set. For medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual. Test insulation resistance. Test contact resistance. Circuit Breakers, Air, Insulated-Case/ Molded-Case. Circuit Breakers, Air, Low-Voltage Power. Circuit Breakers, Vacuum, Medium-Voltage. 5.3 Ground Resistance Testing completed annually July Test Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16\. Grounding Systems. Ground-fault Protection Systems. 5.4 IR Imagery completed annually in July Infra-Red Scanning/Thermographic Survey shall be performed on electrical equipment. Use an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System. Objective of this work is to detect any loose, broken, or corroded connections in the system. Problem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications. Infra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion. Test report shall include nameplate data, test results, general condition and maintenance recommendations, and location. Color pictures shall be provided of any problem areas Note that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system. The report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs. The infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection. Electrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible. Identify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers specifications using a torque wrench or other approved devices. Repair Priority Ratings Temperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions: NETA Priority Criteria for Electrical & Mechanical Exceptions #1 (0 to 18Â°F} Possible deficiency and warrants investigation #2 (18 to 36 Â°F} Indicates probable deficiency, repair as time permits #3 (36 to 72 Â°F} Indicates definite discrepancy; repair as soon as possible #4 (Greater than 72 Â°F} Indicates major discrepancy; repair immediately 5.5 Medium Voltage Relay Testing completed tri-annually January May Protective Relays Microprocessor Based. Calibrate and maintain adjustable protective relays. Visual inspection. Clean. Test. 5.6 Medium Voltage Substation Control Power Batteries completed annually January May Inspect, clean and check torque on bolted connections. Check for proper voltage and regulation. Perform battery impedance and resistance testing. 5.7 Transformer Oil Testing completed annually April June Collect cooling liquid oil sample for testing: General quality tests Dielectric strength Acid neutralization Interfacial tension Visual inspection Water content Power factor Dissolved gas analysis 5.8 Tri-annual 4-Hour Power Outage Test (2029) The Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday. This test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours. During the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. The Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours. The Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. Contractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work. 5.9 Maintenance Reports Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions. Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. NOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings. System Function Tests. Provide function tests for all equipment listed in this Scope of Work. Test Conditions. 5.10 -- Tri-Annual Testing and Inspection Breaker Testing List Base Year: November 1, 2026 Through October 31, 2027 Substation MV Sw XFMRs Â Circuit Breakers Â Â 2027/2030 Qty KVA Qty MFG Ampacity Qty Energy Center Â Â Â Â Â Â Russel Gear N/A N/A Â Cutler Hammer MDS840 4000 1 BE602 Â Â Â Cutler Hammer MDS632 3200 2 Â Â Â Â Cutler Hammer MDS620 2000 3 Â Â Â Â Cutler Hammer MDS616 1600 6 Â Â Â Â Cutler Hammer MDS608 800 2 Â Â Â Â Â Â Â EC2 2 1000 Dry 1 Square D RJ1600 1600 1 Â Â Â Â Square D NE361200 LSG 1200 3 Â Â Â Â Â Â Â EC1 2 2500 Dry 1 5KV SW/5 KV Starters Â Â Â Â Â Â Â Â Â EC3A 2 3000 Oil 1 Square D NW40H 4000 1 Â Â Â Â Â Â Â Tie-GPS-TGPB Â Â Â Square D NW40H 4000 1 Â Â Â Â Square D NW32H 3200 2 Â Â Â Â Â Â Â DPE-5 Â Â Â Square D PJ800 800 1 Â Â Â Â Square D LJ400 400 1 EDSB3 Â Â Â Square D PJ800 800 2 EDSB4 Â Â Â Square D PJ800 800 1 Â Â Â Â Square D LJ400 400 1 EC3B Â Â Â Square D NW20H1 2000 2 Â Â Â Â Square D NW16H1 1600 1 Â Â Â Â Square D NW08H1 800 3 Â Â Â Â Â Â Â GDS3 Â Â Â Eaton SBS 630 3000 4 DPE3 Â Â Â Eaton LT360032 450 2 Â Â Â Â Â Â Â MV Substation Â Â Â C/H 150VCP-W 500 1200 33 Â Â Â Â Â Â Â Research K03 1 1000 Oil 1 GE AK50 1600 2 BF458 Â Â Â GE AK25 600 4 Â Â Â Â Â Â Â Surgery 4 Dry 2 Schneider 1600 3 Â Â Â Â Schneider 800 3 Breaker Testing List Option Year 1: November 1, 2027 Through October 31, 2028 Substation MV Sw XFMRs Â Circuit Breakers Â 2028/2031 Qty KVA Qty MFG Ampacity D21 Â Â Â Â Â Sub A N/A 1500 Oil 2 GE AK2-75 3000 Â Â Â Â GE AK2-50 1600 Sub B N/A 1500 Oil 2 GE AK2-75 3000 Â Â Â Â GE AK2-50 1600 EDSB-2 N/A N/A Â Square D MH36800 800 Emergency Â Â Â Square D MH36600 600 Panel Â Â Â Square D MH36400 400 Â Â Â Â Square D MH34250 250 Â Â Â Â Square D MH34225 225 Â Â Â Â Square D MH34200 200 Â Â Â Â Square D SE 2500 Â Â Â Â Siemens MCCB 1200 Penthouse Â Â Â Â Â Sub W 2 1500 Oil 2 GE AKRT-6D-50H 2000 Â Â Â Â GE AKRT-6D-30H 800 Â Â Â Â Â Â Elevator N/A N/A Â GE AK2A-50 1600 Â Â Â Â GE AK2A-25 600 MICU Â Â Â Â Â MSB-N1 2 750 Dry 1 Siemens WLS2A316 1200 Â Â Â Â Siemens MCCB 800 Â Â Â Â Siemens MCCB 600 Â Â Â Â Siemens MCCB 400 Â Â Â Â Siemens MCCB 300 DPNB1-G Â Â Â Siemens MCCB 800 Â Â Â Â Siemens MCCB 600 Â Â Â Â Siemens MCCB 300 DPNB1 Â Â Â Siemens MCCB 600 DPNB1-CR Â Â Â Siemens MCCB 600 DPNB2-CR Â Â Â Siemens MCCB 600 CB-T-UPS Â Â Â Siemens MCCB 600 7th Floor Â Â Â Â Â EDP Â Â Â Eaton RD320T36W 2000 Â Â Â Â Eaton MCCB 800 Â Â Â Â Eaton MCCB 400 DPHL71EQ Â Â Â Eaton MCCB 800 Â Â Â Â Eaton MCCB 250 DPHL72EQ Â Â Â Square D Power Pact 800 Â Â Â Â Square D Power Pact 400 DPEG2 Â Â Â Eaton MCCB 1200 Cares Tower Â Â Â Eaton MCCB 800 Yearly Breaker Testing List Option Year 2 : November 1, 2028 Through October 31, 2029 Substation MV Sw XFMRs Â Circuit Breakers Â Â 2029/2032 Qty KVA Qty MFG Ampacity Qty Amb Care Â Â Â Â Â Â Sub H1 2 1500 Dry 1 Cutler Hammer MDS632 3200 1 Â Â Â Â Cutler Hammer MDS616 1600 1 Â Â Â Â Cutler Hammer MDS408 800 9 Sub H2 2 1500 Dry 1 Cutler Hammer MDS632 3200 1 Â Â Â Â Cutler Hammer MDS616 1600 1 Â Â Â Â Cutler Hammer MDS408 800 8 EGSB1 Â Â Â Cutler Hammer MCCB 1200 1 Â Â Â Â Cutler Hammer MCCB 1200 1 Â Â Â Â Cutler Hammer MCCB 800 2 Â Â Â Â Cutler Hammer MCCB 600 2 Â Â Â Â Â Â Â Emergency N/A 750 Dry 1 In Amb Care Â Â Emergency 1 750 Dry 1 In Energy Center Â Â Â Â Â Â Â Â Â Cares Tower Â Â Â Â Â Â 1st Floor F1, F2 4 1500 Dry 2 Eaton MDS630 3000 3 BF-193 Â Â Â Eaton MCCB 800 5 Â Â Â Â Eaton MCCB 400 2 Â Â Â Â Eaton MCCB 150 1 Upstairs F3, F4 4 1000 Dry 2 Eaton MDS620 2000 3 PF-105 Â Â Â Eaton MCCB 800 6 Â Â Â Â Eaton MCCB 160 2 DPEG2 - Cares PH Â Â Â Eaton MCCB 1200 1 Â Â Â Eaton MHDL3400F 400 6 Radiology Â Â Â Â Â Â Left side 2 500 Dry 1 Eaton MDS612 1200 2 2B-502 Â Â Â Eaton MCCB 800 2 Â Â Â Â Eaton MCCB 400 2 Â Â Â Â Eaton MCCB 225 7 Right Side 2 1000 Dry 1 Eaton MDS620 2000 1 Â Â Â Â Eaton MCCB 400 1 Â Â Â Â Eaton MCCB 800 1 Â Â Â Â Eaton MCCB 160 3 Pathology 2 1500 Dry 1 GE Wavepro 2500 2 USS-F2 Â Â Â GE MCCB 400 2 Â Â Â Â GE MCCB 150 2 Â Â Â Â GE MCCB 125 1 Â Â Â Â GE MCCB 100 1 Â Â Â Â Â Â Â Lab Warehouse 2 1500 Dry 1 Eaton MDS625 2500 2 USS-F1 Â Â Â Eaton MCCB 630 2 Â Â Â Â Eaton MCCB 400 3 Â Â Â Â Â Â Â Parking Garage 1 Oil 1 Â Â Â Yearly Breaker Refurbishing and Testing Listing Option Year 3 : November 1, 2029 Through October 31, 2030 Substation MV Sw XFMRs Â Circuit Breakers Â Â 2027/2030 Qty KVA Qty MFG Ampacity Qty Energy Center Â Â Â Â Â Â Russel Gear N/A N/A Â Cutler Hammer MDS840 4000 1 BE602 Â Â Â Cutler Hammer MDS632 3200 2 Â Â Â Â Cutler Hammer MDS620 2000 3 Â Â Â Â Cutler Hammer MDS616 1600 6 Â Â Â Â Cutler Hammer MDS608 800 2 Â Â Â Â Â Â Â EC2 2 1000 Dry 1 Square D RJ1600 1600 1 Â Â Â Â Square D NE361200 LSG 1200 3 Â Â Â Â Â Â Â EC1 6-Jun 2500 Dry 1 5KV SW/5 KV Starters Â Â Â Â Â Â Â Â Â EC3A 2 3000 Oil 1 Square D NW40H 4000 1 Â Â Â Â Â Â Â Tie-GPS-TGPB Â Â Â Square D NW40H 4000 1 Â Â Â Â Square D NW32H 3200 2 Â Â Â Â Â Â Â DPE-5 Â Â Â Square D PJ800 800 1 Â Â Â Â Square D LJ400 400 1 EDSB3 Â Â Â Square D PJ800 800 2 EDSB4 Â Â Â Square D PJ800 800 1 Â Â Â Â Square D LJ400 400 1 EC3B Â Â Â Square D NW20H1 2000 2 Â Â Â Â Square D NW16H1 1600 1 Â Â Â Â Square D NW08H1 800 3 Â Â Â Â Â Â 

<!-- mobian-agent-ad sponsored="true" id="0dcf8f41-5b0b-4161-b65f-39f9cd4109ec" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fa9ce7ab283844aebb30fa8061868bbe/download)

## Contacts

* Christopher A. Callihan, Contracting Officer

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/f8525ad8a3e545b6b30bbfd9fe260ad3/view)

[More from United States Department of Veterans Affairs posted in June 2026](/department%5Fof%5Fveterans%5Faffairs/archive/2026-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"J061--541 Electrical Power Distribution Equipment Testing,   Inspection, and Maintenance (VA-27-00000997) - VAMC  Cleveland","description":"Page 3 of 3 This is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance. VAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance STATEMENT OF WORK (SOW) as of 3/7/2026 1. Contracting Officer s Representative (COR). Name: TBD Section: Address: 10701 East Blvd, Cleveland, OH 44106 Phone Number: TBD Fax Number: TBD E-Mail Address: TBD 2. Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance 3. Background. Louis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections. Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s). 4. Scope. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance as defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract. In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation. All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection. Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW. 5. Specific Tasks. Onsite testing, inspection, minor repair, and housekeeping. 5.1 Substation and Transformer Maintenance completed tri-annually January May (Testing Period may be adjusted to meet medical center needs) Visually inspect, tighten hardware and torque bolted connections. Manually operate each switch to check operation of auxiliaries and interlocks. Check contact wipe, clearances and gaps as described in the manufacturer's instruction book. Clean and lubricate all moving parts with manufacturer's approved lubricants. Check electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service. Verify the Kirk Key interlock system. Test bus for insulation resistance. The vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment. Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service. Liquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets...","url":"https://matchawards.com/department_of_veterans_affairs/posts/116727554514497350","identifier":"36C25026Q0634","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J061 - MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT"}],"availabilityStarts":"2026-06-10","availabilityEnds":"2026-06-17","validThrough":"2026-06-17T23:59:59-04:00","areaServed":"Cleveland, Ohio 44106-1702, UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/f8525ad8a3e545b6b30bbfd9fe260ad3/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

