3695--Laundry Lint Collector
- Status
- Closed, the response deadline passed on Jul 9, 2026
- Agency
- United States Department of Veterans Affairs
- Office
- TAMPA, USA
- Notice type
- Sources Sought
- Solicitation number
- 36C24826Q0765
- NAICS
- 333310 - Commercial and Service Industry Machinery Manufacturing
- PSC
- 3695 - MISCELLANEOUS SPECIAL INDUSTRY MACHINERY
- Category
- Machinery & Components (5.1)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-07-01
- Deadline
- 2026-07-09
Description
Good day, SDVOSB s, VOSB s, SB s This Sources Sought is issued solely for informational and planning purposes only. It does not constitute the issuance of a solicitation or a promise to issue a solicitation in the future. The purpose of this notice is to conduct market research and obtain information from qualified SDVOSB businesses. This is not a request for bids, quotes, offers, or proposals. The responses to this announcement will assist in determining the socio-economic status such as a SDVOSB set-aside if feasible. If insufficient SDVOSB responses are received to establish the basis for setting this requirement aside for SDVOSB s, the requirement may be solicited as a VOSB or a SB set aside in which case all interested parties responding shall be eligible to compete. Please direct reply in the affirmative via email if you are interested and can provide the required service/product for this requirement. Please provide your capability statement, I will accept responses for this Sources Sought until the 12th of June 2026 at 14:00 EST, thanks. STATEMENT OF WORK INTRODUCTION Background The Veterans Health Administration (VHA) Textile Care Management (TCM) Program consists of the Textile Care Processing and Textile Management Services (uniform management, textile management and distribution, and patient assistance program) both contribute to the proper distribution, handling, processing and management of textile goods and services within VA medical facilities. The TCM Program, outlines the procedures, reporting requirements, and operating guidelines for TCM and Textile Care Facility Operations within VA medical facilities. The Department of Veterans Affairs (VA), on behalf of the Veterans Health Administration (VHA), Textile Care Management Program will procure Textile Care Processing Facility laundry equipment. The mission of the National Acquisition Center (NAC), High Tech Medical Equipment Picture Archiving and Communication Systems and Laundry Division, is to meet the VA s five core values that underscore the obligations inherent in VA s mission: Integrity, Commitment, Advocacy, Respect, and Excellence. Purpose and Objectives Textile Care Processing Facilities (TCPFs) are responsible for providing textile processing services, which ensures a consistent supply of bacteriologically clean textiles to support patient treatment programs. VA laundries provide clean laundry for VA patients in a variety of settings. Textile Care Processing operations are the primary focus of the established directive which outlines the responsibilities, procedures, and processes that: Minimize the infection risks of handling and processing contaminated textiles. Ensure an efficient operation through measurable quality assurance indicators. Identify and require the practice of safety precautions to promote workplace safety. Ensure continuity of service in case of an emergency shutdown. Contract Duration The total contract duration is 120 days. The laundry equipment shall be delivered within ninety (90) days after the effective date of the contract. Installation of the laundry equipment shall take place no more than thirty (30) days after the delivery date. The one (1) day onsite shakedown and one (1) days onsite training are included in the installation timeframe. Training shall consist of two (2) hours per line item for both operator and maintenance personnel at a minimum. Trainings shall not to be conducted concurrently. Note: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until installation and shakedown has been completed. Installation may take place on the weekends if pre-approval is given by the Contracting Officer Representative (COR). Site Specific Project Requirements The contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW) and Technical Specifications. This SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The installation of the delivered equipment shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts. The laundry equipment shall be located within Building 13, on the roof. Hurricane Equipment Protection The TCPF is susceptible to hurricane damage. As such, all roof mounted equipment and ductwork shall be provided with equipment tie downs for the hurricane protection. All exterior mechanical louvers shall be specified to meet all impact and hurricane codes. Lightning Protection The TCPF is susceptible to lightning damage. As such, all roof mounted equipment and ductwork shall be provided with lightning protection. All valves within the layout of the laundry and equipment shall be ball valves with the appropriate ratings, which are part of the scope of work within this RFQ and resultant contract. The contractor shall remove all old piping, drain piping, ductwork, vents, hangers, water piping associated with the removed equipment. All piping, and air lines shall be new, Existing exhaust ductwork may be reused but will need to be cleaned out. Electrical for the laundry equipment will be new and connection point will be identified by the station. All piping, water, conduit, and air lines within this RFQ and resultant contract shall have new valves for each new equipment. Waste Material Sorting/Recycling The contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris. The contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drain pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 ½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings. Painted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property. The Point of Contact (POC) designated contractor staging area (TBD after award, unless the staging is identified prior to award) shall be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights. External Equipment/Motor Protection Filters are to be provided for all air intakes to include all new laundry equipment, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8"-3/8" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling. The media shall not shed fibers, absorb moisture, or promote bacterial growth; the filter shall be UV protected, stand up to extreme indoor exposure, withstand corrosive chemicals, withstand high velocity air flow and withstand industrial cleaning and maintenance. The contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc. The contractor shall supply one (1) lock-out and tag-out kit with the lock-out/tag-out devices for each piece of equipment. The location of the kits shall be in the maintenance shop. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc. Number and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example: Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications. All equipment shall have operating instructions to include powering on and off the machine and operators instruction. All labeling shall be on blue magnetic embossed fabric (flexible) with white core lettering. Contractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (water, steam, condensate, gas, and air). Connections to VA supplied utilities shall be new to equipment. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes ( water, air, electrical), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated within the scope of this SOW. The contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the contractor causes damages to any Government property, the contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the contractor fails or refuses to make such repair(s) or replacement(s), the contractor shall be liable for the cost, which may be deducted from the contract price. Existing equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment. Utility Shutdowns Contractor shall provide ten (10) calendar days advance notice for any planned utility shutdown(s). Contractor shall follow TCPF s protocol on notice of any utility shutdown(s). Hot Work Permits The contractor shall adhere to the TCPF s protocol on notice of any hot work permits needed, if applicable. Contractor shall provide two (2) days advanced notice for any planned hot work shutdowns. The TCPF will be open during the project. The contractor will have access to the TCPF Monday Saturday, six days a week from 0600 AM-3:30 PM. On the weekends there will be a TCPF staff member on station to allow entrance and will remain with the contractor while they are on station. NOTE: With POC approval the contractor may work evenings and/or weekends to accomplish the work required. Badge Requirements The contractor s personnel (including subcontractors) shall obtain a PIV badge through the VA POC or VA POC will provide temporary contractor badges during the duration of the installation workday. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.] Site Visit The contractor has the responsibility of visiting the site and examining the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with site conditions that may affect their quote will be at the contractor s risk. The TCPF will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor shall request a scheduled date to visit the TCPF and the POC will determine if the requested date and time is available. Site visit requests shall be made by contacting: Ms. Lisa Delaporte Mobile Phone 727-271-8687 Email: Lisa.Delaporte@va.gov Exemption Certificate The POC will provide a valid sales and use tax certificate of exemption for the State of Florida to the contractor. General Installation Requirements Existing utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be identified by the station to all equipment. When existing service lines are removed, they shall be removed back to the source. The contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities. Should additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, water and air lines. All exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected. Equipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment. The contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to: All mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the POC. Any and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration. Contractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits). The contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities. All installation and/or modifications of designs to include utilities, walls, etc. shall match existing materials. No wooden platforms allowed. All pipes, vents, drains, electrical boxes, ductwork, and conduit shall be new. All pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030 thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable. Air Piping: (Only identification/flow markings) Air Intake Ductwork: Safety White PVC (Identification and flow markings) Vent Pipe: Painted Flat Black (Identification and flow markings) Drain Line: Painted Flat Black (Identification and flow markings) Domestic Water: Safety White PVC (Identification and flow markings) Fire Suppression Piping: Painted Bright Red (Identification and flow markings) Outside Exposed Ductwork: Sealed watertight and weather-proofed to protect from the environment All Conduits: Not Painted (Identification and markings with voltage) Installation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the POC. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. If necessary to drill through any walls, floors or ceiling sections, the contractor shall notify the POC immediately. The POC shall work with the Facility Engineer and contractor to determine proper location. Valve Tags - Furnish and install valve tags on all air, and water valves on equipment and connection points. Tags shall be engraved with identification (gas, air etc.), black filled identification, numbers, and letters not less than ½ inch high for number designation and not less than ¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain. Equipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor. Belts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit. Plumbing Requirements Plumbing Grooved or mechanical fittings are acceptable on air lines and electrical conduits, and are unacceptable on plumbing, steam or condensate piping. Press connect type fittings shall be used on air lines only. Dielectric Fittings Provide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections. The contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components. Atmospheric Vacuum Breaker. Hose bibs and sinks with threaded outlets. . Plumbing Installation In accordance with the National Standard Plumbing Code, 2021 Edition. Pipe saddles shall be installed on the outside of all insulation and PVC coverings. Escutcheons shall be installed at all floors, wall and ceiling loAttachments
More from United States Department of Veterans Affairs posted in June 2026