ClickCease 6350--CRRC X-Ray and Magnetometer Security… (36C10X26Q0175) | Closed - MatchAwards

6350--CRRC X-Ray and Magnetometer Security (VA-26-00036534)

Status
Closed, the response deadline passed on Jun 6, 2026
Agency
United States Department of Veterans Affairs
Office
FREDERICK, USA
Notice type
Sources Sought
Solicitation number
36C10X26Q0175
NAICS
334519 - Other Measuring and Controlling Device Manufacturing
PSC
6350 - MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS
Category
Security Systems (3.2)
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
2026-05-22
Deadline
2026-06-06
Place of performance
Martinsburg, WV 25405

Description

PERFORMANCE WORK STATEMENT CRRC Physical Security Screening Equipment X-Ray Inspection System and Walk-Through Metal Detector 1. BACKGROUND The mission of the Department of Veterans Affairs (VA), Office of Information Technology (OIT), Capital Region Readiness Center (CRRC) is to provide Information Technology (IT) services to Veterans of the United States. In meeting these goals, OIT strives to provide high quality, effective, and efficient Information IT services to those responsible for providing care to the Veterans at the point-of-care as well as throughout all the points of the Veterans health care in an effective, timely and compassionate manner. The Capitol Region Readiness Center (CRRC) in Martinsburg (WV) houses facilities with critical technological infrastructure, sensitive Veteran data, essential personnel, and systems that support nationwide VA operations. To ensure operational continuity and protect these vital assets, OIT Space and Facilities Management ( SFM) X-Ray Inspection System and Walk-Through Metal Detector equipment to establish a robust security perimeter. SFM is responsible for overseeing the safety and security of its personnel, visitors, and critical assets, ultimately safeguarding the integrity of its operations and maintaining a secure working environment. 2. SCOPE OF WORK The Contractor shall provide all labor, tools, material, parts, installation, and support services for the systems described below: One (1) parcel X-Ray Inspection System and one (1) Walk-Through Metal Detector (Magnetometer) with handheld wand, meeting the minimum salient characteristics identified in Sections 7.0.1 and 7.0.2. The Contractor shall keep this equipment maintained in peak operating condition in accordance with the manufacture s specifications. The Contractor shall employ maintenance personnel and technicians who possess current manufacturer-specific training and certification in the installation, configuration, troubleshooting, and repair of these systems. 3. CONTRACT TYPE This requirement will be a firm fixed price contract. 4. PERIOD OF PERFORMANCE The period of performance is 9/1/2026 to 8/31/2027 for the base year plus four option year periods for maintenance. Base: 9/1/2026 8/31/2027 Option Period 1: 9/1/2027 8/31/2028 Option Period 2: 9/1/2028 8/31/2029 Option Period 3: 9/1/2029 8/31/2030 Option Period 4: 9/1/2030 8/31/2031 5. PLACE OF PERFORMANCE The tasks under this PWS shall be performed at the Capital Region Readiness Center (CRRC), 221 Butler Avenue, Bldg. 511, Martinsburg, WV 25405 which is located on the Martinsburg VA Medical Center (VAMC) grounds. The facility is the first building on the left as you enter the VAMC campus. It is a one-story building with a loading dock. 6. TRAVEL Travel is not required to fulfill this requirement. 7. TASK STATEMENT 7.0.1. Delivery and Install Compact Parcel X Ray Inspection System Minimum Salient Characteristics: Tunnel size minimum 60 cm x 50 cm (or equivalent) suitable for mail and small parcels Dual energy X ray imaging capable of differentiating organic, inorganic, and mixed materials High resolution imaging system with enhanced image clarity for threat detection Includes AI based automatic threat detection , capable of identifying firearms, knives, ammunition, explosive components, and other contraband Must provide multi color image presentation, image enhancement tools, zoom, density classification, and edge highlighting Conveyor must support a minimum load capacity of 150 200 kg, bidirectional operation preferred System must comply with U.S. radiation safety standards for operators and bystanders Includes operator workstation, monitor, and image management controls Capable of saving, storing, and exporting security images for review and audit Compact footprint suitable for mailroom or small office security screening areas System must include onsite setup 7.0.2. Delivery and Install Walk Through Metal Detector (Magnetometer) with wand Minimum Salient Characteristics: Dual panel walk through design for high sensitivity screening Minimum 20 detection zones or multi zone equivalent to localize alarm areas Capable of detecting a wide range of metallic threats including knives, guns, and small metal objects Adjustable sensitivity levels suitable for varying security requirements High discrimination ability to reduce false alarms from harmless personal items Audible and visual alarm indicators with zone identification High throughput screening capability for personnel entry points Integrated counters for traffic, alarms, and statistics Lightweight modular structure for easy installation and relocation Must comply with recognized electrical safety and EMC standards Operates on standard AC power; low energy consumption System must include onsite setup One (1) handheld wand metal detector included 7.0.3. Training for X-Ray Inspection System and Magnetometer Contractor shall provide basic operator training (on-site) and materials (manual, video, or virtual session). Operators are able to operate equipment successfully after training is completed. Training materials, sign in sheet and completion certificates are provided to the VA Contracting Officer s Representative (COR). Tasks performed shall be of a non-personal nature. VA organizations will not provide supervision of contractor personnel. Contractor personnel shall at no time allow an employer-employee relationship to develop with VA organizations or their staff. VA organizations will refrain from any activities that create the appearance of such a relationship. Contractors shall not perform inherently governmental functions including decision-making, supervision of Government employees, supervision of other contractors on other contracts, and activities that create the appearance of performing such functions. 7.0.4. Removal of Materials/Trash (Not Separately Priced) The Contractor shall keep the job site clean, free from accumulations of waste material or trash. The Contractor shall be responsible for removing all waste material or trash from Government property, so as to deter accumulation of debris. All material subject to recycling shall be properly disposed. 7.0.5 Commercial Warranty (Not Separately Priced) The Contractor shall provide all standard commercial warranties for both items 7.0.1 and 7.0.2 The standard commercial warranty shall include a minimum 12 month manufacturer s warranty covering parts and labor, helpdesk or technical support contact information must be provided. Replacement parts must be available within the warranty period. The Contractor shall provide all warranty documentation and terms and conditions at time of delivery and installation. Failure to provide warranty documentation shall be cause for rejection of the deliverable. 7.1. Equipment Maintenance and Repair 7.1.1. The Contractor shall provide support, maintenance, and repair service for the equipment installed in 7.0.1. and 7.0.2. Furnish all labor, supervision, equipment, tools, material supplies, travel, and transportation necessary to support the X-Ray Inspection System and Magnetometer. The Contractor shall repair or replace any X-Ray Inspection System and Magnetometer as necessary to keep equipment fully functional and operating. 7.1.2. The Contractor shall obtain all necessary manufacturer s specifications for equipment, parts, and drawings to manage the Inspection System and Magnetometers. 7.1.3. The Contractor shall perform annual preventive maintenance (PM) inspection on the X-Ray Inspection System and Magnetometers during the POP. The Contractor shall submit a proposed PM schedule to the COR within 30 days of contract award for COR approval. This must include the manual inspecting and testing of all X-Ray Inspection System and Magnetometers components with inspection/testing reports on an annual basis. An initial draft Method of Procedure (MOP), outlining all PM tasks, shall be submitted to the COR within 30 days of contract award. Updated MOPs shall be provided to the COR within 14 days of each completed annual PM inspection;the COR has final approval authority on the MOP. The Contractor shall verify the operation of the X-Ray Inspection System and Magnetometers with the COR upon completion of work. 7.1.4. The Contractor also shall provide a no-cost written estimate(s) within seven (7) days of notification for all work considered as end-of-life expectancy, unforeseen or contingency related but required to sustain efficient and safe operations. The estimate itself is provided at no cost to the Government; actual repair work resulting from such estimates may require a separate bilateral modificationThe Contractor shall provide quotes and/or MOPs, that are determined acceptable by the COR. 7.1.5. The Contractor shall provide a maintenance Return to Service level of response with a technician on-site to resolve all failures within twenty-four (24) hours after the VA representative calls the Contractor s technical support number. Telephonic phones response for trouble shooting within eight (8) hours. The X-Ray Inspection System and Magnetometers operating systems must be fully functional upon completion of service call. If the equipment cannot be restored to full functionality within 72 hours of the initial service call, the Contractor shall provide a written status report to the COR with an escalation plan and estimated time to resolution. 7.1.6. The Contractor shall provide X-Ray Inspection System and Magnetometers emergency services and/or repairs as required by the Government. a.) This must be effective during both business and non-business hours. b.) On-site response time is within twenty-four (24) hours. Telephonic phones response for trouble shooting within eight (8) hours. c.) The services and repairs must include all parts and labors. d.) Service will generally be requested by a service ticket signed by the COR; and/or Contractors authorized to request services and sign service tickets. The Contracting Officer (CO), COR, or other designated Government representative may direct the Contractor to perform the work during Holidays and outside of normal Monday through Friday, from 7:00 A.M. through 3:00 P.M. EST business hours. Deliverable: A. Annual Preventative Maintenance Inspection Report B. Written Method of Procedure (MOP) - Initial draft within 30 days of award; updates within 14 days of each annual PM C. 72-Hour Escalation Report (as applicable) 7.2 REPORTING REQUIREMENTS During the installation and acceptance phase (from award through VA acceptance of equipment and training), the Contractor shall provide weekly progress reports to the COR in electronic form. Reports shall reflect status as of close of business each Friday and shall include: work completed during the reporting period, upcoming tasks, any issues encountered, and planned resolution. Upon VA acceptance of equipment and training, weekly reporting shall cease. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. It is expected that the Contractor shall maintain communication with VA accordingly so that any arising issues are transparent to both parties to prevent escalation of outstanding issues. Service Log reports shall be provided for on-site maintenance visits. Reports shall include the reported issue and resolution. If the problem is not resolved, the Contractor shall provide an explanation including their plan and timeframe for resolving the issue. It is expected that the Contractor shall maintain communication with VA accordingly so that any arising issues are transparent to both parties to prevent escalation of outstanding issues. VA Acceptance Process: Upon completion of equipment installation and operator training, the Contractor shall notify the COR in writing. The COR shall complete a formal acceptance review within five (5) business days. VA acceptance shall be documented in writing by the COR and provided to the Contractor and CO. Deliverable: Weekly Progress Report Until VA Acceptance of equipment and training (installation phase only) Annual Service Log Report VA Acceptance Documentation 8. DELIVERY SCHEDULE Task Deliverable Quantity Delivery Date Task # 7.0.1 Delivery and install equipment of Compact Parcel X Ray Inspection System 1 each Within 45 days of award notification Task 7.02 Delivery and install Walk Through Metal Detector (Magnetometer) with wan 1 each Within 45 days of award notification Task # 7.0.3 On-site Training, Manuals, Sign-in Sheet, and Completion Certificates 1 each Within one (1) week of completed install Task #: 7.2 Weekly Progress Report Weekly COB Fridays (installation phase only) Task #: 7.2 Annual Service Log Report Annual Within one (1) week of the annual PM inspection Task #: 7.1.3 Annual Preventative Maintenance Inspection Report Annual Within fourteen (14) days after each inspection Task #: 7.1.3 Written Method of Procedure (MOP) Original and update as Required Initial draft within 30 days of award; updates within 14 days of each annual PM Task 7.2 VA Acceptance Documentation 1 Within 5 business days of Contractor notification of completion Task 13.2.1 Contractor Staff Roster 1 (updated as needed) Within 3 business days of award; updated within 1 business day of any changes 10. OTHER DIRECT COSTS Not applicable. 11. GOVERNMENT- FURNISHED EQUIPMENT/ MATERIALS/ FACILITIES/ INFORMATION The Government will provide adequate physical workspace for Contractor personnel during on-site installation, maintenance, and service visits. Contractor personnel are expected to provide their own tools, diagnostic equipment, and devices necessary to perform work under this contract. Government-furnished laptops, email accounts, and network access will not be provided unless the CO and COR determine in writing that a specific operational need requires it. Contractor personnel shall comply with all VA physical security requirements while on-site, including wearing visible identification at all times. If VA network access is determined to be operationally necessary, applicable VA IT security requirements will be addressed through a separate written agreement. The VA laptop computers must comply with all rules/requirements regarding patches and updates and must be returned to VA at the conclusion of the task order. 12. QUALITY ASSURANCE SURVEILLANCE PLAN Performance Standards define required performance for specific tasks. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. The Government may utilize the Performance Based Service Assessment Survey, or other methods to compare contractor performance to the Acceptable Levels of Performance (ALPs). 12.1 METHODS OF SURVEILLANCE Various methods exist to monitor performance. The COR shall use any or several of the surveillance methods listed below in the administration of this QASP. 100% Inspection (evaluates all outcomes) - Each month, the COR shall review all of the contractor s performance/generated documentation and document results accordingly. This assessment shall be placed in the COR s QA file. Random Sample - The COR shall review a random sampling of the contractor s performance/generated documentation and document your results accordingly. This assessment shall be placed in the COR s QA file. Validated Customer Complaint or Validated Below Average ALP in a Specific Area - Each month, the COR shall review the contractor s performance/generated documentation corresponding to a validated customer complaint or validated inability to perform in accordance with the ALP in a specific area and document your results accordingly. This assessment shall be placed in the COR s QA file. 12.2 FREQUENCY OF MEASUREMENT During task order performance, the COR shall conduct surveillance at a minimum of quarterly during the installation and warranty period, and at a minimum of twice annually during subsequent option periods. Response time compliance and equipment downtime shall be monitored on a continuous basis through service log review. 12.3 ACCEPTABLE PERFORMANCE LEVELS (APLS) Requirement Performance Standard Surveillance Method Outcome PROJECT MANAGEMENT, MILESTONES, AND SCHEDULE a. Notifies customer of potential problems 90% of the time. 100% Inspection of agreed upon milestones per the approved PMP Notification occurs within two business days of potential issue when known in advance or within 24 hours of urgent problems, where less than two business days exist b. Submits Deliverables in accordance with the deliverable schedule within (+/-) five business days with no more than five incidents of performance slippage 100% Inspection of deliverables No more than five incidents of performance schedule slippage WRITTEN COMMUNICATION Uses correct English grammar, punctuation, and spelling 95% of the time; communicates information in a succinct and organized manner, produces written information that is appropriate for the intended audience Random Sampling Written communication is consistently error-free and clear and concise so that the message is easily understood by others CUSTOMER SUPPORT Courteous and professional interactions to receive and fill task order deliverables and in providing order status. Customer (VA) support satisfaction, having no more than 5 incidents of dissatisfaction. Customer Feedback and Complaints based on interactions with the contractor Customer problems are resolved within the same business day; no more than 5 incidents spent by Government personnel in providing corrective feedback on unacceptable customer service/professionalism EQUIPMENT RESPONSE TIME On-site technician response within 24 hours; telephonic troubleshooting response within 8 hours, 95% of the time 100% Inspection of Service Logs No more than 2 instances of failure to meet response time requirements per period EQUIPMENT UPTIME / AVAILABILITY Equipment shall be operational and fully functional a minimum of 95% of scheduled operating hours per quarter Service Log Review; COR Observation Downtime does not exceed 5% of scheduled operating hours in any quarter PREVENTIVE MAINTENANCE Annual PM completed on schedule per approved PM plan; MOP submitted within 14 days of PM completion 100% Inspection of PM Reports and MOPs PM completed annually; no more than 1 instance of late MOP submission per period 12.4 DOCUMENTING PERFORMANCE Acceptable Performance The Government shall document acceptable performance in accordance with the chart above. Any report may become a part of the supporting documentation for any contractual action. Unacceptable Performance When unacceptable performance occurs, the COR shall inform the CO. This will always be in writing although when circumstances necessitate immediate verbal communication, that communication will be followed in writing. The COR shall document the discussion and place it in the COR file. When the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager. The contractor shall acknowledge receipt of the CDR in writing to the CO. The CDR will state how long after receipt the contractor has to take corrective action. The CDR will also specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CO shall review the contractor's corrective action plan to determine acceptability. Any CDRs may become a part of the supporting documentation for any contractual action deemed n

Attachments

Source notice

More from United States Department of Veterans Affairs posted in May 2026

More lists