Project # 618-26-701 - EHRM - Infrastructure Upgrades - Main Computer Room Update - Minneapolis VAMC - Minneapolis, MN
- Status
- Closed, the response deadline passed on Jul 15, 2026
- Agency
- United States Department of Veterans Affairs
- Office
- INDEPENDENCE, USA
- Notice type
- Presolicitation
- Solicitation number
- 36C77626B0017
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Y1DZ - CONSTRUCTION OF OTHER HOSPITAL BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-07-15
- Deadline
- 2026-07-15
- Place of performance
- Minneapolis, Minnesota 55417, UNITED STATES
Description
The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build to support the Electronic Health Record Modernization (EHRM) Infrastructure Upgrades construction project at the Minneapolis Veteran’s Affairs (VA) Medical Center (VAMC) located at One Veterans Drive, Minneapolis, MN 55417-2309.
The Minneapolis VAMC is seeking a general contractor to consolidate and renovate all existing Data Center Spaces (2B-105 and BH-111) with no network downtime. This work includes but is not limited to: Lock out/Tag out of all sources of energy; Installation of new Information Technology (IT) equipment enclosures; New cold aisle containment with new rack power distribution units; New power distribution to the MCR and enclosures with new cable management; Structured cabling and management; Installing structure cabling in data center(s) and termination of existing campus fiber backbone; New redundant MDAs for A/B paths; Update data center layout and power distribution; Phased transfer of crucial power; Installation of UPS A/B; Provide additional raised floor shoring/structural supports; Provide temporary utilities; New core drills, installation or relocation of existing duct work and removal of unused legacy ductwork; Connect existing IT chilled water loop; and Renovation of requirements for the MCR within the specifications.
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
- Attachment 18
- Attachment 19
- Attachment 20
- Attachment 21
- Attachment 22
- Attachment 23
- Attachment 24
- Attachment 25
Contacts
- Penhollow, Zachary E.
- Joelle M Mascarenas
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in March 2026