C1DZ--460-19-004 | Morgue HVAC Design | NCO 4 Construction East
- Status
- Closed, the response deadline passed on Feb 12, 2026
- Agency
- United States Department of Veterans Affairs
- Office
- PITTSBURGH, USA
- Notice type
- Presolicitation
- Solicitation number
- 36C24426R0042
- NAICS
- 541330 - Engineering Services
- PSC
- C1DZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS
- Category
- Construction Related Services (4.2)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Posted
- 2026-01-28
- Deadline
- 2026-02-12
- Place of performance
- Wilmington, Delaware 19805, UNITED STATES
Description
Page 13 of 13 ACQUISITION INFORMATION: The Wilmington Department of Veterans Affairs Medical Center located at 1601 Kirkwood Highway, Wilmington DE, 19805 is seeking professional Architect and Engineering (A&E) services for Project No. 460-19-004, Morgue HVAC Design. This announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send two copies of an SF 330 (8/2016 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement. Wilmington, DE VA Medical Center Wilmington, DE 19805 A/E SCOPE OF WORK For Replace HVAC System for The Morgue Project No. 460-19-004 Construction Budget: Bid Documents/Final Report Ready by: 123 days after NTP -- Services -- PROVIDE: Professional Architectural, Engineering, and Healthcare Planning Services to include but not limited to: Site investigation architectural, structural, mechanical, electrical, and environmental services. Contract drawings and specifications for construction. 3rd Party Cost Estimates. Infection Control Risk Assessment. Construction period services - review of submissions, provide recommendations regarding contractor change proposals, visit site per VA's request and add to drawings as-built conditions from contractor's record drawings; A/E will respond on site within a two-hour period when requested. Construction Management Services during construction. Meet all the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at http://www.cfm.va.gov -- Project Scope -- GENERAL: This project is located in Building 1, ground floor RM 149, at the Wilmington VA Medical Center. It involves all design work and phasing to remove and replace the existing HVAC distribution system that services the morgue and associated areas. The project boundaries include building 1 rooftop and ground floor rooms 147E though 147L. Other items required to be installed outside of these project boundaries to meet the goals of the project are acceptable. The morgue is comprised of an autopsy room, a six-compartment refrigerator unit and two bathrooms. The morgue area measures approximately 1,128 sqft. SPECIFICS: A/E is to have all material, located in the morgue, that is damaged or degraded removed from the ceiling up to the deck; including, but not limited to light fixtures, ceiling grid and tile, diffusers, ductwork, reheat coils, etc. and to end with a new installation of items that were removed. New light fixtures shall be energy efficient. Fire protection, fire alarm, security, and public announcement systems may be left installed as-is with alteration for the new construction. Any material found to be damaged, degraded or not code compliant, shall be replaced. Any piping, and ductwork that is found to be abandoned or is to be demolished shall be removed from the site. The negative pressure monitoring system for the autopsy room shall be replaced/installed. Install direct digital controls and integrate the new system into the existing Building Automating System in Building 1 room 128. A/E is to remove and replace the six-compartment refrigerator unit. A/E to design and show all infection control / dust prevention measures required. A/E to assess and design any asbestos abatement such as pipe lagging, floor tile and mastic. A/E to provide necessary literature on new technology or installation methods when required. A/E will conduct investigations to ensure recommended methods are compatible within building. A/E to work closely with VA facilities staff to develop an efficient and functional design within VA guidelines. Architect/Engineer shall utilize the services of the Network 4 contracted Fire and Safety Engineer to conduct a fire and life safety peer review of the project. The architect/engineer shall provide a complete copy of the 75% document submission to the VA Project Engineer to forward for review. The contracted Fire and Safety Engineer will return comments to both the architect/engineer and the VA Project Engineer prior to the corresponding review meeting. The A/E will incorporate the review comments into the 100% submission at no additional fee to the VA for this service. OTHER SPECIFICS: The A/E is to plan all phasing of work in coordination with hospital staff in order to minimize down time to office areas. The morgue shall remain in service to hospital staff members during construction. Identify and correct fire and life safety deficiencies by site inspections. The consultant shall address these items as required to correct deficient items. Evaluate all doors and hardware throughout the project for compliance with life safety code NFPA 101. Identify and correct improperly filled firewall penetrations. All areas in this building are fully sprinklered. Construction Waste Management, Specification 017419 is to be included. Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA. DER, EPA, NEC, NFPA 101 Life Safety Code. All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at http://www.cfm.va.gov/til. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications. -- Site Investigations -- EXPECTATION: A/E will make site visits as necessary to survey existing conditions. Make site visits as required to determine existing as-built conditions affecting this project. Provide any civil, structural, architectural, electrical, and mechanical investigative work including exterior site work, of both existing and designed systems necessary to insure the accuracy of the design. Prepare any measured drawings of existing systems of facility required to insure the accuracy of the design. Provide a CIH to evaluate the impacted building areas for asbestos. Provide a CIH to evaluate the impacted building areas for lead based paint NOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov/til. AutoCAD background drawings will be provided by the VA upon request. The A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the Project Engineer. -- Sustainable Design and Energy Reduction -- EXPECTATION: All designs shall be in accordance with sustainable design and energy reduction goals. Federal Mandates require all Federal government construction projects to comply with sustainability and energy reduction requirements. To this end, the VA is committed to the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings. The goal of this project is to outperform the challenges mandated by ASHRAE 90.1 by 30%. A/E will provide and energy assessment comparison of existing equipment with new equipment to be installed. -- Environmental/Occupational Safety and Health (EOSH) -- EXPECTATION: All projects and project designs shall contain language that addresses all applicable EOSH requirements. Regulatory Compliance EOSH requirements for work performed at the above location can be found in: Volume 29 of the Code of Federal Regulations, Part 1910 Occupational Safety for General Industry Volume 29 of the Code of Federal Regulations, Part 1926 Occupational Safety for The Construction Industry Volume 40 of the Code of Federal Regulations Protection of The Environment Volume 49 of the Code of Federal Regulations, Part 397 Transportation of Hazardous Materials Title 7 of the Delaware Code Conservation Title 16 of the Delaware Code Health and Safety Specifications The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications must be used as the basis for project designs. A complete list of these specifications can be viewed at the following website: http://www.cfm.va.gov/til. Specifications which address EOSH requirements include, but are not limited to, the following: SECTION 01 00 00 General Requirements SECTION 01 57 19 Temporary Environmental Controls SECTION 01 74 19 Construction Waste Management SECTION 02 82 11 Traditional Asbestos Abatement SECTION 02 82 13.13 Glovebag Asbestos Abatement SECTION 02 82 13.19 Asbestos Floor Tile and Mastic Abatement SECTION 02 82 13.31 Asbestos Transite Abatement SECTION 02 82 13.41 Asbestos Abatement for Total Demolition Project SECTION 02 83 33.13 Lead-Based Paint Removal and Disposal -- Design Review Schedule -- EXPECTATION: Submit review packages so they are received on the noted day. SUBMISSIONS: Submit review packages so they are received on the noted day (calendar days after NTP) or earlier: Notice to Proceed / Initial PDT Meeting day 0 (0 days) Design Development Document Submission (25%) day 30 (30 days) PDT Review Meeting (25%) day 37 (7 days) Design Development Document Submission (50%) day 67 (30 days) PDT Review Meeting (50%) day 74 (7 days) Design Development Document Submission (75%) day 88 (14 days) PDT Review Meeting (75%) day 95 (7 days) Design Development Document Submission (100%) day 109 (14 days) PDT Review Meeting (100%) day 116 (7 days) Contract Documents Submission (Final) day 123 (7 days) Note: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting. -- Specification Requirements -- EXPECTATION: It is the expectation of the VAMC that construction specifications will be accurate, detailed and grammatical. All specifications shall be reviewed by the A/E, prior to submission, for: Spec sections shall not be referenced and not included. The spec section must either be added or the reference deleted. The article numbers for General Requirements articles must be validated and consistent throughout construction documents. (i.e., Article 1.8 Infection Prevention Measures may be called 1.7 Infection Prevention Measures or the referenced article is missing from the General Requirements entirely.) Incomplete editing (i.e., // marks or [ ] brackets). Any missing information needs to be inserted and/or the editing marks deleted. Spec Writer Notes must be deleted from the final document. Paragraph must be numbered with consistent format and sequentially. Spec sections shall be numbered using the current format of 22 05 12 rather than 220512. The Joint Commission (TJC) is the correct name for this organization. It is no longer called The Joint Commission on Accreditation of Healthcare Organizations (JCAHO). Spec section titles shall be validated against the VA Master Specs and shall match the list of specs in the Table of Contents. The contractor shall be referred to consistently throughout the specifications. (i.e., Contractor, General Contractor, Prime Contractor shall not be used to refer to the same individual or company. This must be consistent.) The COTR shall be referred to consistently throughout the specifications. (i.e., COTR, RE, COTR, COR, shall not be used to refer to the same individual. This must be consistent.) Acronyms shall be spelled out in full followed by the acronym in parentheses the first time it is used. The acronym may be used thereafter. Guarantee Period Services (GPS) If GPS are included, it is limited to those sections pre-approved for GPS in IL 049-05-9 dated 4-4-05 (unless the COTR obtains approval from Office of Construction and Facilities Mgt.) and limited to one year of GPS unless it is a CASCA (no year) funded project.  If GPS is included, there should be bid item(s) for GPS which are NOT ALTERNATES, and the bid item(s) must be included in the General Requirements under 1.2, Statement of Bid Items. Brand Name Only: Must be justified by the spec writer & approved by the CO if under $500K and approved by the HCA if over $500K. (Justification & Approval must be posted along with the solicitation.) Justification must include a description setting forth those salient physical, functional, or other characteristics of the referenced product which are essential to the minimum needs of the Govt. Brand Name or Equal: (It is often difficult to tell whether a product specified is brand name or equal or brand name only, especially if the spec says the product is the basis of design and does not include or equal after the brand name). Or Equal must follow the brand name. Solicitation should list all the known acceptable brand name products. Must include a description in the solicitation setting forth the salient physical, functional, or other characteristics of the referenced products which are essential to the minimum needs of the Government. The spec writer must provide a justification to the CO for use of brand name only. -- Design Requirements/Submissions -- EXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.va.gov.facmgt/standard/aeinfo/aesubmin.doc. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects) DELIVER: All design packages directly to the Project Engineer on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://vaww.va.gov/facmgt/standard/aeinfo/aesubmin.doc 25% Design Development Submission: Attachment A 25% Submission Requirements Checklist of Requirements for the 25% Design Development Submission. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development) Identify Working Drawings scope within construction budget Identify impact of existing asbestos Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA. DER, EPA, NEC, NFPA 101 Life Safety Code. Identify all design calculations Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals. 50% Design Development Submission: Attachment B 50% Submission Requirements Checklist of Requirements for the 50% Design Development Submission. Address all comments from the 25% Submission review. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (50% Design Development) Identify Working Drawings scope within construction budget. Identify impact of existing asbestos Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA. DER, EPA, NEC, NFPA 101 Life Safety Code. Identify all design calculations Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. Develop Infection Control Risk Assessment 75% Design Development Submission: Attachment C 75% Submission Requirements Checklist of Requirements for the 75% Design Development Submission. Address all comments from the 50% review. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development) Identify Working Drawings scope within construction budget. Finalize impact of existing asbestos Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA. DER, EPA, NEC, NFPA 101 Life Safety Code. Identify all design calculations Present the energy assessment comparing predicted energy usage of new system vs. existing system. Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. Develop Infection Control Risk Assessment (VA EC-43) Architect/Engineer shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The architect/engineer shall provide the designated firm with a complete copy of the 75% document submission for review and comment. The designated firm will return comments to both the architect/engineer and the VA Project Engineer prior to the corresponding review meeting. 100% Design Development Submission: Attachment D 100% Submission Requirements Checklist of Requirements for the 100% Design Development Submission. Address all comments from the 75% review. Design all finishes, required submittals. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. Revise and update cost estimate Preparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission Finalize all design calculations Finalize all potential bid deduct alternatives Finalize all phasing requirements for construction Finalize Infection Control Risk Assessment (VA EC-43) Address all comments from the VISN Safety and Fire Protection Review Contract Documents (CD) Submission: Attachment E Submission Requirements Submit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. -- Construction Period Services PROVIDE: Assist the VA to determine whether the contractor or subcontractor meets qualification requirements, supported by written recommendations of any problems or litigation encountered in past based on firsthand knowledge. Review all material submittals, shop drawings and test reports (if required), etc and provide recommendatiAttachments
Contacts
- Katelyn Fallon, Contract Specialist
Email and phone are in the source notice.
More from United States Department of Veterans Affairs posted in January 2026